ABC Safety Report: Construction Companies Can Be Nearly 6 Times Safer Than the Industry Average Through Best Practices
May 06, 2024 —
Associated Builders and ContractorsWASHINGTON, April 30, 2024 (GLOBE NEWSWIRE) -- Associated Builders and Contractors today announced the findings from its
2024 Safety Performance Report, an annual guide to construction jobsite health and safety best practices. The report is unveiled to coincide with
Construction Safety Week, May 6-10.
The annual safety report also provides a comprehensive understanding of the impact of deploying
ABC's STEP Safety Management System, which enables top-performing ABC members to achieve incident rates 576% safer than the U.S. Bureau of Labor Statistics construction industry average. Established in 1989, STEP provides contractors and suppliers with a robust, no-cost framework for measuring safety data and benchmarking with peers in the industry.
ABC's research on more than 900 million work hours completed by participants in the construction, heavy construction, civil engineering and specialty trades in 2023 identified the following foundations of industry-leading safety best practices:
- Top management engagement: Employer involvement at the highest level of company management produces a 54% reduction in total recordable incident rates, or TRIR, and a 52% reduction in days away, restricted or transferred rates, or DART rates.
- Substance abuse prevention programs: Robust substance abuse prevention programs/policies with provisions for drug and alcohol testing where permitted lead to a 47% reduction in TRIR and a 48% reduction in DART rates.
- New hire safety orientation: Companies that conduct an in-depth indoctrination of new employees into the safety culture, systems and processes based on a documented orientation process experience incident rates that are 45% lower than companies that limit their orientations to basic health and safety compliance topics.
- Frequency of toolbox talks: Companies that conduct daily, 15-to-30-minute toolbox talks reduce TRIR and DART rates by 81% compared to companies that hold them monthly.
The 2024 ABC Safety Performance Report is based on submissions of unique company data gathered from members that deployed during the 2023 STEP term, Jan. 15-Dec. 15. ABC collects each company's trailing indicator data as reported on its annual Occupational Safety and Health Administration Form 300A ("Summary of Work-Related Injuries and Illnesses") and its self-assessment of leading indicator practices from its STEP application. Each data point collected is sorted using statistically valid methodology developed by the BLS for its annual Occupational Injuries and Illnesses Survey and then combined to produce analyses of STEP member performance against BLS industry average incident rates. The report demonstrates that applying industry-leading processes dramatically improves health and safety performance among participants regardless of company size or type of work.
Any company can participate in STEP. Visit abc.org/step to begin or continue your safety journey.
Read the court decisionRead the full story...Reprinted courtesy of
Wreckage Removal Underway at Site of Collapsed Key Bridge in Baltimore, But Weather Slows Progress
April 15, 2024 —
Jim Parsons - Engineering News-RecordNote: The text of this article was updated 4/3/24 to reflect new information.
Weather and water conditions are hampering the piece-by-piece process of cutting and removing wreckage from the collapsed Francis Scott Key Bridge in Baltimore, while officials consider potentially utilizing progressive design-build for a replacement bridge. Officials remain uncertain as to how long the meticulous effort to clear the key shipping channel will take.
Reprinted courtesy of
Jim Parsons, Engineering News-Record
ENR may be contacted at enr@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Drafting the Bond Form, Particularly Performance Bond Form
July 14, 2016 —
David Adelstein – Florida Construction Legal UpdatesOftentimes, when it comes to payment and performance bonds (in particular), the bond forms are drafted by the obligee. For example, an owner (as the obligee) may draft the bond forms that it wants its general contractor’s surety to execute. And, a general contractor (as the obligee) may draft the bond forms that it wants its subcontractors’ sureties to execute. As an obligee, it is always beneficial to draft the bond form (particularly the performance bond) that you want the surety to execute. The bond is to benefit you—the obligee—so having a hand in creating conditions to trigger the application of the bond is important, specifically when it comes to triggering a performance bond upon the bond-principal’s default.
Read the court decisionRead the full story...Reprinted courtesy of
David M. Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
Local Government’s Claims on Developer Bonds Dismissed for Failure to Pursue Administrative Remedies
March 22, 2017 —
David R. Cook - Autry, Hanrahan, Hall & Cook, LLPThe Georgia Court of Appeals recently affirmed a trial court’s dismissal of a county’s claim on developer bonds based on its failure to exhaust administrative remedies. Douglas County v. Hamilton State Bank, — Ga. App. –, A16A1708 (Mar. 16, 2017). Specifically, because the bank was under FDIC receivership, the County was required to pursue administrative remedies under the Financial Institutions Reform, Recovery, and Enforcement Act of 1989 (the “Act”).
Read the court decisionRead the full story...Reprinted courtesy of
David R. Cook, Autry, Hanrahan, Hall & Cook, LLPMr. Cook may be contacted at
cook@ahclaw.com
Are We Headed for a Work Shortage?
June 17, 2015 —
Craig Martin – Construction Contractor AdvisorA recent Wall Street Journal article, Worker Shortage Hammers Builders, noted that construction industry employers are facing a tight labor market.
“U.S. builders shed more than 2 million jobs during and after the housing bust. Now they say they can’t find enough carpenters, electricians, plumbers and other craftsmen for a growing pipeline of work.”
That is certainly consistent with everything that I’ve heard and read about construction companies in the Midwest. Unfortunately, it seems as though the problem is only going to get worse.
Read the court decisionRead the full story...Reprinted courtesy of
Craig Martin, Lamson, Dugan and Murray, LLPMr. Martin may be contacted at
cmartin@ldmlaw.com
Alaska District Court Sets Aside Rulings Under New Administration’s EO 13795
May 06, 2019 —
Anthony B. Cavender - Gravel2GavelOn March 29, the U.S. District Court for the District of Alaska issued two separate rulings that reversed and set aside energy and environmental decisions made by the current administration, which had revoked decisions made in these same matters by the prior administration. The cases are League of Conservation Voters, et al., v. Trump (concerning the development of oil and gas leases on the Outer Continental Shelf (OCS)) and Friends of Alaska National Wildlife Refuges, et al., v. Bernhardt, Acting Secretary of the U.S. Department of the Interior (which concerns a Land Exchange that would facilitate the construction of a road between two remote Alaska communities when that road would traverse parts of a designated national wilderness).
In the League of Conservation Voters matter, the District Court held that the President’s Executive Order 13795 (released on April 28, 2017), which purported to revoke President Obama’s decisions to withdraw certain OCS tracts from oil and gas exploration and development, was unlawful because it was not authorized by Section 12(a) of the Outer Continental Shelf Lands Act (OCSLA). In 2015 and 2016, President Obama issued Presidential Memorandums and an Executive Order withdrawing these particular tracts.
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com
Brown Paint Doesn’t Cover Up Construction Defects
April 25, 2012 —
CDJ STAFFIn a decision that describes the case as illustrating “the perils that real estate brokers and their agents assume when acting as a dual listing agent to both the buyers and sellers of the same house,” the California Court of Appeals has issued a decision in William L. Lyon & Associates v. The Superior Court of Placer County. Lyon & Associates sought summary judgment to dismiss the claims of the Henleys who bought a home in a transaction where a Lyon agent represented both sides.
The prior owners of the home, the Costas, had used a Lyon agent in purchasing their home. When they later sought to sell it, that agent “became aware of some of the house’s defects and problems.” In response, the Costas sought the help of another agent, Connie Gidal, also of Lyons & Associates. Photos taken in the presence of Ms. Gidal show defects of the paint and stucco. The Costas also took the step of painting the house dark brown. During the sale process, “rain caused many of the painted-over defects to reappear.” The Costas “purchased more dark brown paint and covered up the newly visible damage prior to inspection by the Henleys.”
With the damage concealed, the Henleys bought the home in May 2006. The agreement with Lyons & Associates noted that “a dual agent is obligated to disclose known facts materially affecting the value or desirability of the property to both parties.” Escrow closed on May 9, 2006. The contract with the broker included a two-year limit on the time to bring legal action.
The Henleys moved in during June 2006, and “began to discover construction defects that had been concealed by the Costas.” In addition to the painted-over stucco problems, the Henleys found that the Costas had “installed quartzite stone overlays on the backyard steps in a manner that caused water intrusion on the house’s stucco walls.”
In May 2009, the Henleys sued the Costas, Ron McKim Construction, Lyons & Associates, and Ms. Gidal. Their complaint alleged that Lyons & Associates had committed breach of contact, negligence, fraud, breach of fiduciary duty, and negligent nondisclosure in connection with the construction defects. The Costas named Lyons in a cross complaint. Lyons moved for summary judgments on the grounds that the two-year statute of limitations had expired before the complaint and cross-complaint were filed. Both the Henleys and the Costas opposed this claim. The court denied the motion and Lyons appealed.
The appeals court upheld the denial, noting that the both California Supreme Court decision and later action by the legislature compels real estate brokers and salespersons “to conduct a reasonably competent and diligent visual inspection of the property offered for sale.” The court noted that under California law, brokers have responsibilities to both sellers and buyers. The section of law cited by Lyons applies to seller’s agents. The court rejected the contention by Lyons that they were “cooperating brokers.” The Henleys were “not constrained by the two-year statute of limitations.”
Lyons contended that even if California’s statute did not apply, there was a contractual limit of two years. The court also rejected this, agreeing with the Henleys that “the two-year limitation period must be extended by the discovery rule.”
The court noted that “Lyon & Associates may not reap the benefit of a shortened contractual limitation period when its own alleged malfeasance contributed to the delay in the discovery of the buyer’s injury.” The court found that the Henleys could proceed with their breach of contract claim, because, “when a breach of contract is committed in secret, such as the intentional nondisclosure of a real estate broker regarding a previously visible construction defect, the contractual limitations period is properly held subject to the discovery rule.” The court felt that the interpretation favored by the California Association of Realtors would “halve the applicable statute of limitations period.”
In addition to rejecting Lyon request for summary judgment on the claims made by the Henleys, the court also rejected the request of summary judgment on the claims made by the Costas, concluding that neither claim is time-barred. Costs were awarded to both the Henleys and Costas.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Traub Lieberman Partner Greg Pennington and Associate Kevin Sullivan Win Summary Judgment Dismissing Homeowner’s Claim that Presented an Issue of First Impression in New Jersey
December 02, 2019 —
Gregory S. Pennington & Kevin Sullivan - Traub LiebermanOn July 12, 2019, Traub Lieberman Straus & Shrewsberry LLP’s Gregory S. Pennington and Kevin Sullivan secured summary judgment dismissing a homeowner’s claim for damaged flooring. The claim at issue arose from the homeowners’ attempt to discard their refrigerator. In the process of removing the refrigerator, the homeowners scratched their kitchen and dining room floors. The homeowners made a claim under their homeowners policy for the cost to repair and replace the damaged flooring. Their homeowners’ insurer denied their claim based on a policy exclusion barring coverage for damage consisting of or caused by marring and scratching. When their insurer denied coverage, the homeowners filed suit in the New Jersey Superior Court, Law Division in Bergen County. The case presented the issue of first impression in New Jersey of whether a homeowner’s self-inflicted, but accidental damaging of its own floors was barred by the homeowner’s policy’s marring or scratching exclusion. Greg and Kevin successfully argued that the exclusion applied to bar coverage.
Reprinted courtesy of
Gregory S. Pennington, Traub Lieberman and
Kevin Sullivan, Traub Lieberman
Mr. Pennington may be contacted at gpennington@tlsslaw.com
Mr. Sullivan may be contacted at ksullivan@tlsslaw.com
Read the court decisionRead the full story...Reprinted courtesy of