Google, Environmentalists and University Push Methane-Leak Detection
December 21, 2016 —
Mary B. Powers – Engineering News-RecordNational Grid, which serves New York, Massachusetts and Rhode Island, is set to be the second U.S. natural-gas utility to use technology advanced by Google Earth, the Environmental Defense Fund (EDF) and Colorado State University to boost large-scale methane-leak detection. It is launching a $3-billion effort to replace gas pipelines in New York. The technology uses cutting-edge spatial analytics methods and methane sensors, specially fitted to Google Street View cars, to identify leaks and accurately measure the amount of methane escaping.
Read the court decisionRead the full story...Reprinted courtesy of
Mary B. Powers, Engineering News-RecordENR may be contacted at
ENR.com@bnpmedia.com
OSHA Issues Fines for Fatal Building Collapse in Philadelphia
November 27, 2013 —
CDJ STAFFThe Occupational Safety and Health Administration has issued $400,000 in fines to two contactors who were involved with the collapse of a building in Philadelphia. Six people died and 14 more were injured in an adjacent building. OSHA concluded that the two firms, Campbell Construction and S&R Contracting, violated workplace safety regulations 12 times in their demolition of the building.
According to OSHA, Campbell Construction removed structural supports and portions of the lower floors of the building while upper stories were still being demolished. Both firms failed to provide its workers with fall protection equipment.
Read the court decisionRead the full story...Reprinted courtesy of
Georgia Update: Automatic Renewals in Consumer Service Contracts
August 31, 2020 —
David R. Cook - AHC BlogGeorgia HB 1039 amends O.C.G.A. § 13-12-3 to provide additional protections for consumers who enter into service contracts containing lengthy automatic renewal provisions.
Pre-Existing Requirement: For service contracts with an initial term of twelve months or longer and an automatic renewal provision for more than one month, unless the consumer terminates the agreement, sellers must provide written or electronic notification of the automatic renewal provision to the consumer. The notification must be provided to the consumer between 30 and 60 days before the cancellation deadline under such renewal provision. The notice must also “clearly and conspicuously” disclose that unless the consumer cancels, the agreement will automatically renew and disclose how the consumer may obtain details about the automatic renewal provision and cancellation procedure. The process by which a consumer may obtain such information must include the seller’s contact information (e.g., specific phone number or address), reference to the contract, or any other method provided.
Read the court decisionRead the full story...Reprinted courtesy of
David R. Cook, Autry, Hall & Cook, LLPMr. Cook may be contacted at
cook@ahclaw.com
August Home Prices in 20 U.S. Cities Appreciate at Faster Pace
October 28, 2015 —
Victoria Stilwell – BloombergHome prices in 20 U.S. cities rose at a faster pace in the year ended August, a sign the industry continues to strengthen on improving demand.
The S&P/Case-Shiller index of property values climbed 5.1 percent from August 2014 after rising 4.9 percent in the year ended in July, the group said Tuesday in New York. The gain was the biggest in a year and matched the median forecast of economists surveyed by Bloomberg. Nationally, prices increased 4.7 percent after a 4.6 percent advance in the 12 months through July.
A tight supply has supported price appreciation, which may in turn entice more owners to put their properties on the market as the payoff grows. More homes that are affordable for first-time or young buyers will be needed to keep the housing recovery on track, providing a boost to consumer spending in the process.
Read the court decisionRead the full story...Reprinted courtesy of
Victoria Stilwell, Bloomberg
Real Estate & Construction News Round-Up (02/08/23) – The Build America, Buy America Act, ESG Feasibility, and University Partnerships
February 27, 2023 —
Pillsbury's Construction & Real Estate Law Team - Gravel2Gavel Construction & Real Estate Law BlogThis week’s round-up explores President Joe Biden’s recent State of the Union address and plans for the Build America, Buy America Act, the feasibility of real estate companies achieving their ESG goals, and how developers, lenders, and tenants are partnering with universities to solve real estate challenges.
- During his annual State of the Union address, President Joe Biden detailed his Build America, Buy America plans and standard to require all construction materials on federal infrastructure projects to be made in the United States. (Jennifer Goodman & Zachary Phillips, Construction Dive)
- Speculation surrounding the economic environment and real estate stability is testing the feasibility and resilience of the environmental, social and corporate governance (ESG) framework used by corporations to measure their societal impact. (Anna Staropoli, Commercial Observer)
- Adopting Web3 and decentralization in the real estate industry is projected to bring about significant changes and improvements. (David Bitton, Forbes)
Read the court decisionRead the full story...Reprinted courtesy of
Pillsbury's Construction & Real Estate Law Team
“Wait! Do You Have All Your Ducks in a Row?” Filing of a Certificate of Merit in Conjunction With a Complaint
January 13, 2020 —
Rahul Gogineni - The Subrogation StrategistIn Barrett v. Berry Contr. L.P., No. 13-18-00498-CV, 2019 Tex. LEXIS 8811, the Thirteenth District Court of Appeals of Texas considered, among other things, the procedural timing requirements of filing a certificate of merit in conjunction with a complaint. The court concluded that the proper reading of the statute requires a plaintiff to file a certificate of merit with the first complaint naming the defendant as a party.
In Barrett, after sustaining injuries while working at a refinery, David Barrett (Barrett) filed suit against Berry Contracting, LP and Elite Piping & Civil, Ltd. on July 6, 2016. In Barrett’s first amended complaint, which he filed on August 23, 2016, Barrett added Govind Development, LLC (Govind) as another defendant. Barrett subsequently filed a second amended complaint (omitting Govind) and, on December 27, 2017, shortly before the statute of limitations ran, a third amended complaint (reasserting claims against Govind). On January 28, 2018, after the statute of limitations period ran, Barrett filed a certificate of merit. Govind filed a motion to dismiss the claim, asserting that Barrett violated the statute that required a certificate of merit to be filed with the complaint, Tex. Civ. Prac & Rem. Code §150.002.
Tex. Civ. Prac. & Rem. Code §150.002(a) states,
In any action or arbitration proceeding for damages arising out of the provision of professional services by a licensed or registered professional, a claimant shall be required to file with the complaint an affidavit of a third-party licensed architect, licensed professional engineer, registered landscape architect or registered professional land surveyor…
Read the court decisionRead the full story...Reprinted courtesy of
Rahul Gogineni, White and Williams LLPMr. Gogineni may be contacted at
goginenir@whiteandwilliams.com
Fourth Circuit Questions EPA 2020 Clean Water Act 401 Certification Rule Tolling Prohibition
August 10, 2021 —
Karen C. Bennett - Lewis BrisboisLast week, in North Carolina Department of Environmental Quality v. Federal Energy Regulatory Commission, the Fourth Circuit Court of Appeals suggested that Congress did not intend for the states, or tribes, to take final action on Clean Water Act (CWA) Section 401 applications within a year of filing. The opinion conflicts with the Environmental Protection Agency's (EPA) 2020 final rule that sought to limit state and tribal certifying authorities’ ability to delay federal projects through various tolling schemes. 85 Fed. Reg. 42210 (Jul. 13, 2020).
EPA’s rule, codified in existing regulations, states that the CWA imposes a strict one-year deadline for certification decisions, otherwise certification is waived. However, the Fourth Circuit’s view suggests that this waiver is not triggered in cases where the certifying authority has acted on the application, even if it takes longer than a year to make a final certification decision. The court ultimately decided the case on other grounds, leaving a resolution on the statutory interpretation question for another day.
Read the court decisionRead the full story...Reprinted courtesy of
Karen C. Bennett, Lewis BrisboisMs. Bennett may be contacted at
Karen.Bennett@lewisbrisbois.com
Consumer Protections for California Residential Solar Energy Systems
September 25, 2018 —
Robert A. James & Alexandra Brandt - Gravel2Gavel Construction & Real Estate BlogIt was already the case that in order to offer to install California residential solar energy systems, a contractor must be licensed by the California Contractors State License Board (CSLB) and must hold an appropriate specialty classification. Under AB 1070 enacted late last year (Chapter 662, Statutes of 2017), special consumer protections are being deployed for the benefit of homeowners. Those protections are steadily rolling out.
Step one is the requirement of new Business & Professions Code (B&P Code) Section 7169 that, as of January 1, 2019, a disclosure document must be provided to consumers prior to sale and included on page 1 of the sale contract. The initial version of this document, which was developed by the CSLB and endorsed on August 23, 2018 by the California Public Utilities Commission (CPUC), is available here. The disclosure requirement doesn’t apply to systems included in new home construction.
Reprinted courtesy of
Robert A. James, Pillsbury and
Alexandra Brandt, Pillsbury
Mr. James may be contacted at rob.james@pillsburylaw.com
Ms. Brandt may be contacted at alexandra.brandt@pillsburylaw.com
Read the court decisionRead the full story...Reprinted courtesy of