A DC Office Building Offers a Lesson in Glass and Sculpture
May 08, 2023 —
Kriston Capps - BloombergFrom the outside, the facade of 2050 M Street, an office building in Washington, DC, looks like it’s made with liquid soap. Standing inside and looking out, its structure is almost invisible. The building, which was finished in 2020, boasts an ethereal curtain wall, created from hundreds of fluted planes of glass treated with a special industrial coating. The result is a multifaceted surface that pushes the limits of transparency, enhanced with a silver opal shine.
According to Joshua Ramus, founding principal of the architecture firm REX, the 12-story structure’s design reflects Washington’s building history, while its construction required a rather novel procurement process. The building, he says, is very much a DC story.
Each of its 978 glass panels is concave, shaped using an innovative machine called a bending tempering furnace. Curving glass makes it stronger as a material, and this building’s panes are strong enough to stand up with minimal infrastructure. The building doesn’t employ mullions, window components that hold glass in place. Even a few years ago, achieving such an effect by shaping pieces of glass would have been prohibitively expensive.
Read the court decisionRead the full story...Reprinted courtesy of
Kriston Capps, Bloomberg
2016 California Construction Law Upate
December 10, 2015 —
Garret Murai – California Construction Law BlogThe California State Legislature saw the introduction of 2,297 bills during the first half of the 2015-2016 legislative session of which 1,010 bills were signed into law.
For contractors, the bill (now law), having the most immediate effect is SB 467, which increases the license bond amount required of all contractors from $12,500 to $15,000. In addition to licensing changes, 2015 saw the enactment of a number of bills providing for alternative project delivery methods from design-build, to CM at risk, to public-private partnerships, and even the expanded use of enhanced infrastructure financing districts as the state enters its fourth year since the abolishment of redevelopment agencies.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Wendel Rosen Black & Dean LLPMr. Murai may be contacted at
gmurai@wendel.com
Alleging and Proving a Florida Deceptive and Unfair Trade Practices Act (FDUTPA) Claim
December 13, 2021 —
David Adelstein - Florida Construction Legal UpdatesWhen it comes to construction disputes, a Florida Deceptive and Unfair Trade Practices Act (known by its acronym “FDUTPA”) claim is not commonly asserted. A FDUTPA claim is a statutory claim under Florida Statute s. 501.201 en seq. This claim is NOT easy to prove, particularly in the construction context. Sometimes, a party will assert a FDUTPA claim to create a basis for attorney’s fees; however, that basis cuts BOTH ways, i.e., you can be liable for fees if you fail to prove the FDUTPA claim. In a construction dispute, a FDUTPA claim is one that really should be pled with caution after a party understands and fully considers what it MUST prove including the all-important consideration of how actual damages are determined under FDUTPA, which requires an actual loss. Nevertheless, it is good to know what you need to prove to support a FDUTPA claim in case you believe you have facts that can support a FDUTPA claim and actual damages under FDUTPA (known as benefit-of-the-bargain damages).
Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.
Mr. Adelstein may be contacted at dma@kirwinnorris.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Real Case, Real Lessons: Understanding Builders’ Risk Insurance Limits
August 12, 2024 —
David McLain - Higgins, Hopkins, McLain & Roswell, LLCIn the recent case of 5333 Mattress King LLC v. Hanover Insurance Company, the United States District Court for the District of Colorado provided significant insights into the limits of builders’ risk insurance policies. Mattress King LLC, a warehouse owner, faced a substantial loss when a subcontractor drove a crane over and damaged the warehouse’s concrete floor slab during construction. Despite having a builders’ risk insurance policy with Hanover Insurance Company, coverage was denied, leading to litigation.
Applicable Policy Provisions
The policy in question was a Commercial Marine/Commercial Lines Builders’ Risk insurance policy. Builders’ risk insurance is designed to cover direct physical loss to covered property during construction unless the loss is excluded or limited by the policy. Key exclusions of the policy at issue included losses caused by faulty, inadequate, or defective:
- Planning, zoning, surveying, or development
- Design, specifications, workmanship, repair, construction, renovation, remodeling, grading, or compaction
- Materials used in construction or renovation
- Maintenance of the covered property
Read the court decisionRead the full story...Reprinted courtesy of
David McLain, Higgins, Hopkins, McLain & Roswell, LLCMr. McLain may be contacted at
mclain@hhmrlaw.com
Editorial: Qatar Is Champion of Safety Hypocrisy in Migrant Worker Deaths
December 26, 2022 —
ENR Editorial Board - Engineering News-RecordOnce the World Cup soccer tournament concludes, decency dictates that someone should put a wrecking ball to Qatar’s Al Bayt and Lusail stadiums, where the opening ceremonies and matches were held. There’s no polite way to say it: bulldozing the World Cup sports facilities is the only way to amplify to the world the cost in migrant construction workers lives in all that was constructed.
Reprinted courtesy of
ENR Editorial Board, Engineering News-Record
ENR may be contacted at enr@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Skipping Depositions does not Constitute Failure to Cooperate in New York
March 09, 2020 —
Ryan G. Nelson - Saxe Doernberger & VitaInsurance policies typically impose, on the insured, a duty to cooperate with the insurer during investigation and litigation of a claim. Non-cooperation can be grounds for denying coverage. This begs the question: what constitutes non-cooperation?
Recently, a New York appellate court affirmed a trial court’s decision that failure by an employee of the insured to show up for three court-ordered depositions did not rise to the level of “willful and avowed obstruction” and therefore, the insurer could not deny coverage on the basis of non-cooperation. See Foddrell v. Utica First Insurance Co., 178 A.D.3d 901 (N.Y. App. Div. 2019). In so holding, the Foddrell court applied the Thrasher test: “To effectively deny coverage based upon lack of cooperation, an insurance carrier must demonstrate (1) that it acted diligently in seeking to bring about the insured’s cooperation, (2) that the efforts employed by the insured were reasonably calculated to obtain the insured’s cooperation, and (3) that the attitude of the insured, after his or her cooperation was sought, was one of willful and avowed obstruction.” Id.; see Thrasher v. U. S. Liab. Ins. Co., 19 N.Y.2d 159, 167 (1967).
Thomas Foddrell’s suit against Utica First Insurance Company (“Utica First”) stemmed from his personal injury suit against Janey & Rana Construction Corporation (“J&R” (Utica First’s insured). During that lawsuit, J&R’s principal, Gardeep Singh, failed to appear for two court-ordered depositions. After his failure to appear at those depositions, Utica First sent an investigator to inform Singh that he was scheduled for a third deposition. Singh responded to the investigator that he would speak with J&R’s attorneys about the matter. Ultimately, Singh did not appear for the third court-ordered deposition. In response to Singh’s repeated failure to appear for the depositions, Utica First sent Singh a letter advising him that because of his lack of cooperation, Utica would no longer agree to indemnify J&R.
Read the court decisionRead the full story...Reprinted courtesy of
Ryan G. Nelson, Saxe Doernberger & VitaMr. Nelson may be contacted at
rgn@sdvlaw.com
Insurers Dispute Sharing of Defense in Construction Defect Case
May 13, 2024 —
Tred R. Eyerly - Insurance Law HawaiiThe California Court of Appeal affirmed the trial court's decision that the defending insurer was not entitled to reimbursement of defense costs from another insurer based upon a subcontract and additional insured endorsement. Zurich Am. Ins. Co. v. Old Republic Gen. Ins. Corp., 2024 Cal. App. Unpub. LEXIS 1261 (Cal. Ct. App. Feb. 28, 2024).
Martin McNerney Development Company (McNerney) entered a construction contract to perform seismic upgrades and tenant improvements for condominiums. McNerney and Broadway Mechanical Contractors, Inc. (Broadway) entered a "Subcontract Agreement" under which Broadway was to perform plumbing work at the project. The agreement required Broadway to maintain general liability insurance naming McNerney as an additional insured for work performed on the project, including completed operations. The subcontract also required Broadway to indemnify and hold McNerney harmless with respect to all claims for damage to property arising out of work performed by Broadway.
Broadway completed its work on the project in September 2007. Broadway issued a one-year warranty for its work on the project.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Beware of Statutory Limits on Change Orders
February 18, 2015 —
Craig Martin – Construction Contractor AdvisorWhile change orders are always part of construction projects, it’s important to know whether a public agency is limited on how much it can increase the scope of the work through change orders. A contractor in Virginia found out the hard way that the state agency did not have the authority to increase the scope of the project and thus the contractor could not collect for the extra work.
In Carnell Construction Corp. v. Danville Redevelopment & Housing Authority, the contractor was hired by the housing authority to prepare a site for construction. The project did not go well and both sides blamed the other for delays and increased costs. After being removed from the project, the contractor sued the housing authority for, among other things, breach of contract. The jury awarded the contractor a total of $915,000 for the housing authority’s failure to pay for extra work and improper removal.
Read the court decisionRead the full story...Reprinted courtesy of
Craig Martin, Lamson, Dugan and Murray, LLPMr. Martin may be contacted at
cmartin@ldmlaw.com