Neighbor Allowed to Remove Tree Roots on Her Property That Supported Adjoining Landowners’ Two Large Trees With Legal Immunity
July 14, 2016 —
Paul R. Cressman, Jr. – Ahlers & Cressman PLLC BlogA recent Washington Court of Appeals opinion addressed the rights of a neighbor to destroy roots and branches on her property that belonged to trees located on an adjoining landowner’s property.[1]
Mustoe had two large Douglas-fir trees located entirely on her property, about two and one-half feet from the property line with her neighbor Ma. Ma caused a ditch to be dug on her property along the border with Mustoe’s lot. The ditch was 18-20 inches deep. In the process, Ma exposed and removed the trees’ roots, leaving them to extend only three-four feet from the trunks of the trees. This resulted in a loss of nearly half of the trees’ roots, all from the south side, exposing them to southerly winds with no support. The damaged trees posed a high risk of falling on Mustoe’s home. The landscape value of the trees was estimated to be $16,418. The cost of their removal was estimated to be $3,913.
Mustoe filed suit against Ma asserting that Ma had negligently, recklessly, and intentionally excavated and damaged her trees, along with other property, and also sought emotional distress damages. The trial court dismissed Mustoe’s suit. The Court of Appeals affirmed.
Read the court decisionRead the full story...Reprinted courtesy of
Paul R. Cressman, Jr., Ahlers & Cressman PLLC Mr. Cressman may be contacted at
pcressman@ac-lawyers.com
What Contractors Can Do to Address Rising Material Costs
August 23, 2021 —
Garret Murai - California Construction Law BlogFrom lumber to used cars to pastrami sandwiches, prices are rising. This past month, at a town hall meeting in Cincinnati, Ohio, President Biden acknowledged that inflation was increasing, responding to a question from a restaurant owner about labor shortages, “I think your business and the tourist business is really going to be in a bind for a little while.”
Although construction companies typically don’t work in the same small margins that restaurants do, labor shortages and material price increases have nevertheless impacted the construction industry. According to a recent report by Cumming, the cost of construction materials from lumber to steel to gypsum have gone up over the last 12 months, in some cases nearly double:
For contractors entering into construction contracts and those performing work under existing contracts, the increasing cost of materials and shortage of labor creates challenges, some of which can be addressed through contractual provisions and the framework of those contracts.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
Build Back Better Includes Historic Expansion of the Low-Income Housing Tax Credit Program
December 20, 2021 —
James M. Grosser & David W. Wright - Gravel2Gavel Construction & Real Estate Law BlogOn November 19, 2021, the U.S. House of Representatives passed the Build Back Better Act (H.R. 5376), a bill that represents a large portion of the Biden-Harris Administration’s agenda. Among other spending and tax measures, the bill includes an unprecedented expansion of the Low-Income Housing Tax Credit (LIHTC) program. Four proposals are headlining this expansion:
- Increasing the 9% LIHTC allocation cap by 10% plus inflation annually from 2022 to 2024. With this increase, the 2024 LIHTC allocation cap will rise to $3.97 per capita and a small state minimum of around $4.58 million, constituting a 41 percent increase in allocable LIHTC over current levels. The allocation cap would then decrease to $2.65 per capita and a small state minimum of $3.12 million in 2025 and would thereafter be indexed to inflation from the 2025 baseline.
- Reducing the 50% threshold for 4% tax-exempt bond-financed projects to 25% for five years, beginning in 2022.
Reprinted courtesy of
James M. Grosser, Pillsbury and
David W. Wright, Pillsbury
Mr. Grosser may be contacted at james.grosser@pillsburylaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Replevin Actions: What You Should Know
November 08, 2021 —
Craig H. O'Neill - White and Williams LLPA contractor client of White and Williams recently found itself in a prickly situation. They had default terminated a subcontractor on a major commercial project and withheld payment to that subcontractor on an outstanding invoice as permitted under the terms of the subcontract until the project was completed. Clearly irate over being terminated, the subcontractor walked-off of the project with thousands of dollars’ worth of project materials and equipment that had been paid for by the owner. While on some projects this may amount to nothing more than an annoyance or inconvenience, in this case it was a significant problem because some of the wrongfully removed materials were custom manufactured overseas and not easily replaceable. The client therefore needed to take immediate action to retrieve the stolen materials so that the project would not be delayed. Specifically, it needed to file a replevin action against the subcontractor.
A replevin action is a little known but powerful area of the law. In its simplest terms, replevin is a procedure whereby seized goods may be provisionally restored to their owner pending the outcome of an action to determine the rights of the parties concerned. The requirements of a replevin action differ by jurisdiction. For example, in Pennsylvania, the Rules of Civil Procedure devote an entire section to replevin actions and spell out in precise detail the steps that must be taken. While you should be sure to strictly comply with the rules in your jurisdiction, here are a few general points to keep in mind:
- Where to File: A replevin action is typically commenced by filing a complaint in the appropriate jurisdiction. Generally speaking, it is best to file the action in the jurisdiction where the improperly seized materials are being held. If that location is unknown, you can also typically file the action in the jurisdiction where the project is located.
Read the court decisionRead the full story...Reprinted courtesy of
Craig H. O'Neill, White and Williams LLPMr. O'Neill may be contacted at
oneillc@whiteandwilliams.com
A Few Construction Related Bills to Keep an Eye On in 2023 (UPDATED)
February 20, 2023 —
Christopher G. Hill - Construction Law MusingsThe annual General Assembly session is now well underway here in the Commonwealth of Virginia. As is always the case, those in our fine state legislature have introduced with varying success a few construction-related bills. This post will list just a few without comment, and a big one at the end that will likely spur a post or two down the road here at Construction Law Musings:
HB1490:
Virginia Public Procurement Act; certain construction contracts; performance and payment bonds. Allows localities to allow a contractor of indefinite-delivery or quantity contracts, defined in the bill, who is otherwise required to furnish performance and payment bonds in the sum of the contract amount to the public body with which he contracted to furnish such bonds only the dollar amount of the individual tasks identified in the underlying contract. Such contractors shall not be required to furnish the sum of the contract amount if the governing locality has adopted such an ordinance.
UPDATE: Passed the House and is being considered in the Senate
UPDATE 2: A
substitute bill has passed both the House and the Senate.
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Newmeyer & Dillion Announces Three New Partners
January 04, 2018 —
NEWMEYER & DILLION LLPOriginally Published by CDJ on March 16, 2017
NEWPORT BEACH, Calif. – FEBRUARY 7, 2017 – Prominent business and real estate law firm Newmeyer & Dillion LLP is pleased to announce that three of the firm’s attorneys – Ben Ammerman, Anne Kelley and Rondi Walsh – have been elected to partnership. Their promotions are effective immediately.
“The elevation of these three attorneys is a testament to their leadership, hard work, and unwavering commitment to superior service for our clients and the firm,” proclaimed Jeff Dennis, Newmeyer & Dillion’s Managing Partner. “This is an exciting time for the firm as we look forward to their continued success and contributions.”
Ammerman (based in Newport Beach, CA) focuses his practice in the areas of business, real estate, and tort litigation. In addition to his private practice, Ammerman presently serves as a Commander in the Navy Reserve Judge Advocate General’s Corps. He's also an active alumnus, currently named co-chair of the University of Southern California’s 20th Reunion Committee.
Kelley (based in Walnut Creek, CA) concentrates primarily in construction litigation and insurance coverage matters. She has over 12 years of experience working closely with builders, developers, contractors and subcontractors throughout Northern California developing legal strategies specific to the needs of each matter and the client’s business and goals. Kelley has litigated a wide variety of complex insurance coverage disputes.
Walsh (based in Newport Beach, CA) has incorporated into her practice the representation of policyholders in first and third-party insurance coverage, and business lawsuits involving contracts, property disputes, products liability and construction defect issues. She also has litigated numerous political and election law matters and has worked both professionally and as a volunteer on numerous political campaigns. Walsh is also an active member with the National Charity League.
About Newmeyer & Dillion
For more than 30 years, Newmeyer & Dillion has delivered creative and outstanding legal solutions and trial results for a wide array of clients. With over 70 attorneys practicing in all aspects of business, employment, real estate, construction and insurance law, Newmeyer & Dillion delivers legal services tailored to meet each client’s needs. Headquartered in Newport Beach, California, with offices in Walnut Creek, California and Las Vegas, Nevada, Newmeyer & Dillion attorneys are recognized by The Best Lawyers in America©, and Super Lawyers as top tier and some of the best lawyers in California, and have been given Martindale-Hubbell Peer Review's AV Preeminent® highest rating. For additional information, call 949-854-7000 or visit www.ndlf.com.
Read the court decisionRead the full story...Reprinted courtesy of
Sacramento Army Corps District Projects Get $2.1 Billion in Supplemental Appropriation
September 04, 2018 —
Greg Aragon - Engineering News-RecordThe U.S. Army Corps of Engineers Sacramento District has received supplemental funding for five District projects, totaling an investment of more than $2.1 billion in flood risk management efforts.
Read the court decisionRead the full story...Reprinted courtesy of
Greg Aragon, ENRENR may be contacted at
ENR.com@bnpmedia.com
Deductibles Limited to Number of Suits Filed Against Insured, Not Number of Actual Plaintiffs
December 08, 2016 —
Tred R. Eyerly – Insurance Law HawaiiThe court limited the number of deductibles to the counterclaims filed against the insured, not the more than 600 plaintiffs who were parties to the three underlying lawsuits. Probuilders Spec. Ins. Co. v. Yarbrough Plastering, 2016 U.S. Dist. LEXIS 134959 (E.D. Calif. Sept. 29, 2016).
Yarbrough entered into contracts with Lenox Homes to provide stucco and drywall services in the homes Lenox would build. Each contract required Yarbrough to indemnify Lenox for any claims resulting from property damage arising out of the performance of the contract.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com