Traub Lieberman Partner Gregory S. Pennington and Associate Emily A. Velcamp Obtain Summary Judgment in Favor of Residential Property Owners
December 13, 2022 —
Gregory S. Pennington & Emily A. Velcamp - Traub LiebermanTraub Lieberman Partner Gregory S. Pennington and Associate Emily A. Velcamp obtained summary judgment in favor of their clients, owners of a residential property [the “Owners” or “Defendants”] used as a short-term rental in Beach Haven, New Jersey. Plaintiff alleged injuries resulting from a fall into an open water meter pit, located in the public sidewalk abutting the Owners’ property during the time within which the property was rented to plaintiff and his family. According to plaintiff, defendants breached their duty owed to him, relying on a Borough of Beach Haven Ordinance, thereby allowing the water meter pit to be raised in an unsafe manner, which resulted in plaintiff’s fall and subsequent injuries.
After the Court denied defendants’ initial Motion for Summary Judgment on the grounds that issues of material fact existed regarding defendants’ duty and the alleged breach of that duty, a Motion for Reconsideration was filed. Mr. Pennington and Ms. Velcamp argued that their clients, as residential landowners, owed no duty of care to plaintiff for the raised condition of the water meter pit lid, located in the abutting sidewalk, as they did not cause or contribute to the alleged condition. Defendants further argued that even if a duty of care existed, no breach occurred given the lack of notice to defendants, either actual or constructive. Plaintiff attempted to argue that defendants had constructive notice of the lid’s raised condition, relying on his expert report and the fact that defendants had 3.5 months from the date the property was purchased, to the date of the subject accident to discover the lid’s raised condition. Mr. Pennington and Ms. Velcamp successfully argued that despite plaintiff’s allegations and the findings contained in plaintiff’s expert report, authored 2 months after the alleged accident, there was still no credible, material evidence to say how long the water meter pit lid was in that raised condition to allow defendants a reasonable time to discover it, remedy it, or report it to the Borough.
Reprinted courtesy of
Gregory S. Pennington, Traub Lieberman and
Emily A. Velcamp, Traub Lieberman
Mr. Pennington may be contacted at gpennington@tlsslaw.com
Ms. Velcamp may be contacted at evelcamp@tlsslaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Panama Weighs Another Canal Expansion at Centennial Mark
August 20, 2014 —
Michael McDonald – BloombergA century after the U.S. steamship Ancon first sailed through the Panama Canal, a $5.3 billion expansion delayed by bickering contractors and angry workers is nearing completion. The problem is it might not be big enough.
With the expansion 16 months behind schedule, canal administrator Jorge Quijano said officials are studying whether to dig a fourth set of locks to handle a growing fleet of super-sized ships. Those include the 400-meter-long “Triple E” vessels capable of carrying more than 18,000 containers, four times more than current ships passing through the canal.
“We are always analyzing the market and as soon as we can economically justify it we will begin,” said Manuel Benitez, deputy administrator of the Panama Canal Authority, adding that he thinks the current expansion is sufficient for now. “If that changes and the demand exists we are ready to begin.”
Read the court decisionRead the full story...Reprinted courtesy of
Michael McDonald, BloombergMr. McDonald may be contacted at
mmcdonald87@bloomberg.net
Virginia Joins California and Nevada in Passing its Consumer Privacy Act
March 15, 2021 —
Kyle Janecek – Newmeyer DillionCalifornia tends to be on the forefront in consumer privacy laws within the United States. However, there is a growing momentum for other states to join California in legislating consumer privacy rights, as well as pushes for federal legislation. The latest state to join in and pass consumer privacy legislation is Virginia, with its Virginia Consumer Data Protection Act (VCDPA). With Virginia joining the fray, several questions arise, such as how closely does the VCDPA follow California's legislation? How, if at all, does it differ from already-existing legislation? What do businesses need to comply with the VCDPA, if at all?
WHAT IS THE VIRGINIA CONSUMER DATA PROTECTION ACT?
The VCDPA largely mimics elements from its Californian cousins, the California Consumer Privacy Act (CCPA) as modified by the California Privacy Rights Act (CPRA). The main features of the law include: (a) issuing the right to request what information is collected; (b) the right to correct information provided; (c) the right to deletion; (d) providing notice to consumers regarding the collection of their data; and (e) protecting consumer data. Further, the consumer requests, akin to the CCPA, do require verification, and similarly phrased data security practices that rely on how "reasonable" they are, depending on the volume and type of information at issue. Though, the VCDPA does expand on this slightly, requiring "data protection assessments" to determine the security of protected information, how it is shared and used, the benefits in sharing the information and harm resulting from any breaches.
Read the court decisionRead the full story...Reprinted courtesy of
Kyle Janecek, Newmeyer DillionMr. Janecek may be contacted at
kyle.janecek@ndlf.com
Eleventh Circuit Finds No “Property Damage” Where Defective Component Failed to Cause Damage to Other Non-Defective Components
October 11, 2021 —
Anthony L. Miscioscia & Margo Meta - White and WilliamsIn Florida, damage caused by faulty workmanship constitutes “property damage;” however, the cost of repairing or removing defective work does not. Amerisure Mutual Insurance Company v. Auchter Company, 673 F.3d 1294 (11th Cir. 2012) (Auchter). But what happens when the cost of repairing or removing defective work results in loss of use of the tangible property which is not physically injured?
The United States Court of Appeals for the Eleventh Circuit was recently faced with this question in Tricon Development of Brevard, Inc. v. Nautilus Insurance Company, No. 21-11199, 2021 U.S. App. LEXIS 27317 (11th Cir. Sep. 10, 2021). Tricon arose out of the construction of a condominium. Tricon was hired to serve as general contractor for the project and hired a subcontractor to fabricate and install metal railings. The railings installed by the subcontractor were defective and damaged, improperly installed, and failed to meet the project’s specifications. Tricon filed an insurance claim with Nautilus Insurance Company, the subcontractor’s commercial general liability insurer, for the cost to remove and replace the railings.[1]
Reprinted courtesy of
Anthony L. Miscioscia, White and Williams and
Margo Meta, White and Williams
Mr. Miscioscia may be contacted at misciosciaa@whiteandwilliams.com
Ms. Meta may be contacted at metam@whiteandwilliams.com
Read the court decisionRead the full story...Reprinted courtesy of
Application of Set-Off When Determining Prevailing Party for Purposes of Attorney’s Fees
February 22, 2021 —
David Adelstein - Florida Construction Legal UpdatesThe recent opinion from the Second District Court of Appeal in Hayward Baker, Inc. v. Westfield Ins. Co., 2020 WL 7767859 (2nd DCA 2020) demonstrates that the significant issues test for determining the prevailing party for purposes of attorney’s fees applies to disputes involving payment bonds under Florida’s Lien Law (Florida Statutes Chapter 713). The
significant issues test is more or less a subjective test where the party that is deemed to have prevailed on the significant issues in the case is the prevailing party for purposes of attorney’s fees in the case. A trial court has discretion to determine the prevailing party which will not be disturbed absent an appellate court finding the trial court abused that discretion. This significant issues test is an important consideration so that parties understand just because money ends up going their way does not necessarily mean they prevailed on the significant issues in the case. It could mean that. But it may not based on the claims and moneys involved in the dispute.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
OSHA Issues Fines for Fatal Building Collapse in Philadelphia
November 27, 2013 —
CDJ STAFFThe Occupational Safety and Health Administration has issued $400,000 in fines to two contactors who were involved with the collapse of a building in Philadelphia. Six people died and 14 more were injured in an adjacent building. OSHA concluded that the two firms, Campbell Construction and S&R Contracting, violated workplace safety regulations 12 times in their demolition of the building.
According to OSHA, Campbell Construction removed structural supports and portions of the lower floors of the building while upper stories were still being demolished. Both firms failed to provide its workers with fall protection equipment.
Read the court decisionRead the full story...Reprinted courtesy of
Agile Project Management in the Construction Industry
January 09, 2023 —
Mohammad Saki - AEC BusinessThe linear workflows used in the construction industry, such as the RIBA plan of work, have a history of starting when the previous phases end. The stages in these workflows are often distinct and sequential, and it might be difficult or expensive to go back after a stage is finished. Design reviews are required in this method, which is also known as the “Waterfall,” and they must be completed before moving on to the next level.
Cross-phase iterations are a rare symptom of problems, and the majority of design specifications will be locked early to prevent rework. Additionally, common planning and scheduling methods for the construction industry, like the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT), lack the ability to represent feedback and iteration in projects because they only permit one-way progression.
As a result, these processes have come under fire for being a linear paradigm that encourages a fragmented approach to project management, and the need for a more iterative procedure has increased.
Read the court decisionRead the full story...Reprinted courtesy of
Mohammad Saki, AEC Business
Independent Contractor v. Employee. The “ABC Test” Does Not Include a Threshold Hiring Entity Test
October 03, 2022 —
Garret Murai - California Construction Law BlogIn 2018, in Dynamex Operations West, Inc. v. Superior Court, 4 Cal.5th 903 (2018), the California Supreme Court overturned nearly thirty years of jurisprudence governing the manner in which workers are classified as employees or independent contractors. The Dynamex decision replaced the “Borello test,” derived from a case of the same name, S.G. Borello & Sons, Inc. v. Department of Industrial Relations, 48 Cal.3d 341 (1989), in which the California Supreme Court at the time set forth a variety of factors to be considered when determining whether a worker was an employee or independent contractor.
The Dynamex decision replaced with the “Borello test” with the “ABC test.” Under the ABC test, a worker can be deemed an independent contractor if three conditions are met:
- The worker is free from the control and direction of the hiring entity in connection with the performance of the work, both under the contract for the performance of the work and in fact;
- The worker performs work that is outside the usual course of the hiring entity’s business; and
- The worker is customarily engaged in an independent established trade, occupation, or business
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com