Business Interruption Claim Upheld
April 01, 2015 —
Tred R. Eyerly – Insurance Law HawaiiA business interruption claim survived an appeal after it was determined the claim was satisfactorily presented to the trial court. Citadel Broadcasting Corp. v. Axis U.S. Ins. Co., 2015 La. App. LEXIS 274 (La. Ct. App. Feb. 11, 2015).
When Hurricane Katrina hit on August 29, 2005, the insured owned three radio stations that broadcast in and around New Orleans. All three stations suffered property damage and were off the air for varying periods of time.
The insured's policy with Axis covered both physical damage and business interruption (BI) losses. The policy also insured contingent business interruption income (CBI). Both ordinary BI and CBI losses were covered under a 365 day extended period of indemnity (EPI).
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Construction Defect Lawsuit Came too Late in Minnesota
June 28, 2013 —
CDJ STAFFThe Minnesota Court of Appeals has upheld a summary judgment in a construction defect case, Lee v. Gorham. Minnesota law requires that contractors warranty that the home will be free of major construction defects during the first ten years, but claims must “be brought within two years of the discovery of the breach.” The Lees received a home inspection report in 2009 that identified a variety of defects, including “several possible structural defects.” The court noted that the report stated, “Contact your builder in writing of the findings, and discuss your options with an attorney.”
The Lees contacted the contractor, Gorham Builders. After initial silence, Gorham told the Lees that problems would “have to be ‘turned over to [the] insurance company.’” Rodney noted in his testimony that he had two choices, to either sue Gorham or hire an outside contractor. Mr. Lee had concluded that the legal costs were likely to be equal to the cost of the contractor.
In June, 2011, the Lees changed their mind about bringing a suit. Gorham sought and received a summary judgment dismissing the case on the grounds that too much time had passed since the Lees learned of the construction defect. The Lees appealed.
The appeals court upheld the summary judgment. The Lees claimed that the 2009 home inspection did not alert them of a “major construction defect,” but the court concluded that the language of the report fit within the Minnesota statutory definition of a “major construction defect.”
Nor was the appeals court convinced that at any time did Gorham provide “assurances that it would cure the defects to the home.” Within the same month as the May 2009 inspection, Gorham had made it clear that any problems were an issue for the insurance company. Thus, the appeals court concluded that the Lee’s equitable-estoppel argument was without merit.
The Lees also brought to appeal the new argument that they did not realize they were dealing with “major construction defects” until they received a subsequent home inspection in 2011. The court noted that the second report does not detail “new defects or structural issues not identified in the 2009 inspection report.” In addition to being “without merit,” the court noted that this claim was not made in the district court and so the appeals court “need not consider this issue on appeal.”
Read the court decisionRead the full story...Reprinted courtesy of
Mitigating Mold Exposure in Manufacturing and Multifamily Buildings
July 31, 2024 —
Laura Champagne - Construction ExecutiveAs hurricanes season and summer storms approach, more apartment complexes, commercial and industrial properties, and public buildings are at risk of leaking and flooding. Water-saturated structures are prime breeding grounds for mold, but there are ways to prevent, detect and remove it before it becomes a serious and costly issue—for buildings and building residents alike. Being proactive limits an owner’s exposure to the liability of debilitating health effects and structural safety concerns.
Mold requires three things to grow: water, food and humidity. Water will stealthily penetrate small porous surfaces of any building material, such as drywall, plaster, wood, concrete or even fabrics. These materials serve as a food source to quickly produce more fungus. Common sources of undetected water flow include foundation problems, poorly installed windows, roof malfunctions, gutter clogs, storm damage, leaky pipes, improper drainage, HVAC issues, faulty appliances, bathroom vent issues and wet building materials. Mold loves humidity and thrives in dark, warm environments, such as attics, basements, lofts, building corners and bathrooms.
Reprinted courtesy of
Laura Champagne, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Florida trigger
August 04, 2011 —
CDCoverage.comIn Mid-Continent Casualty Co. v. Siena Home Corp., No. 5:08-CV-385-Oc-10GJK (M.D. Fla. July 8, 2011), insured residential real estate developer Siena was sued by homeowners seeking damages for moisture penetration property damage resulting from exterior wall construction defects. Siena’s CGL insurer Mid-Continent filed suit seeking a declaratory judgment of no duty to defend or indemnify in part on the basis that the alleged “property damage” did not manifest during the Mid-Continent policy period.
Read the full story…
Reprinted courtesy of CDCoverage.com
Read the court decisionRead the full story...Reprinted courtesy of
Florida Courts Inundated by Wave of New Lawsuits as Sweeping Tort Reform Appears Imminent
April 03, 2023 —
John A. Rine - Lewis BrisboisTampa, Fla. (March 22, 2023) – Plaintiffs’ attorneys throughout Florida are rushing to file lawsuits in anticipation of sweeping tort reform legislation. It has been reported that some plaintiffs’ firms in the Sunshine State have filed hundreds – and in some cases thousands – of new lawsuits this week ahead of the potential enactment of the bill. It has also been reported that this record number of new suits being filed is causing difficulty and failures in some court computer systems.
These plaintiffs’ attorneys are panicked by HB 837. This bill will potentially provide the most radical tort reform the state has seen in several decades. The specific revisions to civil litigation are dramatic. For instance, the statute of limitations would be cut in half, from four years to two years. Additionally, insurance carriers would be immune from claims of bad faith if they tender the limits within 90 days of notice of a claim. Carriers will also enjoy numerous new protections from bad faith litigation even where there is no tender in the first 90 days.
Read the court decisionRead the full story...Reprinted courtesy of
John A. Rine, Lewis BrisboisMr. Rine may be contacted at
John.Rine@lewisbrisbois.com
What Construction Firm Employers Should Do Right Now to Minimize Legal Risk of Discrimination and Harassment Lawsuits
October 07, 2024 —
Anthony LaPlaca, Dawn Solowey, Andrew Scroggins & Adrienne LeeSeyfarth Synopsis: In June 2024, Seyfarth published a blog article warning construction industry employers of recent anti-harassment guidelines issued by the EEOC. We predicted that the EEOC has “put the construction industry squarely in its sights.”[1] In this follow-up Alert, we discuss recent cases confirming the renewed regulatory focus on the construction sector, which demonstrate the need to put in place sound practices for non-discriminatory recruitment, hiring, and training of the work force in order to be prepared for this heightened risk of government scrutiny.
Recent EEOC Settlements
The U.S. Equal Employment Opportunity Commission (EEOC) has indicated, in no uncertain terms, that over the next five years it intends to prioritize the mitigation of systemic workplace problems and the historical underrepresentation of women and workers of color in the construction sector.[2] Two recent cases confirm that the EEOC is true to its word when it comes to tackling racial and gender disparities in the construction work force.
In August 2024, the EEOC secured two consent decrees with two separate construction firms in Florida, totaling nearly $3 million.
Reprinted courtesy of
Anthony LaPlaca, Seyfarth,
Dawn Solowey, Seyfarth,
Andrew Scroggins, Seyfarth and
Adrienne Lee, Seyfarth
Mr. LaPlaca may be contacted at alaplaca@seyfarth.com
Ms. Solowey may be contacted at dsolowey@seyfarth.com
Mr. Scroggins may be contacted at ascroggins@seyfarth.com
Ms. Lee may be contacted at aclee@seyfarth.com
Read the court decisionRead the full story...Reprinted courtesy of
A Termination for Convenience Is Not a Termination for Default
April 22, 2024 —
David Adelstein - Florida Construction Legal UpdatesA termination for convenience is NOT a termination for default. They are NOT the same. They should NOT be treated as the same. I am a huge proponent of termination for convenience provisions because sometimes a party needs to be able to exercise a termination for convenience, but the termination is not one that rises to a basis for default. However, exercising a termination for convenience does not mean you get to go back in time and convert the termination for convenience into a termination for default. It does not work like that. Nor should it.
An opinion out of the Civilian Board of Contract Appeals – Williams Building Company, Inc. v. Department of State, CBCA 7147, 2024 WL 1099788 (CBCA 2024 – demonstrates a fundamental distinction between a termination for convenience and a termination for default, i.e., that you don’t get to conjure up defaults when you exercise a termination for convenience:
Because a termination for convenience essentially turns a fixed-price construction contract into a cost-reimbursement contract, allowing the contractor to recover its incurred performance costs, the resolution of this appeal will involve identifying the total costs that [Contractor] incurred in performing this contract before [Government] terminated it for convenience. Since [Government] terminated the contract for convenience rather than for default, it no longer matters whether, in the past,[Contractor] acted intentionally in overstating the amount of its incurred costs or committed a contract breach. Ultimately, as permitted in response to a termination for convenience, [Contractor] will recover those allowable costs that [Contractor]establishes it incurred in performing the contract.
Williams Building Company, supra.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Business Risk Exclusions Do Not Preclude Coverage
November 13, 2013 —
Tred Eyerly — Insurance Law HawaiiThe court rejected the insurer's arguments that the business risk exclusions barred coverage for a contractor. Gen. Cas. Co. of Wisconsin v. Five Star Bldg. Corp., 2013 U.S. Dist. LEXIS 134122 (D. Mass. Sept. 19, 2013).
Five Star was hired by the University of Massachusetts to upgrade the ventilation (HVAC) system on a portion of a building. The large majority of the work involved work in the interior of the building, but a small portion required installation of duct work and supports on top of the roof of the complex. Five Star also penetrated the roof at numerous locations to install supports for duct work and other rooftop structures for the ventilation system. Other subcontractors then secured supports to the concrete roof deck and installed permanent patches where Five Star had penetrated the roofing system.
On same days, Five Star could not accomplish the process in a single day after penetrating the roof. It would install temporary patches until the next day. This was the only work on the roof performed by Five Star.
Read the court decisionRead the full story...Reprinted courtesy of
Tred EyerlyTred Eyerly can be contacted at