BERT HOWE
  • Nationwide: (800) 482-1822    
    Medical building building expert Seattle Washington condominiums building expert Seattle Washington low-income housing building expert Seattle Washington casino resort building expert Seattle Washington Subterranean parking building expert Seattle Washington condominium building expert Seattle Washington industrial building building expert Seattle Washington townhome construction building expert Seattle Washington custom homes building expert Seattle Washington institutional building building expert Seattle Washington custom home building expert Seattle Washington production housing building expert Seattle Washington office building building expert Seattle Washington parking structure building expert Seattle Washington high-rise construction building expert Seattle Washington concrete tilt-up building expert Seattle Washington mid-rise construction building expert Seattle Washington structural steel construction building expert Seattle Washington multi family housing building expert Seattle Washington retail construction building expert Seattle Washington housing building expert Seattle Washington tract home building expert Seattle Washington
    Seattle Washington expert witness roofingSeattle Washington construction scheduling and change order evaluation expert witnessSeattle Washington construction project management expert witnessSeattle Washington delay claim expert witnessSeattle Washington stucco expert witnessSeattle Washington forensic architectSeattle Washington architectural engineering expert witness
    Arrange No Cost Consultation
    Building Expert Builders Information
    Seattle, Washington

    Washington Builders Right To Repair Current Law Summary:

    Current Law Summary: (SB 5536) The legislature passed a contractor protection bill that reduces contractors' exposure to lawsuits to six years from 12, and gives builders seven "affirmative defenses" to counter defect complaints from homeowners. Claimant must provide notice no later than 45 days before filing action; within 21 days of notice of claim, "construction professional" must serve response; claimant must accept or reject inspection proposal or settlement offer within 30 days; within 14 days following inspection, construction pro must serve written offer to remedy/compromise/settle; claimant can reject all offers; statutes of limitations are tolled until 60 days after period of time during which filing of action is barred under section 3 of the act. This law applies to single-family dwellings and condos.


    Building Expert Contractors Licensing
    Guidelines Seattle Washington

    A license is required for plumbing, and electrical trades. Businesses must register with the Secretary of State.


    Building Expert Contractors Building Industry
    Association Directory
    MBuilders Association of King & Snohomish Counties
    Local # 4955
    335 116th Ave SE
    Bellevue, WA 98004

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of Kitsap County
    Local # 4944
    5251 Auto Ctr Way
    Bremerton, WA 98312

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of Spokane
    Local # 4966
    5813 E 4th Ave Ste 201
    Spokane, WA 99212

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of North Central
    Local # 4957
    PO Box 2065
    Wenatchee, WA 98801

    Seattle Washington Building Expert 10/ 10

    MBuilders Association of Pierce County
    Local # 4977
    PO Box 1913 Suite 301
    Tacoma, WA 98401

    Seattle Washington Building Expert 10/ 10

    North Peninsula Builders Association
    Local # 4927
    PO Box 748
    Port Angeles, WA 98362
    Seattle Washington Building Expert 10/ 10

    Jefferson County Home Builders Association
    Local # 4947
    PO Box 1399
    Port Hadlock, WA 98339

    Seattle Washington Building Expert 10/ 10


    Building Expert News and Information
    For Seattle Washington


    Rainwater Collecting on Rooftop is not Subject to Policy's Flood Sublimits

    Sinking S.F. Tower Prompts More Lawsuits

    No Coverage Based Upon Your Prior Work Exclusion

    Progress, Property, and Privacy: Discussing Human-Led Infrastructure with Jeff Schumacher

    Construction Defect Claim Not Timely Filed

    Alaska District Court Sets Aside Rulings Under New Administration’s EO 13795

    Effects of Amendment to Florida's Statute of Repose on the Products Completed Operations Hazard

    Appraisal Appropriate Despite Pending Coverage Issues

    Precast Standards' Work Under Way as Brittle Fracture Warnings Aired

    A Court-Side Seat: Appeals and Agency Developments at the Close of 2020

    In Oregon Construction Defect Claims, “Contract Is (Still) King”

    XL Group Pairs with America Contractor’s Insurance Group to Improve Quality of Construction

    Massachusetts Federal Court Holds No Coverage for Mold and Water Damage Claim

    Mediating is Eye Opening

    Smart Contracts Poised to Impact the Future of Construction

    Court Sharpens The “Sword” And Strengthens The “Shield” Of Contractors’ License Law

    How the Parking Garage Conquered the City

    Want to Build Affordable Housing in the Heart of Paris? Make It Chic.

    Pulling the Plug

    TRI Pointe Merges with Weyerhaeuser’s Real Estate Company

    Court Makes an Unsettling Inference to Find that the Statute of Limitations Bars Claims Arising from a 1997 Northridge Earthquake Settlement

    Hawaii Federal Court Grants Insured's Motion for Remand

    Balfour in Talks With Carillion About $5 Billion Merger

    Massachusetts Court Holds Statute of Repose Bars Certain Asbestos-Related Construction Claims

    Failure to Comply with Contract Leaves No Additional Insured Coverage

    When is a Contract not a Contract?

    Erdogan Vows to Punish Shoddy Builders Ahead of Crucial Election

    No Collapse Coverage Where Policy's Collapse Provisions Deleted

    You Are on Notice: Failure to Comply With Contractual Notice Provisions Can Be Fatal to Your Claim

    Traub Lieberman Partner Jonathan Harwood Obtains Summary Judgment Determining Insurer Has No Duty to Defend or Indemnify

    Select the Best Contract Model to Mitigate Risk and Achieve Energy Project Success

    Cold Weather Causes Power Blackouts, Disruptions on Jobsites

    Illinois Appellate Court Affirms Duty to Defend Construction Defect Case

    2018 Super Lawyers and Rising Stars!

    Massachusetts Federal Court Rejects Adria Towers, Finds Construction Defects Not an “Occurrence”

    Mitigating FCRA Risk Through Insurance

    Triggering Duty to Advance Costs Same Standard as Duty to Defend

    Enforceability Of Subcontract “Pay-When-Paid” Provisions – An Important Update

    Viva La France! 2024 Summer Olympics Construction Features Sustainable Design, Including, Simply Not Building at All

    Persimmon Offers to Fix Risky Homes as Cladding Crisis Grows

    NY Estimating Consultant Settles $3.1M Government Project Fraud Case

    New York Climate Mobilization Act Update: Reducing Carbon Emissions and Funding Solutions

    Subcontractor Not Liable for Defending Contractor in Construction Defect Case

    Newmeyer Dillion Attorneys Named to 2020 Southern California Rising Stars List

    Just Because I May Be An “Expert” Does Not Mean I Am Giving Expert Testimony

    The Cheap and Easy Climate Fix That Can Cool the Planet Fast

    A Court-Side Seat: As SCOTUS Decides Another Regulatory “Takings” Case, a Flurry of Action at EPA

    Assessments Underway After Hurricane Milton Rips Off Stadium Roof, Snaps Crane Boom in Florida

    Boston Tower Project to Create 450 Jobs

    Appeals Court Rules that Vertical and Not Horizontal Exhaustion Applies to Primary and First-Layer Excess Insurance
    Corporate Profile

    SEATTLE WASHINGTON BUILDING EXPERT
    DIRECTORY AND CAPABILITIES

    The Seattle, Washington Building Expert Group is comprised from a number of credentialed construction professionals possessing extensive trial support experience relevant to construction defect and claims matters. Leveraging from more than 25 years experience, BHA provides construction related trial support and expert services to the nation's most recognized construction litigation practitioners, Fortune 500 builders, commercial general liability carriers, owners, construction practice groups, and a variety of state and local government agencies.

    Building Expert News & Info
    Seattle, Washington

    Potential Extension of the Statutes of Limitation and Repose for Colorado Construction Defect Claims

    April 27, 2020 —
    On January 27th, Senator Robert Rodriguez introduced SB 20-138 into the Colorado Legislature. The bill has been assigned to the Senate Judiciary Committee and has not yet been scheduled for its first hearing in that committee. In short, Senate Bill 20-138, if enacted, would:
    1. Extend Colorado’s statute of repose for construction defects from 6+2 years to 10+2 years;
    2. Require tolling of the statute of repose until the claimant discovers not only the physical manifestation of a construction defect, but also its cause; and
    3. Permit statutory and equitable tolling of the statute of repose.
    Colorado’s statute of repose for construction defect claims are codified at C.R.S. § 13-80-104. In 1986, the Colorado Legislature set the statute of repose period at 6+2 years. For the last 34 years, Colorado’s statute of repose for owners’ claims against construction professionals has been substantially the same, to wit:
    (1) (a) Notwithstanding any statutory provision to the contrary, all actions against any architect, contractor, builder or builder vendor, engineer, or inspector performing or furnishing the design, planning, supervision, inspection, construction, or observation of construction of any improvement to real property shall be brought within the time provided in section 13-80-102 after the claim for relief arises, and not thereafter, but in no case shall such an action be brought more than six years after the substantial completion of the improvement to the real property, except as provided in subsection (2) of this section.
    (2) In case any such cause of action arises during the fifth or sixth year after substantial completion of the improvement to real property, said action shall be brought within two years after the date upon which said cause of action arises.
    Read the court decision
    Read the full story...
    Reprinted courtesy of David McLain, Higgins, Hopkins, McLain & Roswell
    Mr. McLain may be contacted at mclain@hhmrlaw.com

    Rio de Janeiro's Bursting Real-Estate Bubble

    September 17, 2015 —
    At opposite ends of downtown Rio de Janeiro, projects tied to Donald Trump and Eike Batista-- one a billionaire-turned-politician, the other Brazil’s most famous ex-billionaire -- have come to represent the city’s real estate bust. The 23-story Serrador building, a granite-and-glass art deco tower near Rio’s Santos Dumont airport, has sat empty since Batista’s failed empire of commodities companies abandoned it last year. Four miles away, in the city’s gritty port district, an ambitious office project that Trump lent his name to is still nothing more than a weed-filled lot about a year after construction was slated to begin. Reprinted courtesy of Juan Pablo Spinetto, Bloomberg and Peter Millard, Bloomberg Read the court decision
    Read the full story...
    Reprinted courtesy of

    Mortgage Bonds Stare Down End of Fed Easing as Gains Persist

    October 29, 2014 —
    The end of the Federal Reserve’s third round of bond purchases is proving to be a non-event for mortgage-backed debt. That’s partly because even though the U.S. central bank won’t be adding more home-loan securities to its balance sheet, policy makers will still be buying enough to prevent its holdings from shrinking. Those purchases are having a greater impact as the pace of net issuance slows to a quarter of the amount last year amid a weaker property market. The $5.4 trillion market for government-backed mortgage bonds is defying predictions for a slump tied to the wind-down of the Fed stimulus program, whose completion economists predict will be announced today. Yields on benchmark Fannie Mae (FNMA) notes have shrunk 0.14 percentage point this year relative to government debt, narrowing to within 1.09 percentage points of an average of five- and 10-year Treasury rates. Read the court decision
    Read the full story...
    Reprinted courtesy of Jody Shenn, Bloomberg
    Ms. Shenn may be contacted at jshenn@bloomberg.net

    How Does Your Construction Contract Treat Float

    November 08, 2017 —
    Although there are different types of construction schedule float and more technical definitions, the definition that makes sense to me is that float is the amount of time a particular activity can be delayed without that activity delaying the project’s completion date (substantial completion date). In looking at a construction schedule, this determination is made from looking at the difference between the early start date for an activity and the late start date for that activity or the difference between the early finish date for that activity and the late finish date for that activity in your CPM schedule (which should be the same amount of time). This is often referred to as “total float” and is the float that I usually focus on since it may pertain to a delay to the substantial completion date of the project and can trigger either the assessment of liquidated damages and/or the contractor’s extended general conditions, whatever the case may be. Read the court decision
    Read the full story...
    Reprinted courtesy of David Adelstein, Florida Construction Legal Updates
    Mr. Adelstein may be contacted at Dadelstein@gmail.com

    “Since You Asked. . .”

    October 15, 2024 —
    … you must now pay. So said a California appellate court, affirming the trial court’s decision against a subcontractor suing for unpaid subcontract sums. Instead of being awarded those unpaid amounts, the subcontractor lost the case and was tagged with a $1.55 million attorney’s fees award and $270,000 costs award in favor of the defendants. What went wrong? California law requires a licensed contractor to maintain at all times proper workers’ compensation insurance coverage. The failure to maintain the coverage and have the certificate of coverage on file with the California Contractors State License Board results in “automatic and immediate suspension” of the contractor license. Retroactive reinstatement of the license may occur only if the contractor provides proof of the insurance within 90 days of the effective date of the insurance certificate – unless the contractor can show that failure to have the certificate on file was “due to circumstances beyond the control of the licensee.” Read the court decision
    Read the full story...
    Reprinted courtesy of Daniel Lund III, Phelps
    Mr. Lund may be contacted at daniel.lund@phelps.com

    Court Rejects Anti-SLAPP Motion in Construction Defect Suit

    September 01, 2011 —

    The California Court of Appeals has upheld the denial of an anti-SLAPP motion in Claredon American Insurance Company v. Bishop, Barry, Howe, Haney & Ryder. This case was triggered by a water intrusion problem at a condominium complex, the Terraces at Emerystation, built and sold by Wareham Development Corporation. The insurer, Claredon, retained Risk Enterprise Management as the third party claims administrator. REM retained the law firm Bishop, Barry, Howe, Haney & Ryder. The construction defect case was settled in 2007 and the condo owners moved back by early 2008.

    Due to issues with the claims settlement, Claredon filed against REM for “professional negligence, indemnity, apportionment and contribution,” with a cross-complaint that the cross-defendants negligently defended the developer, Wareham.

    In response, the cross-defendants filed a motion to strike the cross-complaint under the anti-SLAPP statute. The trial court denied this motion and now this has been upheld by the appeals court.

    The court noted that “The fundamental thrust of the cross-complaint is not protected litigation-related speech and petitioning activity undertaken on another’s behalf in a judicial proceeding.”

    Read the court’s decision…

    Read the court decision
    Read the full story...
    Reprinted courtesy of

    Recording a Lis Pendens Is Crucial

    January 04, 2023 —
    If you are in a construction dispute where you are pursuing a construction lien foreclosure action, recording a lis pendens is crucial. Did I say crucial? “[O]ne purpose of a notice of lis pendens is to alert all others that title to the property is involved in litigation and that ‘future purchasers or encumbrancers of that property’ are at risk of being bound by an adverse judgment.” Henry v. AIM Industries, LLC, 47 Fla.L.Weekly D653b (Fla. 2d DCA 2022). There really is never a reason not to record a lis pendens when pursing a construction lien foreclosure. Please remember that – don’t forget to record the lis pendens! There are times a lis pendens is recorded when the lis pendens is NOT based on a duly recorded instrument (e.g., construction lien or mortgage). A lis pendens, however, is recorded because the dispute is tied to the property in which the lis pendens is being recorded. The lis pendens is recorded to best safeguard the plaintiff’s interest in the real property without fear that the real property will be sold impacting the purpose (and, of course, security) of the lawsuit. Read the court decision
    Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris, P.A.
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    Trends in Project Delivery Methods in Construction

    April 03, 2023 —
    The three key measures of a construction project’s success are cost, quality, and time (delays). The project delivery method that the owner of the project selects can affect each of these metrics. Project delivery methods in complex construction projects evolve as technology and processes improve. The traditional methods of design-bid-build (DBB), design-build (DB), and construction management (CM) have been the standard for many years. More recently, however, newer methods such as integrated project delivery (IPD), and public-private partnerships (PPP) have gained traction. Design – Bid – Build (DBB) Design-bid-build is the oldest, most commonly used method of project delivery. It involves three distinct phases: design, bid/award, and construction. An owner asks a team of professionals, such as architects, engineers, and contractors, to produce design documents that will be used to solicit bids. After the owner evaluates the bids and chooses a contractor, a construction contract is written. While this method is the most familiar and well-understood, it can lead to disputes during the construction process as changes are made to the original plans. In DBB, the owner bears the risk for funding increased costs attributed to design changes and related delays – thanks to the Spearin Doctrine, which holds that the owner impliedly warrants the information, plans, and specifications that it provides to a general contractor. See 248 U.S. 132 (1918) Although the owner cannot claim against the contractor, it can make a claim against the design firm. Read the court decision
    Read the full story...
    Reprinted courtesy of Sarah B. Biser, Fox Rothschild LLP (ConsensusDocs)
    Ms. Biser may be contacted at sbiser@foxrothschild.com