A Survey of Trends and Perspectives in Construction Defect Decisions
November 27, 2013 —
CDJ STAFFThomas F. Segella, Ellen H. Greiper, and Matthew S. Lerner, partners at the firm Goldberg Segalia, together with Suzin L. Raso, an associate of the firm, have prepared a wide-ranging survey of cases, in their commentary, “Emerging Trends and Changing Perspectives on Construction Defect Claims.
The authors examine 11 coverage cases, representing decisions from eight states, and 15 cases of litigation, here covering 11 states. In each case, they give a one-sentence summary, a further discussion of the case, and they end with a practice note.
They start with Alabama, noting that the court found that “faulty workmanship is not an occurrence,” looking at the recent case of Owners Insurance Co. v. Jim Carr Homebuilders, LLC. Here they note that under Alabama law, “there was no damage to personal property or property of others; therefore, there was no ‘occurrence.’” They also note that “the policy involved did not contain a ‘subcontractor exception.’”
In Georgia, they noted, the courts concluded that “damage to insured’s completed work is an ‘occurrence.’” Here they cite a recent decision of the Georgia Supreme Court, noting that the court looked at cases from Connecticut, South Carolina, Illinois, Texas, as well as the Fourth and Tenth Circuits.
Under litigation, they look at such aspects of construction defect litigation such as the application of the economic loss doctrine in Kansas and Florida, and how the courts view arbitration agreements in states including New Jersey, Louisiana, and Colorado.
Read the court decisionRead the full story...Reprinted courtesy of
Connecticut Appellate Court Breaks New Ground on Policy Exhaustion
April 26, 2021 —
Eric B. Hermanson & Austin D. Moody - White and WilliamsThe Connecticut Appellate Court recently issued a wide-ranging opinion, Continental Casualty Co. v. Rohr, Inc.,[1] which significantly extended the current restrictive view on when a general liability policy can be considered exhausted so as to trigger overlying excess coverage. The case marks a further step away from Judge Augustus Hand’s almost-century-old ruling in Zeig v. Massachusetts Bonding & Ins. Co.,[2] which held that an underlying policy could be “exhausted” by a below-limits settlement as long as the insured was willing to “fill the gap” between the settlement amount and the limits of the policy.[3]
In recent years, courts in California and elsewhere have increasingly walked back Zeig’s broad ruling – holding in Qualcomm v. Certain Underwriters,[4] for example, that an insured’s below-limits settlement with primary carriers does not exhaust the limits of primary coverage, or allow the insured to access overlying excess coverage.[5]
Reprinted courtesy of
Eric B. Hermanson, White and Williams and
Austin D. Moody, White and Williams
Mr. Hermanson may be contacted at hermansone@whiteandwilliams.com
Mr. Moody may be contacted at moodya@whiteandwilliams.com
Read the court decisionRead the full story...Reprinted courtesy of
Federal Miller Act Payment Bond Claim: Who Gets Paid and Who Does Not? What Are the Deadlines?
September 16, 2019 —
William L. Porter - Porter Law GroupWhen working on federal public works construction projects there are no Stop Payment Notice or Mechanics Lien remedies available to protect subcontractors’ and suppliers’ right to payment. Instead, unpaid subcontractors and suppliers must resort to making a claim for payment under a federal law known as the AMiller Act@ (40 USCS 3131 et seq.). Many claimants however, do not realize that the right to make a Miller Act claim is not available to all subcontractors and suppliers. Before committing to performing work on a federal project it is important for subcontractors and suppliers to understand whether or not a Miller Act claim will be available. For those who have no Miller Act rights, careful consideration must be given to whether it is worth the risk to take on the project. For those who have valid Miller Act claim rights, important deadlines must be considered.
Who Gets Paid Under a Miller Act and Who Does Not
For federal projects in excess of $100,000, contractors who have a contract directly with the Federal Government must obtain Miller Act Payment Bond intended for the protection of Subcontractors, laborers and material suppliers to the project.
As a general rule, every subcontractor, laborer, or material supplier who deals directly with the prime contractor and is unpaid may bring a lawsuit for payment against the Miller Act Payment Bond. Further, every unpaid subcontractor, laborer, or material supplier who has a direct contractual relationship with a first-tier subcontractor may bring such an action. The deadlines for these claims are described below.
Read the court decisionRead the full story...Reprinted courtesy of
William L. Porter, Porter Law GroupMr. Porter may be contacted at
bporter@porterlaw.com
California Supreme Court Adopts “Vertical Exhaustion” in the Long-Storied Montrose Environmental Coverage Litigation
June 08, 2020 —
Gregory S. Capps & Michael E. DiFebbo - White and Williams LLPOn April 6, 2020, the California Supreme Court issued a decision that held a policyholder is entitled to access available excess coverage under any excess policy once it has exhausted directly underlying excess policies for the same policy period in Montrose Chemical Corporation v. the Superior Court of Los Angeles County, Supreme Court of California, case number S244737. In its unanimous decision adopting this “vertical exhaustion” requirement, the court rejected the “horizontal exhaustion” rule urged by the policyholder’s excess insurers, under which the policyholder would have been able to access an excess policy only after it had exhausted other policies with lower attachment points from every policy period in which the environmental damage resulting in liability occurred.
In 1990, Montrose sought coverage under primary policies and multiple layers of excess policies issued for periods from 1961 through 1985 for environmental damage liabilities arising from its production of insecticide in the Los Angeles area between 1947 and 1982. The ongoing dispute currently arises out of Montrose’s Fifth Amended Complaint which was filed in 2015 seeking declarations concerning exhaustion and the manner in which Montrose may allocate its liabilities across the policies. Each of the excess policies at issue contained a requirement of exhaustion of underlying coverage. The various policies described the applicable underlying coverage in four main ways: (1) some policies contained a schedule of underlying insurance listing all of the underlying policies in the same policy period by insurer name, policy number, and dollar amount; (2) some policies referenced a specific dollar amount of underlying insurance in the same policy period and a schedule of underlying insurance on file with the insurer; (3) some policies referenced a specific dollar amount of underlying insurance in the same policy period and identified one or more of the underlying insurers; and (4) some policies referenced a specific dollar amount of underlying insurance that corresponds with the combined limits of the underlying policies in that policy period. The excess policies also provided, in various ways, that “other insurance” must be exhausted before the excess policy can be accessed.
Reprinted courtesy of
Gregory S. Capps, White and Williams LLP and
Michael E. DiFebbo, White and Williams LLP
Mr. Capps may be contacted at cappsg@whiteandwilliams.com
Mr. DiFebbo may be contacted at difebbom@whiteandwilliams.com
Read the court decisionRead the full story...Reprinted courtesy of
Vancouver’s George Massey Tunnel Replacement May Now be a Tunnel Instead of a Bridge
January 06, 2020 —
Tim Newcomb - Engineering News-RecordThe constant political back-and-forth in British Columbia, Canada, over how to deal with an aging George Massey Tunnel, opened in 1959, has ping-ponged from uncertainty to a $3.5 billion, 10-lane bridge, back to uncertainty, to no bridge and now to an eight-lane submerged tunnel.
Tim Newcomb, Engineering News-Record
ENR may be contacted at ENR.com@bnpmedia.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Arizona Supreme Court Confirms Eight-Year Limit on Construction Defect Lawsuits
July 18, 2011 —
CDJ STAFFActing on the case of Albano v. Shea Homes Ltd. Partnership, the Arizona Supreme Court has ruled that Arizona’s eight-year statute of repose applies. The case was referred to the court by the Ninth Circuit Court of Appeals which had asked for a clarification of Arizona law. The case focused on three questions:
1. Does the filing of a motion for class certification in an Arizona court toll the statute of limitations for individuals, who are included within the class, to file individual causes of action involving the same defendants and the same subject matter?2. If so, does this class-action tolling doctrine apply to statutes of repose, and more specifically, to the statute of repose for construction defects set forth in Arizona Revised Statutes ("A.R.S.") § 12-552?3. If the doctrine applies to statutes of repose, and specifically § 12-552, may a court weigh the equities of the case in determining whether, and to what extent, an action is tolled?
The litigation at hand has a lengthy history, starting with a case referred to as “Hoffman” in 2003. The Albano plaintiffs were not able to join in Hoffman, and they filed their own lawsuit in 2006. An additional lawsuit was filed by the Albano plaintiffs in 2007. The courts decided that the Albano plaintiffs’ lawsuit was untimely.
The Arizona Supreme Court concluded that the statute of repose was the appropriate standard for this case. They noted that “the eight-year statute of repose period began to run on November 6, 1997, the date of the Town of Gilbert’s final inspection. Albano II was filed on November 5, 2007.”
The court found that the plaintiffs had waited too long for start their suit. As a result, they found it unnecessary to answer the first or third questions. Justice A. John Pelander of the Arizona Supreme Court wrote the opinion, dated June 30, 2011.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Architect, Engineer, and Design Professional Liens in California: A Different Animal than the Mechanics’ Lien
August 15, 2022 —
William L. Porter - Porter Law GroupMost in the construction industry are familiar with the rules governing California mechanics’ liens. They know that the Preliminary Notice of Civil Code Section 8034 and 8200-8216 is an important foundational prerequisite document and that the deadline to record a mechanics’ lien is generally triggered by events occurring at the end of construction, including completion of the work of improvement and/or the recording of the notice of completion or notice of cessation. Most of these rules are found in California Civil Code sections 8160-8494.
While architects, engineers and other design professionals are certainly entitled to pursue a mechanics’ lien at the end of a construction project when they are unpaid for their work, unless they also consider the remedy available to them under the California “design professional lien,” they are missing a powerful opportunity to preserve the right to payment only available to architects, engineers, and design professionals.
Read the court decisionRead the full story...Reprinted courtesy of
William L. Porter, Porter Law GroupMr. Porter may be contacted at
bporter@porterlaw.com
ABC Safety Report: Construction Companies Can Be Nearly 6 Times Safer Than the Industry Average Through Best Practices
May 06, 2024 —
Associated Builders and ContractorsWASHINGTON, April 30, 2024 (GLOBE NEWSWIRE) -- Associated Builders and Contractors today announced the findings from its
2024 Safety Performance Report, an annual guide to construction jobsite health and safety best practices. The report is unveiled to coincide with
Construction Safety Week, May 6-10.
The annual safety report also provides a comprehensive understanding of the impact of deploying
ABC's STEP Safety Management System, which enables top-performing ABC members to achieve incident rates 576% safer than the U.S. Bureau of Labor Statistics construction industry average. Established in 1989, STEP provides contractors and suppliers with a robust, no-cost framework for measuring safety data and benchmarking with peers in the industry.
ABC's research on more than 900 million work hours completed by participants in the construction, heavy construction, civil engineering and specialty trades in 2023 identified the following foundations of industry-leading safety best practices:
- Top management engagement: Employer involvement at the highest level of company management produces a 54% reduction in total recordable incident rates, or TRIR, and a 52% reduction in days away, restricted or transferred rates, or DART rates.
- Substance abuse prevention programs: Robust substance abuse prevention programs/policies with provisions for drug and alcohol testing where permitted lead to a 47% reduction in TRIR and a 48% reduction in DART rates.
- New hire safety orientation: Companies that conduct an in-depth indoctrination of new employees into the safety culture, systems and processes based on a documented orientation process experience incident rates that are 45% lower than companies that limit their orientations to basic health and safety compliance topics.
- Frequency of toolbox talks: Companies that conduct daily, 15-to-30-minute toolbox talks reduce TRIR and DART rates by 81% compared to companies that hold them monthly.
The 2024 ABC Safety Performance Report is based on submissions of unique company data gathered from members that deployed during the 2023 STEP term, Jan. 15-Dec. 15. ABC collects each company's trailing indicator data as reported on its annual Occupational Safety and Health Administration Form 300A ("Summary of Work-Related Injuries and Illnesses") and its self-assessment of leading indicator practices from its STEP application. Each data point collected is sorted using statistically valid methodology developed by the BLS for its annual Occupational Injuries and Illnesses Survey and then combined to produce analyses of STEP member performance against BLS industry average incident rates. The report demonstrates that applying industry-leading processes dramatically improves health and safety performance among participants regardless of company size or type of work.
Any company can participate in STEP. Visit abc.org/step to begin or continue your safety journey.
Read the court decisionRead the full story...Reprinted courtesy of