No Coverage Under Anti-Concurrent Causation Clause
October 02, 2015 —
Tred R. Eyerly – Insurance Law HawaiiThe policy's anti-concurrent causation clause blocked coverage for damage to the home caused by wind and flood. Clarke v. Travco Ins. Co., 2015 U.S. Dist. LEXIS 104267 (S.D.N.Y. Aug. 7, 2015).
The insured's home was located about twenty feet from the Hudson River. Hurricane Sandy caused the river to rise, creating damage to the insured's home. The insured did not have flood insurance. During the storm, water flooded the lower level of the house to a level of about four feet. Further, a wooden dock from another property, approximately fifteen feet by ten feet, entered the property and came to rest within the lower level.
The insured submitted a claim under his homeowner's policy to Travco Insurance Company. An investigator concluded that the cause of damage to the home was flood/water. The claim was denied.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Subcontractor Not Liable for Defending Contractor in Construction Defect Case
February 10, 2012 —
CDJ STAFFThe California Court of Appeals has ruled on January 9, 2012 in Hensel Phelps Construction Company v. Urata & Sons Cement, upholding the judgment of the lower court.
Hensel Phelps was the general contractor for a high-rise in Sacramento. They were sued by the owners of the building after problems were discovered in the concrete slabs of the building’s parking garage. Instead of welded steel wire mesh, the slabs had been constructed with fiber mesh. Hensel Phelps filed a cross-complaint against Urata Cement, the subcontractor that had performed the cement work. Urata refused to defend Hensel Phelps. The owners’ case was subsequently dismissed due to the statute of limitations.
Although the original case was over, Hensel Phelps continued in their claims against Urata. “Urata argued that a handwritten interlineation required Hensel Phelps to prove Urata was at fault for the injury alleged in the building owners’ complaint before Urata was obliged to defend Hensel Phelps in that action.”
The lower court concluded that Urata would have been obligated to defend Hensel Phelps if the owners’ lawsuit had alleged that the damage was due to the subcontractor’s work or if evidence at trial established this. The lower court found neither of these true. Instead, the use of the fiber mesh was a design issue and “that decision was outside the scope of the subcontractor’s work.”
During the trial, Hensel Phelps conceded that Urata was not at fault. The appeals court could find no reading of the contract that would cause Urata to be obligated to defend Hensel Phelps, calling Hensel Phelps’s reading of the contact as “grammatically infeasible.”
Judges Nicholson, Raye, and Butz upheld the decision of the lower court and awarded costs on appeal to Urata.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Colorado House Bill 20-1290 – Restriction on the Use of Failure to Cooperate Defense in First-Party Claims
May 18, 2020 —
David M. McLain – Colorado Construction LitigationOn February 7th, Representative Garnett, with Senator Fenberg as the Senate sponsor, introduced HB 20-1290, concerning the ability of an insurer to use a failure-to-cooperate defense in an action in which the insured has made a claim for insurance coverage.
If the bill were to pass, in order to plead or prove a failure-to-cooperate defense in any action concerning first-party insurance benefits, the following conditions must be met:
- The carrier has submitted a written request for information the carrier seeks to the insured or the insured’s representative, by certified mail;
- The written request provides the insured 60 days to respond;
- The information sought would be discoverable in litigation;
Read the court decisionRead the full story...Reprinted courtesy of
David McLain, Higgins, Hopkins, McLain & RoswellMr. McLain may be contacted at
mclain@hhmrlaw.com
Constructive Notice Established as Obstacle to Relation Back Doctrine
March 01, 2021 —
Nicholas B. Brummel & Lawrence S. Zucker II - Haight Brown & Bonesteel LLPIn Organizacion Comunidad de Alviso v. City of San Jose, the Sixth Appellate District held that the relation back doctrine was inapplicable where a plaintiff received constructive notice of a defendant’s identity months prior to the last date where filing was permitted pursuant to an applicable statute of limitations.
In Organizacion Comunidad de Alviso, Mark Espinoza, an Organizacion Comunidad de Alviso (OCA/Plaintiff) representative, asked the City of San Jose (“the city”) to place him on the public notice list for a proposed rezoning project. He also twice specifically requested a copy of the notice of determination (NOD) documenting the city’s certification of an environmental impact report (EIR) and approval of the project. Despite Espinoza diligently requesting all notices for the project, the city, in violation of the California Environmental Quality Act (CEQA), failed to send Espinoza the legally operative second NOD for the project; the first NOD was provided to OCA, but named an incorrect party in interest.
Reprinted courtesy of
Nicholas B. Brummel, Haight Brown & Bonesteel LLP and
Lawrence S. Zucker II, Haight Brown & Bonesteel LLP
Mr. Brummel may be contacted at nbrummel@hbblaw.com
Mr. Zucker may be contacted at lzucker@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
9th Circuit Plumbs Through the Federal and State False Claims Acts
January 16, 2024 —
Garret Murai - California Construction Law BlogYou may have heard of the False Claims Act and know that it penalizes companies and individuals in contract with the government who present false claims. The federal False Claims Act was signed into law by President Abraham Lincoln in 1863 to penalize profiteers during the Civil War who were selling the Union Army moth eaten blankets, boxes of sawdust instead of guns, and sometimes re-selling the Army calvary horses several times over. Since then, many states, including California, as well as municipalities, have enacted their own false claim statutes.
As currently written, the federal False Claims Act provides for statutory penalties against any person who:
- “[K]nowingly presents, or causes to be presented, a false or fraudulent claim for payment or approval”;
- “[K]nowingly makes, uses or causes to be made or used, a false record or statement material to a false or fraudulent claim”;
- “[H]as possession, custody, or control of property or money used, or to be used, by the Government an knowingly delivers, or causes to be delivered, less than all of that money or property”;
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
Department Of Labor Recovers $724K In Back Wages, Damages For 255 Workers After Phoenix Contractor Denied Overtime Pay, Falsified Records
February 01, 2023 —
U.S. Department of LaborPHOENIX – The U.S. Department of Labor has recovered $724,082 in back wages and damages for 255 employees of an electrical contractor in Phoenix who denied them overtime wages and falsified records.
An investigation by the department’s
Wage and Hour Division found IES Residential – a subsidiary of one of the nation’s largest electrical, HVAC and plumbing, solar and cable installation contractors – capped employees’ overtime at eight hours despite some employees working up to 60 hours in a workweek.
The division also learned the employer told workers – some who arrived as early as 4:45 a.m. and worked as late as 7 p.m. to record 40 hours or less on their timesheets unless their overtime was pre-approved. When IES Residential did approve, the employer limited overtime to eight hours per week even when employees worked as many as 23 hours of overtime in a workweek.
“The U.S. Department of Labor will hold employers accountable for wage theft, particularly in cases like this one, where IES Residential deliberately attempted to evade the law by instructing employees to falsify timesheets to avoid paying overtime wages,” said Wage and Hour Division District Director Eric Murray in Phoenix. “Employers who fail to pay workers their full wages may face costly consequences, including penalties for intentional acts to cover-up their violations.”
In fiscal year 2022, the division
recovered nearly $32.9 million in back wages for 17,127 construction industry workers. The division completed more than 2,200 investigations in FY22 in the construction industry and by wages recovered, the industry ranks second among the division’s low wage, high violation industries.
Read the court decisionRead the full story...Reprinted courtesy of
Court of Appeal Holds That Higher-Tiered Party on Construction Project Can be Held Liable for Intentional Interference with Contract
December 07, 2020 —
Garret Murai - California Construction Law BlogIn
Caliber Paving Company, Inc. v. Rexford Industrial Realty and Management, Inc., Case No. G0584406 (September 1, 2020), the 4th District Court of Appeal examined whether a higher-tiered party on a construction project can be held liable for intentional interference with contract when it interferes with the contract between lower-tiered parties even though the higher-tiered party has an economic interest in the contract between the lower-tiered parties.
The Caliber Paving Case
Project owner Rexford Industrial Realty and Management, Inc. owns and operates industrial property throughout Southern California. In 2017, Rexford hired contractor Steve Fodor Construction to perform repaving work at Rexford’s property in Carson, California.
Fodor Construction in turn hired subcontractor Caliber Paving Company, Inc. to perform the repaving work. The subcontract divided the parking lot into four areas, with separate costs to repave each area, and Caliber completed its work in one area in June 2017.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
A Race to the Finish on Oroville Dam Spillway Fix
October 09, 2018 —
Scott Blair - Engineering News-RecordThe Lake Oroville spillway’s 400-acre construction site is an intense flurry of activity. In one corner, an excavator driver uses an old tire as a squeegee to clean away loose rock and prep a foundation. In the steeply sloping spillway chute, a crane operator flies in a rebar cage to workers who tie it into neighboring chute wall segments. Everywhere, dump trucks buzz around the circuitous roadways while rock crushers and batch plants keep pace with dozens of dozers and excavators. Drones hover in the sky photographing and surveying the site, while inspectors pour over every detail of the finished assets.
Read the court decisionRead the full story...Reprinted courtesy of
Scott Blair, ENRMr. Blair may be contacted at