Court Rules Planned Development of Banning Ranch May Proceed
June 10, 2015 —
Kristian B. Moriarty and Lawrence S. Zucker II – Haight Brown & Bonesteel, LLPIn Banning Ranch Conservancy v. City of Newport Beach (filed 5/20/2015, No. G049691), the California Court of Appeal, Fourth District, held the Environmental Impact Report prepared by the City of Newport Beach for the partial development of Banning Ranch complied with California environmental protection statutes and local ordinances.
Under the California Environmental Quality Act (“CEQA”), a city desiring to approve or carry out a project that may have significant effect on the environment must prepare an environmental impact report (“EIR”) designed to provide the public with detailed information about the effect which a proposed project will have on the environment. The California Coastal Act of 1976 provides for heightened protection of environmentally sensitive habitat areas (“ESHA”) defined as any “area in which plant or animal life or their habitats are either rare or especially valuable because of their special nature or role in an ecosystem and which could be easily disturbed or degraded by human activities and developments.”
In 2006, the City of Newport Beach adopted a General Plan for the physical development of the city. The plan specifically identifies Banning Ranch as having significant value as a wildlife habitat and open space resource for citizens. The general plan includes a primary goal of complete preservation of Banning Ranch as open space. To the extent the primary goal cannot be achieved, the plan identifies a secondary goal allowing limited development of Banning Ranch “to fund preservation of the majority of the property as open space.” The plan also requires the City to coordinate any development with the state and federal agencies.
Reprinted courtesy of
Kristian B. Moriarty, Haight Brown & Bonesteel LLP and
Lawrence S. Zucker II, Haight Brown & Bonesteel LLP
Mr. Moriarty may be contacted at kmoriarty@hbblaw.com; Mr. Zucker may be contacted at lzucker@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Measure Of Damages for Breach of Construction Contract
October 18, 2021 —
David Adelstein - Florida Construction Legal UpdatesHow do you determine damages for a breach of a construction contract? If you are interested in pursing a breach of a construction contract action, this is something you NEED TO KNOW!
The recent Fourth District Court of Appeal’s decision in Cano, Inc. v. Judet, 46 Fla. L. Weekly D2083b (Fla. 4th DCA 201) explains:
Where a contractor breaches a construction contract, and the owner sues for breach of contract and the cost to complete, the measure of damages is the difference between the contract price and the reasonable cost to perform the contract. See Grossman Holdings Ltd. v. Hourihan, 414 So. 2d 1037, 1039-40 (Fla. 1982). In Grossman, the supreme court adopted subsection 346(1)(a) of the Restatement (First) of Contracts (1932), which it concluded was “designed to restore the injured party to the condition he would have been in if the contract had been performed.” Id. at 1039. In other words, the owner will obtain the benefit of his bargain [and this is known as benefit of the bargain damages]. But where there is a total breach of the contract as opposed to a partial breach, an injured party may elect to treat the contract as void and seek damages that will restore him to the position that he was in prior to entering into the contract or the party may seek the benefit of his bargain. See McCray v. Murray, 423 So. 2d 559, 561 (Fla. 1st DCA 1982).
In Judet, an owner entered into a fixed price contract with a contractor to repair damage from a lightning strike. The contract amount was $300,000 payable in $30,000 installments. A few months after the contractor commenced performance, the owner terminated the contractor because the owner learned the contractor had not obtained required electrical and plumbing permits. At this time, the owner had paid the contractor $90,000. The contractor recorded a $40,000 lien for an amount it claimed it was owed and filed a lawsuit to foreclose its construction lien. The owner counter-sued the contractor to recover a claimed over-payment and a disgorgement of monies for unpermitted work. The owner was NOT claiming benefit of the bargain damages, but rather, damages for the contractor’s total breach “to restore him to the position that he was in prior to entering into the contract.”
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Seattle Independent Contractor Ordinance – Pitfalls for Unwary Construction Professionals
October 09, 2023 —
Travis Colburn - Ahlers Cressman & SleightChapter 14.34 of the Seattle Municipal Code is a relatively new ordinance that can affect the parties to a construction contract for work performed within the City of Seattle’s city limits. The Independent Contractor Protection Ordinance (“ICPO”) was enacted to provide self-employed persons, or entities composed of not more than one person, regardless of corporate form, recourse for timely payment for work performed. The ICPO applies to contracts of $600[i] or more between an independent contractor and a hiring entity where the work, in whole or in part, is known to be performed within the City of Seattle’s city limits.[ii] The ICPO cannot be waived by parties to a contract.[iii]
Historically, the primary legal recourse for non-payment or late payment for work performed under a contract involves an expensive breach of contract action, and one reason the ICPO was enacted was to give greater protection to a growing number of Washington independent contractors who report problems with timely and accurate payment.
The ICPO affects “hiring entities” or any individual, partnership, association, corporation, business trust, or any entity, person or group of persons, or a successor thereof, that hires independent contractors to provide services within the scope of a hiring entity’s business or commercial activities. In the construction context, most general contractors, subcontractors, design professionals, and design consultants should be aware of this ordinance, as well as certain owners[iv] and development-side entities.
Read the court decisionRead the full story...Reprinted courtesy of
Travis Colburn, Ahlers Cressman & SleightMr. Colburn may be contacted at
travis.colburn@acslawyers.com
Bidders Shortlisted as Oroville Dam Work Schedule is Set
April 13, 2017 —
JT Long - Engineering News-RecordIn a race to fix the damaged Oroville Dam’s main spillway by November, the California Dept. of Water Resources, the operator of the country’s tallest dam, is going to bid with a 65%-complete design that breaks recovery efforts into three parts, with an ultimate goal of doubling the main spillway’s release capacity to 270,000 cu ft per second.
Read the court decisionRead the full story...Reprinted courtesy of
JT Long, ENRENR may be contacted at
ENR.com@bnpmedia.com
#12 CDJ Topic: Am. Home Assur. Co. v. SMG Stone Co., 2015 U.S. Dist. LEXIS 75910 (N. D. Cal. June 11, 2015)
December 30, 2015 —
Beverley BevenFlorez-CDJ STAFFIn his article, “Remediation Work Caused by Installation of Defective Tiles Not Covered,” attorney
Tred R. Eyerly analyzed the Am. Home Assur. Co. case that involved a dispute between a developer and a subcontractor over fractured tiles: “On cross-motions for summary judgment, the court first found that the fracturing of the stone floor tiles caused by the subcontractor's defective installation was the result of an 'occurrence.' There was no evidence that the subcontractor knew that its tile installation work was defective before the tiles fractured. Instead, the fracturing was an unexpected consequence of the defective installation.”
Everly continues, “But there was no ‘property damage.’ For the subcontractor to prevail, the defective installation work had to be considered separate and distinct from the physical manifestation of the defective work. Under California law, coverage resulted from construction defects that involved physical injuries to other parts of the construction project.” Everly concludes, “Because there was no genuine issues of material fact as to the potential for coverage, there was no duty to defend.”
Read the full story...
Read the court decisionRead the full story...Reprinted courtesy of
Administration Seeks To Build New FBI HQ on Current D.C. Site
February 28, 2018 —
Tom Ichniowski – ENRA Senate committee plans to examine a new $3.3-billion Trump administration proposal to demolish the Federal Bureau of Investigation's worn, outmoded headquarters in downtown Washington, D.C., and construct a new facility on that site.
Read the court decisionRead the full story...Reprinted courtesy of
Tom Ichniowski, Engineering News-RecordMr. Ichniowski may be contacted at
ichniowskit@enr.com
Defenses Raised Three-Years Too Late Estop Insurer’s Coverage Denial
February 21, 2022 —
Michael S. Levine & Yaniel Abreu - Hunton Insurance Recovery BlogLiability insurance typically affords broad defense coverage. But insurers sometimes reserve their right to challenge the insured’s right to a defense, or even outright terminate the defense. When this occurs after the insurer has been in exclusive control of the defense, some courts recognize that the consequences can be catastrophic for the insured defendant. Insurers, therefore, may be estopped from denying coverage where doing so will prejudice the insured. This is exactly what transpired in RLI Ins. Co. v. AST Engineering Corp., No. 20-214 (2d Cir. Jan. 12, 2022), where the Second Circuit affirmed the district court’s decision that an insurer’s attempt to withdraw the defense it had provided to its insured for three years would prejudice the insured.
In AST Engineering, RLI sought a declaration that it did not have to defend the insured, AST, in two underlying cases in which AST was sued as a third-party defendant. The underlying cases concerned a construction project in New York City for which AST provided engineering drawings on October 28, 2012.
Reprinted courtesy of
Michael S. Levine, Hunton Andrews Kurth and
Yaniel Abreu, Hunton Andrews Kurth
Mr. Levine may be contacted at mlevine@HuntonAK.com
Mr. Abreu may be contacted at yabreu@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
Unintended Consequences of New Building Products and Services
April 19, 2022 —
David S. Jaffe – National Association of Home BuildersAs home builders throughout the United States are grappling with building material price surges, and shortages or delays for certain orders, many are exploring alternatives products to complete or start projects. For example, according to a recent article, some builders are constructing homes from natural materials such as rammed earth, adobe brick, and volcanic rock. In addition to being readily available on site there may be heating and cooling benefits due to the natural insulation provided by these materials. The article cautions, however, that using these alternative materials may come with added challenges such as higher costs due to a need for skilled labor, delays by home inspectors who may be unfamiliar with the techniques and methods of construction, and energy consultants who might have difficulty calculating the value of homes with these materials. See Home Builders Are Turning to Natural Materials to Get Around Supply Chain Problems; There are advantages to buying homes made with natural materials, but expect to pay a premium, Alanna Schubach, Mansion Global (March 25, 2022).
Another caution, not addressed in the article, however, but one that should be heeded by builders considering alternative materials, is the unintended consequences that might result from using alternative products, whether they are natural products or any others. The long-term effects of material use should not be ignored.
For instance, it has been reported that earthen materials are known to contain numerous organic substances and can also harbor mold. It was not too long ago that mold was a high liability issue for builders and property owners. Similarly, the use of rapidly renewable materials - products that can be produced naturally and quickly from nature - is a key component of green building. They are also cellulose or carbohydrate-based products and as such are typically optimal food sources for mold in the presence of moisture.
To avoid mold, it is important to understand the relationship between construction materials and their susceptibility to mold in the presence of moisture. “Buildings will never be designed, built, maintained, or utilized perfectly; and weather and natural disasters cannot be predicted. The one thing we can have complete control over, the materials within the building, should be selected wisely.” See Mold Susceptibility of Rapidly Renewable Building Materials Used in Wall Construction, AM Cooper, Master's thesis, Texas A&M University (2007) (Samples of wool, cork, straw, and cotton-- rapidly renewable materials used as exterior wall insulation products--were exposed to different moisture amounts in an encapsulated environment, representing the environment within a wall cavity when exposed to water from pipes, leaks, condensation and absorption, or from initial construction. The samples were monitored over time for mold growth).
Mold-related issues are just one example of the potential for unintended consequences from the use of alternative materials. Carefully reviewing building material choices in advance may help eliminate non-conforming building materials, returns and possibly disputes. NAHB has developed a guide,
Assessing Building Materials, for builders who may not have their own review process for gathering information from manufacturers and distributors when considering the selection of new building materials.
The guide is intended to arm members with the most important factor when evaluating new materials or products: information. Use the guide to step through the information collection process to make an informed decision on deploying new products or materials. The guide is not intended to be exhaustive or all-inclusive, but it will help builders ask the right questions and seek the most relevant information.
Copyright © 2022 by the National Association of Home Builders of the United States. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
David S. Jaffe, NAHBMr. Jaffe may be contacted at
DJaffe@nahb.org