Is Equipment Installed as Part of Building Renovations a “Product” or “Construction”?
April 10, 2019 —
Joshua Lane - Ahlers Cressman & Sleight PLLCA statute of repose terminates the right to file a claim after a specified time even if the injury has not yet occurred.[1] The construction statute of repose bars claims arising from construction, design, or engineering of any improvement upon real property that has not accrued within six years after substantial completion.[2] But what constitutes an “improvement upon real property” necessitating application of the six-year bar, and when does the bar NOT apply?
The Washington Court of Appeals recently addressed these questions in Puente v. Resources Conservation Co., Int’l.[3] There, the personal representative of the estate of Javier Puente sued several parties after Mr. Puente, an employee of a manufacturer, suffered fatal boric acid burns in 2012 while performing maintenance on a pump system installed at the manufacturer’s facility in 2002. The estate alleged claims of negligence and liability under the Washington Product Liability Act (WPLA).[4] The trial court granted summary judgment to defendants, concluding that the installed pump system constituted a statutory “improvement upon real property” and the six-year statute of repose applied. The estate appealed.
Read the court decisionRead the full story...Reprinted courtesy of
Joshua Lane, Ahlers Cressman & Sleight PLLCMr. Lane may be contacted at
joshua.lane@acslawyers.com
A New Digital Twin for an Existing Bridge
May 01, 2023 —
Aarni Heiskanen - AEC BusinessThe smartBRIDGE Hamburg project devised a digital twin of a 1970s bridge using open BIM technologies. Allplan and Solibri were instrumental in developing the twin that enables the Hamburg Port Authority, HPA, to maintain the critical infrastructure asset predictively.
Built in 1974, the Köhlbrand Bridge is Germany’s second-longest road bridge and one of its busiest. The cable-stayed bridge serves around 36,000 vehicles daily, thus being crucial to the local economy.
The age of the bridge and the amount of daily traffic it supported meant that continuous real-time monitoring was the best way to identify repairs and minimize disruption to traffic.
Read the court decisionRead the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
Staten Island Villa Was Home to Nabisco 'Nilla' Wafer Inventor
July 09, 2014 —
Laura Vecsey – BloombergThe imposing and historic Staten Island mansion that once belonged to Gustav A. Mayer — the 19th century inventor who cooked up the recipe for the Nabisco “Nilla” wafer — has been listed for sale for $1.79 million.
Although the estate has been rumored to be haunted, listing broker Jungho Kim of the Level Group confirmed, “This is not a haunted house.”
In fact, the only spirits that have inhabited this mansion are the models and photographers who have used portions of the Gustav Mayer House as a spectacular setting for photo shoots.
The mansion rents out about 3,000 square feet of the 7,700-square-foot home for photo shoots that wind up in the pages of Vogue, Harper’s Bazaar, W, Elle and New York Magazine.
Read the court decisionRead the full story...Reprinted courtesy of
Laura Vecsey, Bloomberg
Construction Contract’s Scope of Work Should Be Written With Clarity
March 06, 2023 —
David Adelstein - Florida Construction Legal UpdatesThe scope of work section in your construction contract should never be overlooked. In numerous instances, it is overlooked which leads to a dispute as to the precise nature of the scope of work. This dispute could be the result of an ambiguity in the scope of work section. Or it could be the result of an omission. Or it could be the result of a lack of clarification. Or it could be the result of not properly reviewing and vetting the scope of work section. This is a section—whether included in the body of your contract or attached as an exhibit—you absolutely, positively want clarity. Otherwise, you are potentially setting yourself up for a future dispute that could include (i) an additional work / change order dispute, (ii) an incomplete work dispute, or (iii) a failure to properly perform your work dispute. These are all disputes you want to avoid, and many times can avoid, by going through and negotiating the scope of work section to bring clarity to this section. Remember, clarity is a positive. Ambiguity or uncertainty is a negative.
An example of such an avoidable scope of work dispute can be found in All Year Cooling and Heating, Inc. v. Burkett Properties, Inc., 2023 WL 2000991 (Fla. 4th DCA 2023). Here, an air conditioning contractor was hired to install six new split air conditioning systems. The scope of work provided that there were currently “two split systems that are currently existing, working perfectly and are not to be replaced as part of this contract.” The property manager claimed the air conditioning contractor was required to bring these two existing split air conditioning systems up to code as the contract provided that notwithstanding anything to the contrary, the contractor “will certify and shall ensure that all split systems in the building, upon completion of all the work, will be fully compliant with all codes and regulations and shall be responsible for any costs relates to the implementation and/or remediation of same.”
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
How the Election Could Affect the Housing Industry: Steven Cvitanovic Authors Construction Today Article
October 07, 2016 —
Steven M. Cvitanovic – Haight Brown & Bonesteel LLPThough non-policy issues dominating the news cycle have set this presidential election apart, both Hillary Clinton and Donald Trump have recognized the importance of housing and infrastructure investment. In an article for Construction Today, Partner Steven Cvitanovic outlines several challenges facing the real estate development industry, and analyzes how Clinton and Trump might benefit or harm the industry.
Read the court decisionRead the full story...Reprinted courtesy of
Steven M. Cvitanovic, Haight Brown & Bonesteel LLPMr. Cvitanovic may be contacted at
scvitanovic@hbblaw.com
California’s One-Action Rule May Apply to Federal Lenders
June 09, 2016 —
Anthony J. Carucci – Snell & Wilmer Real Estate Litigation BlogCalifornia’s one-action rule provides that “[t]here can be but one form of action for the recovery of any debt or the enforcement of any right secured by mortgage upon real property or an estate for years therein . . . .” Cal. Code Civ. Proc. § 726(a). In other words, the one-action rule prescribes that the only process for recovery of a debt secured by a mortgage or deed of trust is to foreclose on the lien. The rule aims to prevent a multiplicity of actions and vexatious litigation, and to force a beneficiary to look to all of the security as the primary fund for payment of a debt before looking to the trustor’s other assets.
Read the court decisionRead the full story...Reprinted courtesy of
Anthony J. Carucci, Snell & WilmerMr. Carucci may be contacted at
acarucci@swlaw.com
The Enforceability of “Pay-If-Paid” Provisions Affirmed in New Jersey
January 04, 2023 —
Levi W. Barrett, Michael S. Zicherman & Brian Glicos - Peckar & Abramson, P.C.On December 7, 2022, the Appellate Division affirmed the New Jersey Superior Court decision in Jersey Precast v. Tricon Enterprises, Inc. et al., finding that the “pay-if-paid” clause in a material supplier’s purchase order with a general contractor was binding and enforceable. While clauses conditioning a general contractor’s obligation to pay its subcontractors on the general contractor’s receipt of payment from the project owner are not unique – this is the first time that a court in New Jersey has affirmed this practice in a published opinion. [1]
Background
The general contractor, Tricon, sent Jersey Precast its standard form purchase order for the supply of prestressed box beams to fulfill a public improvement contract with Union County. The reverse side of the form purchase order contained standard terms and conditions, and included a pay-if-paid clause drafted by Michael Zicherman, a partner of Peckar & Abramson, P.C. While Jersey Precast provided some draft revisions to the terms and conditions, Tricon never signed the purchase order and the proposed revisions were never accepted. Significantly, Jersey Precast did not attempt to modify the pay-if-paid provision. It later developed that the construction of the project became impossible, and the beams fabricated by Jersey Precast were not used. Tricon invoiced Union County for the cost of the beams, but the County failed to make payment and refused to accept delivery of the beams.
Reprinted courtesy of
Levi W. Barrett, Peckar & Abramson, P.C.,
Michael S. Zicherman, Peckar & Abramson, P.C. and
Brian Glicos, Peckar & Abramson, P.C.
Mr. Barrett may be contacted at lbarrett@pecklaw.com
Mr. Zicherman may be contacted at mzicherman@pecklaw.com
Mr. Glicos may be contacted at bglicos@pecklaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Concerns Over Unstable Tappan Zee Bridge Push Back Opening of New NY Bridge's Second Span
October 02, 2018 —
The New York Daily News - Engineering News-RecordSept. 08 --Big bridge, big scissors, big problems.
A day after an elaborate ribbon-cutting ceremony, the grand opening of the second span of the new Gov. Mario M. Cuomo bridge was postponed over concerns that the remains of the "destabilized" and "dangerous" Tappan Zee Bridge could collapse.
Read the court decisionRead the full story...Reprinted courtesy of
Engineering News-RecordENR may be contacted at
ENR.com@bnpmedia.com