Insurer Granted Summary Judgment on Denial of Construction Defect Claim
January 27, 2020 —
Tred R. Eyerly - Insurance Law HawaiiThe court granted the insurer's motion for summary judgment, confirming there was no duty to defend or indemnify a construction defect claim against the insured. Fontaine Bros. v. Acadia Ins. Co., 2019 U.S. Dist. LEXIS 148056 (D. Mass. Aug. 29, 2019).
The City of Worcester contracted with Fontaine Brothers, Inc. to install a new ice refrigeration system at the City's indoor ice rink. After construction, the condensers in two chiller units eroded and stopped operating.
The City sued Fontaine for the costs of leasing temporary chillers and installing new ones. The City alleged that Fontaine installed condensers with carbon steel tubes instead of contractually required stainless stell tubes.Further, Fontaine and its subcontractors did not adequately maintain the condensers, in breach of the contract.
Fontaine's insurer, Acadia Insurance Company, denied coverage. Fontaine sued Acadia. The court noted that the City's complaint plainly alleged faulty workmanship by Fontaine. However, the City's complaint did not allege that Fontaine intended the condensers to corrode and left open the possibility that Fontaine was unaware of any potential problem or did not foresee the corrosion likely to result from the use of carbon steel components or the maintenance work being done by its subcontractor. Therefore, the Cit's complaint did not foreclose the possibility that the corrosion resulting from Fontaine's alleged faulty workmanship and maintenance might be shown to be an unforeseen or unintended consequence of reckless or negligent conduct. Accordingly, it was possible that there was an occurrence under the policy language.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
New York Court Holds That the “Lesser of Two” Doctrine Limits Recoverable Damages in Subrogation Actions
September 23, 2019 —
Michael L. DeBona - The Subrogation StrategistIn New York Cent. Mut. Ins. Co. v. TopBuild Home Servs., Inc., 2019 U.S. Dist. LEXIS 69634 (April 24, 2019), the United States District Court for the Eastern District of New York recently held that the “lesser of two” doctrine applies to subrogation actions, thereby limiting property damages to the lesser of repair costs or the property’s diminution in value.
In New York Cent. Mut. Ins. Co., New York Central Mutual Insurance Company’s (New York Central) insureds, Paul and Karen Mazzola, suffered a fire to their home. After the fire, New York Central paid the Mazzolas $708,465.74 to repair the property. New York Central brought a subrogation action against TopBuild Home Services, Inc. (TopBuild), alleging that the fire was caused by negligent work performed by TopBuild. New York Central sought to recover the repair costs it paid to the Mazzolas. TopBuild conceded liability but disputed the proper measure of damages.
TopBuild filed a motion for partial summary judgment, arguing that under the “lesser of two” doctrine, New York Central could recover only the lesser of the costs to repair the property or the property’s diminution in value. TopBuild, therefore, asserted that New York Central was not entitled to the repair costs of $708,465.74 but, rather, could recover only the property’s decline in value following the fire – approximately $250,000.[1] In response, New York Central argued that New York’s “lesser of two” doctrine does not apply to subrogation actions because an insurance company cannot mitigate the payment it makes to its insured.
Read the court decisionRead the full story...Reprinted courtesy of
Michael L. DeBona, White and Williams LLPMr. DeBona may be contacted at
debonam@whiteandwilliams.com
1st District Joins 2nd District Court of Appeals and Holds that One-Year SOL Applies to Disgorgement Claims
June 14, 2021 —
Garret Murai - California Construction Law BlogWe’re beginning to see a trend.
This past year, the 2nd District Court of Appeals, in Eisenberg Village of the Los Angeles Jewish Home for the Aging v. Suffolk Construction Company, 53 Cal.App.5th 1201 (2020), held for the first time that a one (1) year statute of limitations period beginning upon substantial completion of a project applies to disgorgement claims under Business and Professions Code section 7031. In San Francisco CDC LLC v. Webcor Construction L.P., the 1st District Court of Appeals became the second Court of Appeals in the state to hold that a one (1) year statute of limitations beginning upon completion or cessation of work on a project applies to disgorgement claims under Business and Professions Code section 7031.
The San Francisco CDC LLC Case
The Defect Action
In September 2005, San Francisco CDC LLC entered into a $144 million construction contract with Webcor Construction, Inc. doing business as Webcor Builders to build the InterContinental Hotel in San Francisco, California.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
Ahlers Distinguished As Top Super Lawyer In Washington And Nine Firm Members Recognized As Super Lawyers Or Rising Stars
August 10, 2020 —
Joshua Lane - Ahlers Cressman & Sleight BlogACS is very honored and pleased to announce nine members of our firm were awarded the distinction of top attorneys in Washington. Our blog articles usually cover Construction Legal News, but we feel this is a newsworthy accolade to be shared with friends and clients.
To become candidates to receiving the Super Lawyer nomination, lawyers are nominated by a peer or identified by research. After completing this first step in the process, Super Lawyer’s research department analyzes 12 indicators, such as experience, honors/awards, verdicts/settlements and others. As for the third step, there is a peer evaluation by practice area. Finally, for step four, candidates are grouped into four firm-size categories. In other words, solo and small firm lawyers are compared only with other solo and small firm lawyers, and large firm lawyers are compared with other large firm lawyers. The process is very selective and only 5 percent of the total lawyers in Washington are nominated as Super Lawyers.
John P. Ahlers, one of the firm’s founding partners, was recognized as the Top Lawyer out of all Washington lawyers in the State. Mr. Ahlers stated that “It was humbling to receive this distinction, particularly considering the many talented Super Lawyers in the State and I am a ‘construction lawyer’ to boot! I am grateful for the confidence my many colleagues in the bar have in me, by honoring me with their vote”.
Founding partner Paul R. Cressman Jr. and partner Brett M. Hill were both recognized as one of the 100-Best Lawyers in the State.
Four other firm members are also recognized as Super Lawyers: Scott R. Sleight, Bruce A. Cohen, Lawrence S. Glosser and Ryan W. Sternoff.
Two other firm members, partner Lindsay (Taft) Watkins and associate Scott D. MacDonald are also recognized as Super Lawyer Rising Stars, which recognizes attorneys either 40 years old or younger, or in practice 10 years or less.
Read the court decisionRead the full story...Reprinted courtesy of
Joshua Lane, Ahlers Cressman & SleightMr. Lane may be contacted at
joshua.lane@acslawyers.com
Court of Appeals Finds Additional Insured Coverage Despite “Care, Custody or Control” Exclusion
September 30, 2019 —
Garret Murai - California Construction Law BlogWhen things go wrong on a construction project it’s often a scramble of finger pointing. In McMillin Homes Construction, Inc. v. National Fire & Marine Insurance Company, Case No. D074219 (June 5, 2019), the California Court of Appeals for the 4th District considered whether an additional insured exclusion, excluding “property in the care, custody or control of the additional insured,” precluded a duty to defend by an insurer.
McMillin Homes Construction, Inc. v. National Fire & Marine Insurance Company
McMillin Homes Construction, Inc. was the developer and general contractor on a residential project known as Auburn Lane in Chula Vista, California. McMillin subcontracted with Martin Roofing Company, Inc. to perform roofing work. Under the subcontract, Martin was required to obtain commercial general liability insurance naming McMillin as an additional insured.
The commercial general liability insurance policy secured by Martin was issued by National Fire and Marine Insurance Company. As is typical, the policy covered “property damage” and “personal injury” arising out of an “occurrence” during the policy period. McMillin was covered as additional insured under ISO endorsement form CG 20 09 03 97.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Wendel, Rosen, Black & Dean LLPMr. Murai may be contacted at
gmurai@wendel.com
Maryland Legislation Prohibits Condominium Developers from Shortening Statute of Limitations to Defeat Unit Owner Construction Defect Claims
May 16, 2018 —
Nicholas D. Cowie - Maryland Condo Construction Defect Law BlogNew Maryland legislation prevents developers from shortening the time period within which condominium associations and their unit owner members can assert claims for hidden construction defects in newly constructed condominium communities. The legislation known as HB 77 and SB 258 passed both houses of the Maryland General Assembly and was signed into law by Governor Lawrence J. Hogan on April 24, 2018 (see photo above). Nicholas D. Cowie, Esq. is the author of the legislation, which will be codified as Section 11-134.1 of the Maryland Condominium Act, effective October 1, 2018.
This article discusses how this new legislation ends the practice by which some condominium developers attempted to use condominium documents to shorten the normal statute of limitations in order to prevent condominium associations and their unit owner members from having a fair opportunity to assert their warranty and other legal claims for latent construction defects.
Read the court decisionRead the full story...Reprinted courtesy of
Nicholas D. Cowie, Esq., Cowie & MottMr. Cowie may be contacted at
ndc@cowiemott.com
Notice of Claim Sufficient to Invoke Coverage
August 06, 2014 —
Tred R. Eyerly – Insurance Law HawaiiIndirect notice to the insurer was sufficient to trigger coverage for the additional insured under a liability policy. Spoleta Constr., LLC v. Aspen Ins. UK Ltd., 2014 N.Y. App. Div. LEXIS 5174 (N.Y. App. Div. July 11, 2014).
An employee of the subcontractor was injured at the construction project on October 20, 2008. The general contractor was named as an additional insured on the subcontractor's CGL policy with Aspen. Under the subcontract, the subcontractor also agreed to defend and indemnify the general contractor for all claims arising out of the subcontractor's work.
The general contractor did not receive notice of the accident until late December 2009 in a letter from the injured employee's attorney. On January 27, 2010, the general contractor's liability carrier sent a letter to the subcontractor giving notice of the employee's claim and requesting that the subcontractor put its carrier on notice. On February 9, 2010, the subcontractor sent to Aspen a claim form with the January 2010 letter attached.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
PFAS and the Challenge of Cleaning Up “Forever”
July 31, 2023 —
PFAS Team - Gravel2Gavel Construction & Real Estate Law BlogFrom a stream of legal challenges, to ever-expanding regulations on things like cosmetics and drinking water, PFAS are the “forever chemicals” keeping companies and consumers on high alert. While industries scramble to remove the synthetic compounds from products, scientists are researching new techniques for scrubbing PFAS from the environment. There is money to be had for those who can find a more streamlined method of purging the substances—the U.S. Army Corps of Engineers has an $800 million contract on the table for the handling, destruction and replacement of PFAS-laden fire-fighting foam—leaving technology companies racing to create solutions. The three main PFAS cleaning techniques currently relied upon can be very effective but are also costly and may leave questionable byproducts in their wake.
The established approaches include:
- Granular Activated Carbon. As one of the most studied treatments for PFAS removal, granular activated carbon is often used in water treatment plants. Large beds of carbon essentially soak up the unwanted chemicals. After the Sweeney Water Plant in North Carolina, whose water source is downstream from a fluorochemical-producing Chemours plant, was found to be contaminated with PFAS, the plant invested around $46 million into upgraded activated carbon systems. Once installed, these systems cost roughly $2.9 million to operate yearly, as the carbon needs to be replaced each time it reaches capacity. Though pricey, the plant says that the process now clears close to 100% of PFAS.
Read the court decisionRead the full story...Reprinted courtesy of
PFAS Team, Pillsbury