A UK Bridge That Is a Lesson on How to Build Infrastructure
November 15, 2017 —
Cameron J. Bell - Engineering News-RecordThis country’s infrastructure—bridges, airports, dams and levees—needs wide-scale repair and renewal. The United Kingdom’s new Queensferry Crossing bridge, connecting Edinburgh to Fife in Scotland, sets a new standard for how to do it. The result speaks for itself: The Queensferry Crossing, a three-tower, 1.7-mile-long cable-stayed bridge, debuted in early September well within budget and a manageable eight-month time delay—a rare occurrence among bridges. According to research at the University of Oxford’s Saïd Business School, nine out of 10 fixed links (bridges and tunnels) suffer an average cost overrun of 34% and a time delay of roughly two years.
Read the court decisionRead the full story...Reprinted courtesy of
Cameron J. Bell, ENR ENR may be contacted at
ENR.com@bnpmedia.com
Court Finds That Split in Underground Storage Tank is Not a Covered Collapse
July 13, 2017 —
Christopher Kendrick & Valerie A. Moore – Haight Brown & Bonesteel LLPIn Tustin Field Gas & Food v. Mid-Century Ins. Co. (No. B268850, filed 7/3/17), a California appeals court ruled that a split in an underground storage tank, caused by the tank sitting on a rock for years, was not a covered “collapse” as a matter of law.
Tustin Field owned a gas station in Palm Springs. The installer of the underground storage tanks did not follow the manufacturer’s instructions to bury them in pea gravel or crushed rock. Instead, the installer just dug a hole, placed the tanks into that hole, and then covered them with “native soil” containing rocks, boulders and other debris.
The tanks were double-walled, steel with a fiberglass sheath. Sixteen years after installation, testing revealed that the fiberglass sheath on one tank was no longer intact. The tank was excavated and the fiberglass sheath was found to be cracked from the tank sitting on a nine-inch boulder. The insured paid to have the crack repaired and made a claim for the cost of excavating and repairing the tank.
Reprinted courtesy of
Christopher Kendrick, Haight Brown & Bonesteel LLP and
Valerie A. Moore, Haight Brown & Bonesteel LLP
Mr. Kendrick may be contacted at ckendrick@hbblaw.com
Ms. Moore may be contacted at vmoore@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Economy in U.S. Picked Up on Consumer Spending, Construction
October 02, 2015 —
Shobhana Chandra – BloombergThe world’s largest economy expanded more than previously forecast in the second quarter, boosted by gains in consumer spending and construction that may help the U.S. withstand a global slowdown.
Gross domestic product rose at a 3.9 percent annualized rate, compared with a prior estimate of 3.7 percent, Commerce Department figures showed Friday in Washington. The median forecast of 76 economists surveyed by Bloomberg called for a 3.7 percent gain.
Strong hiring, cheaper gasoline and higher home prices will probably sustain household purchases, which account for about 70 percent of the economy. That helps bolster Federal Reserve Chair Janet Yellen’s view that the U.S. will overcome any fallout from cooling overseas markets and swings in global financial and commodity markets.
Read the court decisionRead the full story...Reprinted courtesy of
Shobhana Chandra, Bloomberg
Newmeyer & Dillion Named for Top-Tier Practice Areas in 2018 U.S. News – Best Law Firms List
November 02, 2017 —
Newmeyer & Dillion LLPNEWPORT BEACH, Calif. – NOVEMBER 2, 2017 – Prominent business and real estate law firm Newmeyer & Dillion LLP is pleased to announce that U.S. News-Best Lawyers® recognized the firm's Orange County office in its "Best Law Firms" 2018 list, ranking five of its practice areas with its highest ranking possible - Tier 1. These areas include Commercial Litigation, Construction law, Insurance law, Litigation - Construction and Litigation - Real Estate.
"We continue to be honored that our clients and peers recognize the foundational principles this firm was built on - personalized service and achieving the best results possible." said Jeff Dennis, Newmeyer & Dillion's Managing Partner.
Firms included in the 2018 "Best Law Firms" list are recognized for professional excellence with persistently impressive ratings from clients and peers. Achieving a tiered ranking signals a unique combination of quality law practice and breadth of legal expertise.
The 2018 rankings are based on a rigorous evaluation process that includes the collection of client and lawyer evaluations, peer review from leading attorneys in their field, and review of additional information provided by law firms as part of the formal submission process. To be eligible for a ranking, a firm must have a lawyer listed in The Best Lawyers in America, which recognizes the top 4 percent of practicing attorneys in the U.S. More than 21,000 attorneys provided almost 700,000 law firm assessments, and more than 8,0000 clients provided more than 47,000 evaluations.
About Newmeyer & Dillion
For more than 30 years, Newmeyer & Dillion has delivered creative and outstanding legal solutions and trial results for a wide array of clients. With over 70 attorneys practicing in all aspects of business, employment, real estate, construction and insurance law, Newmeyer & Dillion delivers legal services tailored to meet each client’s needs. Headquartered in Newport Beach, California, with offices in Walnut Creek, California and Las Vegas, Nevada, Newmeyer & Dillion attorneys are recognized by The Best Lawyers in America©, and Super Lawyers as top tier, and have been given Martindale-Hubbell Peer Review's AV Preeminent highest rating. For additional information, call 949-854-7000 or visit www.ndlf.com.
Read the court decisionRead the full story...Reprinted courtesy of
UK Court Rules Against Bechtel in High-Speed Rail Contract Dispute
March 29, 2021 —
Peter Reina - Engineering News-RecordThe U.K. subsidiary of Bechtel Inc. has lost its legal challenge against the owner of the U.K. London-Birmingham high-speed railroad project, HS2, over its failed bid for a roughly $140-million Construction Partner (CP) contract in early 2019.
Reprinted courtesy of
Peter Reina, Engineering News-Record
Mr. Reina may be contacted at reina@btinternet.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
6,500 Bridges in Ohio Allegedly Functionally Obsolete or Structurally Deficient
June 17, 2015 —
Beverley BevenFlorez-CDJ STAFFThe Portsmouth Daily Times reported that U.S. Senator Sherrod Brown (D-OH) released a report that declared “6,500 bridges in Ohio are either functionally obsolete or structurally deficient as defined by the Federal Highway Administration (FHWA).” According to the Portsmouth Daily Times, the “FHWA defines Functionally Obsolete as a bridge that is no longer by design functionally adequate for its task” and “Structurally Deficient as a bridge that has one or more structural defects that require attention.” Brown’s solution to the issue is to pass a long-term transportation bill.
Read the court decisionRead the full story...Reprinted courtesy of
New York Court of Appeals Takes Narrow View of Labor Law Provisions in Recent Cases
July 03, 2022 —
Lisa M. Rolle & Matthew Feinberg - Traub LiebermanSince the end of March, the New York State Court of Appeals has issued decisions in favor of the defense concerning New York Labor Law §240 and §241. These pro-defendant decisions take a narrow view of the scope of the Labor Law provisions. However, while it remains to be seen how the Court’s below will apply the Court of Appeal’s reasoning, these recent decisions are beneficial for the defense bar going forward.
In Toussaint v Port Auth. of N.Y. & N.J March 22, 2022 N.Y. LEXIS 391 | 2022 NY Slip Op 01955 | 2022 WL 837579, the Court held that 12 NYCRR 23-9.9 (a), does not set forth a concrete specification sufficient to give rise to a non-delegable duty under Labor Law § 241 (6). In Toussaint Plaintiff, who was an employee of Skanska USA Civil Northeast, Inc., brought the lawsuit against the Port Authority asserting claims under Labor Law § 200 (1) and Labor Law § 241 (6) after he was struck by a power buggy while operating a rebar-bending machine at the World Trade Center Transportation Hub construction site owned by the Port Authority of New York and New Jersey. Power buggies are small, self-operated vehicles used to move materials on construction sites. On the day of the accident, a trained and properly designated operator drove the buggy into the area near the plaintiff's workstation. That vehicle operator got off the vehicle, but short time thereafter, another worker—who was not designated or trained to do so—drove the buggy a short while prior to losing control and striking plaintiff. Plaintiff relied upon 12 NYCRR 23-9.9(a) which states that “[no person other than a trained and competent operator designated by the employer shall operate a power buggy.” In rejecting plaintiff’s argument the Court held that the "trained and competent operator" requirement is general, as it lacks a specific requirement or standard of conduct.
Reprinted courtesy of
Lisa M. Rolle, Traub Lieberman and
Matthew Feinberg, Traub Lieberman
Ms. Rolle may be contacted at lrolle@tlsslaw.com
Mr. Feinberg may be contacted at mfeinberg@tlsslaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Negligent Inspection Claim Against Supervising Design Professional / Consultant
August 07, 2023 —
David Adelstein - Florida Construction Legal UpdatesCan a negligence argument be created against consulting design professionals or entities that are involved in the inspection of a trade’s work? The recent opinion in Bautech USA, Inc. v. Resolve Equipment, Inc., 2023 WL 4186395 (S.D.Fla. 2023) contains an interesting fact pattern that touches upon this issue. While the case dealt with a motion to dismiss, it contains a number of issues that may be discussed in follow-up postings.
Here, a prime contractor was hired by Broward County, Florida to install offshore reef mitigation units. The contractor entered into a subcontract with a concrete fabricator to fabricate the reef mitigation units. The contractor also separately hired consultants to inspect the units. The contractor and its consultants rejected the units even after the fabricator implemented design revisions. The fabricator was then terminated and not paid for contract work plus revisions it implemented to finished units. The fabricator sued the contractor and the contractor’s consultants for non-payment under many (ten) different theories of liability claiming it was damaged to the tune of millions of dollars.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com