January 28, 2019 —
David Adelstein - Florida Construction Legal UpdatesAn expert’s qualifications are important. Please remember this the next time you retain an expert to analyze documents or data and render an opinion based on that information. An expert must be qualified to render an opinion. Otherwise the expert will not be allowed to render the opinion you may be looking for or need for purposes of trial, as discussed below.
A recent personal injury case, White v. Ring Power Corp., 43 Fla.L.Weekly D2729a (Fla. 3d 2018), involved a crane operator that became severely injured when operating a leased crane. The case proceeded to trial against only the equipment lessor of the crane based on the plaintiff’s contention that there were deficiencies with the crane. The plaintiff intended on using expert witnesses to interpret the crane’s load movement indicator (referred to as LMI) and render opinions that the LMI data showed prior overloads of the crane which resulted in the injury to the operator of the crane.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
On Rehearing, Fifth Circuit Finds Contractual-Liability Exclusion Does Not Apply
November 26, 2014 —
Tred R. Eyerly – Insurance Law HawaiiOn rehearing, the Fifth Circuit determined that the contractual-liability exclusion did not apply to bar coverage for damage caused by the insured contractor to the home it constructed. Crownover v. Mid-Continent Cas. Co., 2014 U.S. App. LEXIS 20727 (5th Cir. Oct. 29, 2014).The court withdrew its prior opinion, summarized here.
Arrow Development, Inc. contracted with the Crownovers to construct a home. The contract had a warranty-to-repair clause, which, in paragraph 23.1, provided that Arrow would "promptly correct work . . . failing to confirm to the requirements of the Contract Documents." After the Crownovers moved in, cracks began to appear in the walls and foundation of the home. Additional problems with the heating, ventilation, and air conditioning ("HVAC") caused leaking in the exterior lines and air ducts inside the home. To compensate for defects in the HVAC system, the system's mechanical units ran almost continuously in order to heat or cool the home. Because they were overburdened, the mechanical units had to be replaced. The Crownovers paid several hundred thousand dollars to fix the problems with the foundation and HVAC system.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Failing to Adopt a Comprehensive Cyber Plan Can Lead to Disaster
January 13, 2020 —
Richard Volack - Construction ExecutiveDespite being aware of cyber risk, and even frightened by it, a shocking number of companies in the construction industry have neither a cyber insurance policy nor a basic cyber security plan to deal with a hack or breach into their computer systems. Once breached, companies with no plan in place become, essentially, a rudderless ship subject to the whims of criminal tides.
A proper cyber plan lays out at least the following:
- the criteria for when a plan would be triggered (i.e., in the event of a breach or a hack);
- which persons inside the company (in-house counsel, IT personnel, executive, project managers) and which persons outside the company (attorney with knowledge of cyber issues and ideally construction law as well; forensic computer experts, crisis management experts; and an insurance broker familiar with cyber policies) should be involved;
- the chain of command and communication in this type of situation and the distinct roles each of the above players will fulfill (Note: this is not the same as the normal corporate chain of command); and
- the various available options to address the breach situation, which will all depend upon the facts at issue—such as the type and extent of the breach and how much of what particular kind of information was lost, stolen or exfiltrated.
Reprinted courtesy of
Richard Volack, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Mr. Volack may be contacted at rvolack@pecklaw.com
Read the court decisionRead the full story...Reprinted courtesy of
New ConsensusDocs 242 Design Professional Change Order Form Helps Facilitate Compensation for Changes in Design Services
November 05, 2024 —
Brian Perlberg - ConsensusDocsConsensusDocs is publishing a new ConsensusDocs 242 Change in Services and Compensation, a change order for design services by a design professional. In the design and construction industry, one thing is certain – change. The work scope included in basic design services an architect or engineer provides occurs somewhat regularly. Previously, ConsensusDocs did not have a standard contract document for changing design professionals’ prices. As a result of user feedback, the ConsensusDocs Contract Content Advisory Council (CCAC) drafted this new architect/engineer change order. The CCAC unanimously approved the new contract document and publication is set for October 14, 2024. The document will be available for most ConsensusDocs subscribers. The full, owner, design-professional, and short-form subscription packages will include the document. A subscription package can be purchased through ConsensusDocs here.
The design professional change order helps owners of construction projects keep track of additional services their design professionals perform. The design professional must provide itemized labor breakdowns for each invoice. The new ConsensusDocs 242 has options for compensation to be actual hours at the billing rate or a lump sum. The new contract document form also has a table for the remaining project deliverables and their respective due dates.
Read the court decisionRead the full story...Reprinted courtesy of
Brian Perlberg, ConsensusDocs CoalitionMr. Perlberg may be contacted at
bperlberg@ConsensusDocs.org
99-Year-Old Transmission Tower Seen as Possible Cause of Devastating Calif. Wildfire
December 11, 2018 —
Contra Costa Times - Engineering News-RecordDec. 08 --PULGA -- With winds gusting around 50 mph in the morning hours of Nov. 8 , portions of a PG&E steel lattice transmission tower -- exposed to the elements high on a ridgetop and originally built when Woodrow Wilson was president -- failed.
As high-voltage lines got loose and whipped around, striking the metal tower, molten aluminum and metal sprayed across tinder dry vegetation, igniting the brush. Arriving firefighters could only watch as the blaze underneath the power lines quickly spread to wild timber and brush.
Read the court decisionRead the full story...Reprinted courtesy of
Engineering News-RecordENR may be contacted at
ENR.com@bnpmedia.com
Unrelated Claims Against Architects Amount to Two Different Claims
July 30, 2014 —
Tred R. Eyerly – Insurance Law HawaiiThe Second Circuit found that two claims arising from the same project were unrelated, creating two separate payments by the insurer for the two separate claims. Dormitory Auth. of New York v. Continental Cas. Co., 2014 U.S. App. 12088 (2nd Cir. June 23, 2014).
In 1995, the State agency contracted with the insured architectural firm to design and oversee the construction of a new dormitory at City University of New York. Plans drawn by the architects erred in their estimate of the steel requirement. To recover losses from the resulting delay and expense, the agency sent a demand letter in May 2002 to the architects detailing the Steel Girt Tolerance issue.
After the project was finished in 2001, another problem was discovered: excess accumulations of snow and ice were sliding off the building onto sidewalks a considerable distance away. The Ice Control Issue was studied during the winter of 2003-04. The conclusion was that the design of the facade failed to account for temperature variations appropriate for a building in New York. The problem could not be resolved by adding canopies, which would have been a cheaper fix. Study of the problem continued into 2005.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
RDU Terminal 1: Going Green
June 30, 2014 —
Melissa Dewey Brumback – Construction Law in North CarolinaLast week, I had the fortune to join the Triangle USGBC for its “Talk & Walk” about the RDU Terminal 1 renovation project and its sustainable features. For those who haven’t had the chance, I recommend you check out the new terminal specifics the next time you find yourself jet-setting in or out of Raleigh on Southwest airlines.
Terminal 1 has been in operation since 1981, with the last upgrade in 1991. The 2010 opening of the new Terminal 2 had, until now, cemented Terminal 1′s status as the airport’s ugly duckling- complete with the long, featureless metal addition abandoned to times past.
While the $68 million Terminal 1 renovation cannot compete with the Terminal 2 $580 million budget, it nevertheless is an entirely re-imagined space. Better traffic flow (yes, you can now find where to go through security!), increased daylighting, a new canopy system, and commercial curb canopy (see photo) all complete the new architectural image.
Clark Nexsen principals Irvin Pearce and Doug Brinkley explained the renovation, which included energy saving escalators- the first escalator system in North Carolina that slows down during non-use. Other sustainable features include LEED complaint flooring, 86% structural building re-use (slabs on grade, composite decks, and structural roof deck), and 28% reuse of exterior walls.
Read the court decisionRead the full story...Reprinted courtesy of
Melissa Dewey Brumback, Construction Law in North CarolinaMs. Brumback can be contacted at
mbrumback@rl-law.com
CGL Policies and the Professional Liabilities Exclusion
August 14, 2018 —
David Adelstein - Florida Construction Legal UpdatesCommercial general liability (CGL) policies for contractors traditionally contain a professional liabilities exclusion. This exclusion is generally added through a specific endorsement to eliminate coverage for professional services. Read the endorsement The point of the exclusion, in a nutshell, is simply to eliminate a CGL policy for a contractor serving as a professional liability policy.
Contractors need to appreciate a professional liabilities exclusion added through endorsement because oftentimes there are delegated design components they are responsible for. Perhaps the contractor value engineered a system and is responsible for engineering and signing and sealing the engineered documents (through its subcontractor) associated with that system. Perhaps there is a performance specification that requires the contractor to engineer a system. Perhaps there is a design-build component. Regardless of the circumstance, this professional liabilities exclusion can certainly come into play, particularly if a defect is raised with the design or professional services associated with the engineered system.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com