Requesting an Allocation Between Covered and Non-Covered Damages? [Do] Think Twice, It’s [Not Always] All Right.
October 12, 2020 —
Todd Likman - Colorado Construction LitigationAs is often the case in construction defect and other insurance defense litigation, a plaintiff’s claims for relief typically encompass both covered and uncovered damages. Obviously, it is in the insured’s best interests to have as many damages covered by insurance as possible. From the insurer’s perspective and against the backdrop of owing duty of good faith and fair dealing to its insureds, however, it is generally better to have an allocation of covered vs. non-covered damages. This places the insurer, insured, and insurance retained defense counsel in a difficult position.
A recent opinion from U.S. District Court for the District of Colorado, Rockhill Ins. Co. v. CFI-Global Fisheries Mgmt, Civil Action No. 1:16-CV-02760-RM-MJW, 2020 U.S. Dist. LEXIS 35209 (D. Colo. Mar. 2, 2020), sheds light on the issue, even though some may feel it only further muddies already murky waters.
Rockhill involved review of an arbitration proceeding that property-owner, Heirloom I, LLC (“Heirloom”) filed against CFI-Global Fisheries Management (“CFI”). Rockhill Insurance Company (“Rockhill Insurance”) was asked to defend the arbitration as CFI’s professional and general liability insurer. At issue in the arbitration was Heirloom’s claim that CFI defectively designed and constructed a fisheries enhancement that was destroyed by natural processes four times in three years.
Read the court decisionRead the full story...Reprinted courtesy of
Todd Likman, Higgins, Hopkins, McLain & RoswellMr. Likman may be contacted at
likman@hhmrlaw.com
Carwash Prosecutors Seek $1.6 Billion From Brazil Builders
February 26, 2015 —
Sabrina Valle – Bloomberg(Bloomberg) -- Some of Brazil’s biggest building companies were targeted for the first time in an investigation into alleged kickbacks at Petroleo Brasileiro SA, with prosecutors seeking 4.47 billion reais ($1.6 billion) in compensation.
Federal prosecutors in Parana state accused Camargo Correa, Mendes Junior, OAS, Galvao Engenharia, Grupo Engevix and Sanko of diverting public funds and called for them to be banned from new state contracts, the prosecutors said in an e-mailed statement Friday.
The allegations -- called acao de improbidade in Portuguese, or misconduct action -- mark the first time companies have been singled out in connection with Brazil’s biggest-ever corruption scandal, in which Petrobras executives are accused of accepting bribes from a cartel of builders. Until now, only individuals have been accused of wrongdoing. Executives from companies including OAS and Camargo Correa have been jailed since November as part of the first sweep against contractors in the case known as Carwash.
Read the court decisionRead the full story...Reprinted courtesy of
Sabrina Valle, BloombergMs. Valle may be contacted at
svalle@bloomberg.net
Harborside Condo Construction Defect Settlement Moves Forward
July 09, 2014 —
Beverley BevenFlorez-CDJ STAFFThe Harborside Condominium Owners Association in Bremerton, Washington, “has an agreement to pursue $2.8 million in settlement costs for construction defects,” according to the Kitsap Peninsula Business Journal. Back in March of 2013, the association “filed a list of defects in its lawsuit against Kitsap County Consolidated Housing Authority [Housing Kitsap]” including water issues, drywall and foundation cracks, uneven cabinets, leaking showers and pipes, as well as other issues.
Housing Kitsap agreed that the association “has the right to pursue a settlement of $2.8 million from the authority’s contractors and insurance companies.” Marlyn Hawkins, the association’s attorney, stated that they have already received a payment for $840,000 from the insurance company “and will be negotiating or filing suit for the rest of the $2.8 million.”
Read the court decisionRead the full story...Reprinted courtesy of
Mitigate Construction Risk Through Use of Contingency
April 26, 2021 —
Laurie A. Stanziale - Construction ExecutiveMitigation of risk and costs in a construction project are always priorities for owners. In some contracts, in particular, Guaranteed Maximum Price contracts, some of those monetary risks are shifted to the contractor. Contingency is important because it allows for money to be in the budget for the unexpected and to keep the project moving, which benefits everyone.
WHAT IS CONTINGENCY?
Contingency is an amount of money built into the contractor’s price to complete the project to address unforeseen (although sometimes very common) costs that arise. This sum of money is generally referred to as the contractor’s contingency. The amount of the contingency is a balance struck between having money on hand to address the unexpected while also not unnecessarily tying up money that could otherwise be used for the project. Contingency is typically 5-10% of the hard costs. However, how the money is actually allocated during the project is not always well thought out, which can be the source of problems during the project.
The contractor’s contingency is not to be confused with an owner’s contingency (or reserve) which is outside of the contractor’s budget and generally used for owner driven changes to the project, such as changes to scope, design and schedule.
Reprinted courtesy of
Laurie A. Stanziale, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Client Alert: Restaurant Owed Duty of Care to Driver Killed by Third-Party on Street Adjacent to Restaurant Parking Lot
January 07, 2015 —
R. Bryan Martin, Lawrence S. Zucker II, & Kristian B. Moriarty – Haight, Brown, & Bonesteel, LLPIn Annocki v. Peterson Enterprise, LLC, (Filed 11/14/2014, Certified for Publication 12/5/2014, No. B251434) the Court of Appeal, Second District, held a restaurant owed a duty of care to the driver of a motorcycle who died as a result of the negligent driving of a third party exiting the restaurant’s parking lot.
Decedent, Joseph M. Annocki, was driving his motorcycle on Pacific Coast Highway in Malibu, when it collided with the vehicle operated by Terry Allen Turner, who was exiting the parking lot of “Geoffrey’s" restaurant, which was owned and operated by the Defendant, Peterson Enterprise, LLC (“Peterson”).
The parents of the decedent (“Plaintiffs”) filed suit against Peterson, alleging Peterson failed to adequately staff the restaurant parking lot, which caused Turner to become confused and make an illegal left turn onto Pacific Coast Highway, thereby causing the accident that killed decedent. Plaintiffs further alleged Peterson knew, or should have known, that its parking lot and driveway were designed and in such condition as to create a danger of decreased visibility of the adjacent highway, and failed to adequately provide signage directing patrons that only right turns could be made onto Pacific Coast Highway.
Reprinted courtesy of Haight Brown & Bonesteel LLP attorneys
R. Bryan Martin,
Lawrence S. Zucker II and
Kristian B. Moriarty
Mr. Martin may be contacted at bmartin@hbblaw.com
Mr. Zucker may be contacted at lzucker@hbblaw.com
Mr. Moriarty may be contacted at kmoriarty@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
National Infrastructure Leaders Visit Dallas' Able Pump Station to Tout Benefits of Water Infrastructure Investment
September 25, 2023 —
American Society of Civil EngineersDALLAS, TX. — An award-winning pump station in south downtown Dallas that protects residents from the Trinity River today was showcased by the
national Engineering and Public Works Roadshow as an example of how infrastructure investment can improve the resilience of a community, protect residents, and encourage economic growth.
The Able Pump Station in downtown Dallas, Texas won awards from both the American Council of Engineering Companies and the American Society of Civil Engineers since its completion in 2019 and has been credited with providing 100-year flood protection to approximately three square miles of high-profile land that was historically vulnerable to severe flooding events from the Trinity River.
The Engineering and Public Works Roadshow is a joint project of the
American Council of Engineering Companies (ACEC), the
American Public Works Association (APWA), and the
American Society of Civil Engineers (ASCE).
The properties adjacent to the previous Able sump complex had experienced frequent flooding. The sump complex included nine separate and interconnected ponds that store stormwater, as well as two existing pump stations, constructed in the 1930s and 1950s, with a combined capacity of 220,000 gallons per minute. To help prevent the loss of life as a result of flooding, the City of Dallas hired HDR to design the new Able Pump Station, which increases the pumping capacity nearly fourfold, to 875,000 gallons per minute. It also lowers the 100-year flood elevation from 399.0 to a design elevation of 392.5 feet.
As the federal government continues to implement this monumental legislation, the second year of the Bipartisan Infrastructure Law will not be fully realized without an expanded and robust workforce. It is imperative that students nationwide are educated on the rewarding careers of civil engineering and public works so that these professions have the necessary staffing to complete transformative projects.
Read the court decisionRead the full story...Reprinted courtesy of
Patriarch Partners Decision Confirms Government Subpoenas May Constitute a “Claim” Under D&O Policy; Warns Policyholders to Think Broadly When Representing Facts and Circumstances to Insurers
January 08, 2019 —
Michael S. Levine, Sergio F. Oehninger, & Joshua S. Paster - Hunton Andrews KurthThe Second Circuit recently confirmed in Patriarch Partners, LLC v. Axis Insurance Co. that a warranty letter accompanying the policyholder’s insurance application barred coverage for a lengthy SEC investigation, which ripened into a “Claim” prior to the policy’s inception date. The opinion left intact the lower court’s finding that the SEC subpoena constituted a “demand for non-monetary relief” and thus qualified as a “Claim” under the directors and officers (D&O) insurance policy.
Reprinted courtesy of Hunton Andrews Kurth attorneys
Michael S. Levine,
Sergio F. Oehninger and
Joshua S. Paster
Mr. Levine may be contacted at mlevine@HuntonAK.com
Mr. Oehninger may be contacted at soehninger@HuntonAK.com
Mr. Paster may be contacted at jpaster@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
Building Growth Raises Safety Concerns
November 20, 2013 —
CDJ STAFFWith the resurgence of the construction industry, another trend is going up and it’s not good. The workplace fatality rate for the construction industry has increased for the first time since 2006, according to a new report from Marsh Risk Consulting, based on data from the U.S. Bureau of Labor Statistics.
The increase to 9.5 deaths per 100,000 workers is attributed to “an influx of new, inexperienced workers” and that “some contractors are stretching their hiring standards to meet project demands.”
Read the court decisionRead the full story...Reprinted courtesy of