California Clarifies Its Inverse Condemnation Standard
December 30, 2019 —
Gus Sara - The Subrogation StrategistIn City of Oroville v. Superior Court, 446 P.3d 304 (Cal. 2019), the Supreme Court of California considered whether the City of Oroville (City) was liable to a dental practice for inverse condemnation damages associated with a sewer backup. The court held that in order to establish inverse condemnation against a public entity, a property owner must show that an inherent risk in the public improvement was a substantial cause of the damage. Since the dental practice did not have a code-required backwater valve — which would have prevented or minimized this loss — the court found that the city was not liable because the sewage system was not a substantial cause of the loss. This case establishes that a claim for inverse condemnation requires a showing of a substantial causal connection between the public improvement and the property damage. It also suggests that comparative negligence can be a defense to inverse condemnation claims.
In December 2009, a dental practice, WGS Dental Complex (WGS), located in the City, incurred significant water damage as a result of untreated sewage from the City’s sewer main backing up into WGS’ building. WGS submitted a claim to its insurance carrier, The Dentists Insurance Company (TDIC) and, in addition, sued the City for its uninsured losses, alleging inverse condemnation and nuisance. TDIC joined the litigation, alleging negligence, nuisance, trespass and inverse condemnation. Under California law, when a government entity fails to recognize that an action or circumstance essentially amounts to a taking for public use, a property owner can pursue an inverse condemnation action for compensation. The City filed a cross-complaint against WGS for failing to install a code-required backwater valve on their lateral sewer line, which would have prevented or minimized the backup.
The City filed a motion for summary judgment, which the trial court denied. WGS then sought a judicial determination on the issue of inverse condemnation. The City presented evidence that the sewage system was designed in accordance with industry standards, and that WGS failed to comply with the City’s plumbing code by failing to install a backwater valve on its private sewer lateral. The trial court found the City liable for inverse condemnation because the blockage that caused the backup originated in the City’s sewer line. The court held that the blockage was an inherent risk of sewer operation. The Court of Appeals affirmed the decision, holding that the City would have had to prove that the WGS’s lack of a backwater valve was the sole cause of the loss in order to absolve itself of liability.
Read the court decisionRead the full story...Reprinted courtesy of
Gus Sara, White and WilliamsMr. Sara may be contacted at
sarag@whiteandwilliams.com
Contractor Pleads Guilty to Disadvantaged-Business Fraud
November 17, 2016 —
Tom Ichniowski – Engineering News-RecordIn the latest development in a federal small disadvantaged-business case, a construction company executive has pleaded guilty to a charge of conspiring to commit wire fraud.
Read the court decisionRead the full story...Reprinted courtesy of
Tom Ichniowski, Engineering News-RecordMr. Ichniowski may be contacted at
ichniowskit@enr.com
Court Makes an Unsettling Inference to Find that the Statute of Limitations Bars Claims Arising from a 1997 Northridge Earthquake Settlement
April 15, 2015 —
David W. Evans and Stephen J. Squillario – Haight Brown & Bonesteel LLPIn Britton v. Girardi (No. B249232 – Filed 4/1/2015), the Second Appellate District upheld the trial court’s dismissal due to the statute of limitations based on an inference it drew from a letter attached to the complaint, while reaffirming its prior application of the limitations period in Probate Code section 16460 for fraud claims in the related case of Prakashpalan v. Engstrom, Lipscomb & Lack (2/27/2014) 223 Cal.App.4th 1105.
In Britton, just as in Prakashpalan, the plaintiffs sued the attorneys who had represented them in connection with claims against their insurer arising out of the Northridge earthquake. In 1997, the attorneys had settled that litigation for more than $100 million. The plaintiffs allege that the attorneys breached their fiduciary duty by (1) failing to provide an accounting for the settlement, (2) failing to obtain their informed consent to the settlement, and (3) concealing their misappropriation of the settlement funds. They claim that they did not discover this wrongdoing until nearly fifteen years later, in 2012, when the Prakashpalans contacted them about their settlement. Significantly, the plaintiffs attached as an exhibit to the complaint a page of the November 3, 1997 letter to the Prakashpalans (rather than the plaintiffs), which stated that a retired judge who presided over the settlement had determined the allocations and the attorneys could not distribute the proceeds until the plaintiffs signed the “Master Settlement Agreement” by which the plaintiffs agreed to its terms and to give up all claims against the insurer.
Reprinted courtesy of
David W. Evans, Haight Brown & Bonesteel LLP and
Stephen J. Squillario, Haight Brown & Bonesteel LLP
Mr. Evans may be contacted at devans@hbblaw.com
Mr. Squillario may be contacted at ssquillario@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Construction Defect Claim Survives Insurer's Summary Judgment Motion Due to Lack of Evidence
December 23, 2024 —
Tred R. Eyerly - Insurance Law HawaiiThe court denied the insurer's motion for summary judgment on a construction defect claim due to lack of evidence. Statesboro Erectors, Inc. v. Owners Ins. Co., 2024 U.S. Dist. LEXIS 176555 (N.D. Ga. Sept. 30, 2024).
Griffco was the general contractor for a construction project. King Steel was hired as the "steel fabricator." King Steel subcontracted with Statesboro Erectors to complete certain construction work at the site. Statesboro agreed to the complete, proper and safe erection of the structural steel.
A steel collapse occurred at the construction site. According to King Steel, the collapse "appeared to have occurred due to lack of temporary cables or bracing for steel columns." Because of the collapse, King Steel was required to supply additional materials to replace the structural damage caused by the collapse.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Should I Pull the Pin? Contractor and Subcontractor Termination for Cause
January 26, 2017 —
Patrick McNamara - Porter Law GroupAny owner or general contractor who has a few projects under his or her belt has likely had this thought: “My contractor (or subcontractor) is not performing the way I expected; should I replace him?” The other side of the termination coin is: “This project is not going the way I expected; should I get out?”
While there may be an emotional high that immediately comes from terminating a contractor or subcontractor (or leaving a project, in mid-stream), there are many factors to be weighed, before making that decision.
Project Delay. Replacing a contractor or subcontractor that has already begun performance always results in delays to the project. Assessing the work in place, interviewing replacement contractors, and negotiating the terms of the new relationship can easily consume weeks, if not months of project time.
Read the court decisionRead the full story...Reprinted courtesy of
Patrick McNamara, Porter Law GroupMr. McNamara may be contacted at
pmcnamara@porterlaw.com
A Court-Side Seat: Flint Failures, Missed Deadlines, Toad Work and a Game of Chicken
October 05, 2020 —
Anthony B. Cavender - Gravel2GavelThe last few weeks have yielded a number of interesting developments in the Federal courts.
FEDERAL COURTS OF APPEAL
In re Flint Water Cases
Several local and State of Michigan officials, including the former governor, requested dismissal from the civil litigation seeking damages for the massive failure of Flint, Michigan’s public drinking water system. On August 5, 2020, the U.S. Court of Appeals for the Sixth Circuit agreed that the plaintiffs, residents of Flint, have successfully pled a case that the conduct of the defendants so “shocked the conscience” that a claim for a violation of their substantive due process rights was appropriately alleged. The defendants, including the former governor, argued that they were entitled to a qualified immunity defense. The court rejected this argument on the basis of the earlier decisions made by the court in this matter. Judge Sutton concurred because he was bound by this precedent, but remarked that the evidence for the governor’s culpability was very thin; he was not intimately connected to the extraordinary error in judgment. The majority was very upset with this concurrence as indicted by their own opinion.
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com
Is the Event You Are Claiming as Unforeseeable Delay Really Unforeseeable?
September 26, 2022 —
David Adelstein - Florida Construction Legal UpdatesIs the item or event you are claiming as an unforeseeable, excusable delay really unforeseeable? This is not a trick question.
Just because your construction contract identifies items or events that constitute unforeseeable, excusable delay does not mean those items can be used as a blanket excuse or crutch for the contractor. That would be unfair.
For instance, it is not uncommon for a construction contract to list as unforeseeable, excusable delay the following events or items: “(i) acts of God or of the public enemy, (ii) act of the Government in either its sovereign or contractual capacity, (iii) acts of another Contractor in the performance of a contract with the Government, (iv) fires, (v) floods, (vi) epidemics, (vii) quarantine restrictions, (viii) strikes, (ix) freight embargoes, (x) unusually severe weather, or (xi) delays of subcontractors or suppliers at any tier arising from unforeseeable causes beyond the control and without the fault or negligence of both the Contractor and the subcontractors or suppliers.” See, e.g., F.A.R. 52.249-10(b)(1). While the itemization of excusable delay may be worded differently, the point is there may be a listing as to what items or events constitute excusable delay. An excusable delay would justify additional time and, potentially, compensation to the contractor.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Up in Smoke - 5th Circuit Finds No Coverage for Hydrochloric Acid Spill Based on Pollution Exclusion
October 19, 2020 —
Kerianne E. Kane & David G. Jordan - Saxe Doernberger & VitaThe Fifth Circuit Court of Appeals recently held that an insurer was not obligated to pay damages associated with a hydrochloric acid spill based on a pollution exclusion in the policy.
In Burroughs Diesel, Inc. v. Travelers Indemnity Co. of America,1 a trucking company sued its property insurer, Travelers Indemnity Company of America (“Travelers”) when it refused to pay a claim for a storage tank leak which resulted in over 5,000 gallons of hydrochloric acid entering the property and causing significant damage to buildings, vehicles, tools, and equipment. The acid was initially dispensed in liquid form, but quickly became a cloud that engulfed the property. Travelers denied coverage for the claim based on the pollution exclusion because “acids” fell within the policy’s definition of “pollutants.”
The trucking company sued Travelers in the United States District Court for the Southern District of Mississippi, alleging breach of contract and breach of good faith and fair dealing for refusing to pay the claim. The trucking company argued that coverage was warranted because there is an exception to the pollution exclusion if “the discharge, dispersal, seepage, migration, release or escape is itself caused by any of the ‘specified causes of loss,’” and the hydrochloric acid cloud was a form of “smoke,” which is a specified cause of loss covered by the policy. The District Court entered summary judgment in favor of Travelers, finding that the trucking company failed to demonstrate that an exception to the pollution exclusion applied. The trucking company appealed to the Fifth Circuit Court of Appeals.
Reprinted courtesy of
Kerianne E. Kane, Saxe Doernberger & Vita and
David G. Jordan, Saxe Doernberger & Vita
Ms. Kane may be contacted at kek@sdvlaw.com
Mr. Jordan may be contacted at dgj@sdvlaw.com