CGL Policies and the Professional Liabilities Exclusion
August 14, 2018 —
David Adelstein - Florida Construction Legal UpdatesCommercial general liability (CGL) policies for contractors traditionally contain a professional liabilities exclusion. This exclusion is generally added through a specific endorsement to eliminate coverage for professional services. Read the endorsement The point of the exclusion, in a nutshell, is simply to eliminate a CGL policy for a contractor serving as a professional liability policy.
Contractors need to appreciate a professional liabilities exclusion added through endorsement because oftentimes there are delegated design components they are responsible for. Perhaps the contractor value engineered a system and is responsible for engineering and signing and sealing the engineered documents (through its subcontractor) associated with that system. Perhaps there is a performance specification that requires the contractor to engineer a system. Perhaps there is a design-build component. Regardless of the circumstance, this professional liabilities exclusion can certainly come into play, particularly if a defect is raised with the design or professional services associated with the engineered system.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
Supreme Court of Idaho Rules That Substantial Compliance With the Notice and Opportunity to Repair Act Suffices to Bring Suit
July 31, 2018 —
Lian Skaf - The Subrogation StrategistIn Davison v. Debest Plumbing, Inc., 416 P.3d 943 (Ida. 2018), the Supreme Court of Idaho addressed the issue of whether plaintiffs who provided actual notice of a defective condition, but not written notice as stated in the Notice and Opportunity to Repair Act (NORA), Idaho Code §§ 6-2501 to 6-2504, et. seq., substantially complied with the act and if the plaintiffs’ notice was sufficient to bring suit. Section 6-2503 of the NORA states that, “[p]rior to commencing an action against a construction professional for a construction defect, the claimant shall serve written notice of claim on the construction professional. The notice of claim shall state that the claimant asserts a construction defect claim against the construction professional and shall describe the claim in reasonable detail sufficient to determine the general nature of the defect.” Any action not complying with this requirement should be dismissed without prejudice. The court held that the defendant’s actual notice of the defect was sufficient to satisfy the objectives of the NORA and, thus, the plaintiffs’ action complied with the NORA.
In Davison, Scott and Anne Davison hired general contractor Gould Custom Builders (Gould) to remodel a vacation home in McCall, Idaho. Gould subcontracted out the plumbing work to Debest Plumbing (Debest). This work included installing a bathtub. When the Davisons arrived at their home for the first time on July 25, 2013, they noticed a leak from the subject bathtub. The Davisons contacted Gould and, the next morning, Gil Gould arrived with a Debest employee to inspect the home. In addition to inspecting the home, the Debest employee repaired the leak and helped Gould remove some water-damaged material.
Read the court decisionRead the full story...Reprinted courtesy of
Lian Skaf, White and Williams, LLPMr. Skaf may be contacted at
skafl@whiteandwilliams.com
A Changing Climate for State Policy-Making Regarding Climate Change
February 18, 2020 —
Sheila McCafferty Harvey - Gravel2Gavel Construction & Real Estate Law BlogIssued by 13 federal agencies, the 2018 Fourth National Climate Assessment presented a stark warning on the consequences of climate change for the United States. The report predicts that if significant steps are not taken to rein in global warming, the damage will reduce the U.S. economy by as much as 10 percent by the end of the century. The report, which was mandated by Congress and made public by the White House, is notable not only for the precision of its calculations and bluntness of its conclusions—the 1,656-page assessment lays out the devastating effects of a changing climate on the economy—but also in how it conflicts with President Donald Trump’s environmental deregulation plan. U.S. policy efforts at the state and local levels are ramping up to address this complex topic. These include:
Targeting Net-Zero Emissions. Hailed as the most aggressive climate law in the nation, New York State’s Climate Leadership and Community Protection Act are targeting 100 percent carbon-free electricity by 2040 and economy-wide, net-zero carbon emissions by 2050. California set a statewide target to reach carbon neutrality by 2045.
Reducing and Renewing. New Mexico established a statewide goal of reducing greenhouse gas emissions by 45 percent below 2005 levels by 2030. Nevada passed a bill to increase the amount of electricity it gets from renewable resources to 50 percent by 2030.
Read the court decisionRead the full story...Reprinted courtesy of
Sheila McCafferty Harvey, PillsburyMs. Harvey may be contacted at
sheila.harvey@pillsburylaw.com
New ConsensusDocs 242 Design Professional Change Order Form Helps Facilitate Compensation for Changes in Design Services
November 05, 2024 —
Brian Perlberg - ConsensusDocsConsensusDocs is publishing a new ConsensusDocs 242 Change in Services and Compensation, a change order for design services by a design professional. In the design and construction industry, one thing is certain – change. The work scope included in basic design services an architect or engineer provides occurs somewhat regularly. Previously, ConsensusDocs did not have a standard contract document for changing design professionals’ prices. As a result of user feedback, the ConsensusDocs Contract Content Advisory Council (CCAC) drafted this new architect/engineer change order. The CCAC unanimously approved the new contract document and publication is set for October 14, 2024. The document will be available for most ConsensusDocs subscribers. The full, owner, design-professional, and short-form subscription packages will include the document. A subscription package can be purchased through ConsensusDocs here.
The design professional change order helps owners of construction projects keep track of additional services their design professionals perform. The design professional must provide itemized labor breakdowns for each invoice. The new ConsensusDocs 242 has options for compensation to be actual hours at the billing rate or a lump sum. The new contract document form also has a table for the remaining project deliverables and their respective due dates.
Read the court decisionRead the full story...Reprinted courtesy of
Brian Perlberg, ConsensusDocs CoalitionMr. Perlberg may be contacted at
bperlberg@ConsensusDocs.org
Overtime! – When the Statute of Limitations Isn’t Game Over For Your Claim
August 07, 2022 —
Bradley E. Sands, Jones Walker LLP - ConsensusDocsStatutes of limitations establish the period of time within which a claimant must bring an action after it accrues. An action can be filing a lawsuit and, in some instances, filing a demand for arbitration. But a multi-year construction project could be longer than the applicable statute of limitations. For example, under Delaware or North Carolina law, the statute of limitations for a breach of contract is only three years.1 So a claim for breach of a construction contract that occurred (i.e. accrued) at the beginning of a four-year project under Delaware or North Carolina law may expire before the project is completed.
Generally, a claim accrues at the time of the breach (however, it is important to note that this is not always the case and claim accrual could be the subject of an entirely different article). During the course of a multi-year construction project, proposed change orders or claims for additional compensation can sit, unanswered or unpursued, for months. Or, the parties may informally agree as part of regular project communications to put off dealing with a claim head-on until the end of the project. On certain projects, slow-walking a claim is understandable, as a contractor may be hesitant to sue an owner in the middle of a multi-year project and risk upsetting an otherwise good working relationship. But a delay in formally asserting a put-off claim after it accrues could result in the claim falling subject to a statute of limitations defense.
Read the court decisionRead the full story...Reprinted courtesy of
Bradley E. Sands, Jones Walker LLP (ConsensusDocs)Mr. Sands may be contacted at
bsands@joneswalker.com
Best Lawyers® Recognizes 43 White and Williams Lawyers
September 07, 2020 —
White and Williams LLPThirty-three White and Williams lawyers were recognized in The Best Lawyers in America© 2021. Inclusion in Best Lawyers® is based entirely on peer-review. The methodology is designed to capture, as accurately as possible, the consensus opinion of leading lawyers about the professional abilities of their colleagues within the same geographical area and legal practice area. Best Lawyers® employs a sophisticated, conscientious, rational, and transparent survey process designed to elicit meaningful and substantive evaluations of quality legal services.
In addition, ten associates were recognized as "Ones to Watch” by Best Lawyers®. This recognition is given to attorneys who are earlier in their careers for outstanding professional excellence in private practice in the United States.
We are also pleased to announce two
White and Williams partners have been named Best Lawyers® 2021 "Lawyer of the Year" in Philadelphia – Edward F. Beitz, Medical Malpractice Law – Defendants and William J. Taylor - Construction Law. Read the court decisionRead the full story...Reprinted courtesy of
White and Williams LLP
The A, B and C’s of Contracting and Self-Performing Work Under California’s Contractor’s License Law
July 19, 2017 —
Garret Murai - California Construction Law BlogThe California Contractors State License Board issues licenses in three general classifications:
- Class A – General Engineering Contractors;
- Class B – General Building Contractors; and
- Class C – Specialty Contractors of which there are currently 42 different Class C specialty contractors license types.
Each of these license classifications has separate contracting rules, and rules regarding when work can be self-performed, which for many can be confusing.
Minor Work Exception
One important (albeit “minor”) exception is that no contractor’s license is required no matter what type of work is being performed if the project has a value of less than $500. Known as the “minor work exception,” the exception is a project-based, not work-based, exception. Thus, for example, if a project owner is remodeling their kitchen at a cost of $6,000 and the cost of doing the flooring is only $300, the person doing the flooring would need to have a contractor’s license in the appropriate classification since the aggregate cost of the work is $500 or more.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Wendel Rosen Black & Dean LLPMr. Murai may be contacted at
gmurai@wendel.com
What ENR.com Construction News Gained the Most Views
January 09, 2023 —
C.J. Schexnayder - Engineering News-RecordAs the construction industry continued its ongoing recovery from the global pandemic in 2022, it also faced a number of formidable challenges—including staffing gaps, materials shortages, supply chain delays and the ongoing specter of inflation. Throughout the year, ENR editors reported on how these issues—and many more—were impacting the sector and how it responded.
Reprinted courtesy of
C.J. Schexnayder, Engineering News-Record
Mr. Schexnayder may be contacted at schexnayderc@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of