Lawsuits over Roof Dropped
December 04, 2013 —
CDJ STAFFAn Iowa roofing contractor has dropped its lawsuit over a contract to re-roof a condominium complex. The condominium association has dropped its counterclaim against the roofer. Hansel Construction alleged that the Harbourage Owners Association failed to fulfill the contract’s provisions, which prevented Hansel Construction from fulfilling its contract. Further, Hansel alleged that it had expenses, losses, and damages, as a result of Harbourage’s actions.
In response, Harbourage sued James Hansel. Now, both lawsuits have been dismissed by the parties.
Read the court decisionRead the full story...Reprinted courtesy of
Application Of Two Construction Contract Provisions: No-Damages-For-Delay And Liquidated Damages
February 14, 2022 —
David Adelstein - Florida Construction Legal UpdatesA recent Florida opinion between a prime contractor and a Florida public body touches upon two important issues: (1) the application of a no-damage-for-delay provision; and (2) the application of a liquidated damages provision. Both provisions find there way into many construction contracts. Unfortunately, the opinion is sparse on facts. Nevertheless, the application of these provisions is worthy of consideration.
In this opinion, Sarasota County v. Southern Underground Industries, Inc., 2022 WL 162977 (Fla. 2d DCA 2022), a county hired a contractor to install sanitary and water piping underneath a waterway. During construction, a nearby homeowner complained that vibration from the drilling caused damage to his home. As a result, the county stopped the contractor’s work to address a potential safety issue, as it was contractually entitled to do. The contractor hired a structural engineer to inspect the house and the engineer issued a report determining that any alleged damage was cosmetic and that there was sufficient monitoring of the vibrations to prevent future damage. The contractor also had an insurance policy to cover any homeowner claim for damage. However, upon receipt of the engineer’s report, the county did not lift its stop work order. Rather, the stop work order remained in place for an additional 71 days.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Rhode Island Closes One Bridge and May Have Burned Others with Ensuing Lawsuit
October 07, 2024 —
Bill Wilson - Construction Law ZoneThe state of Rhode Island recently filed a lawsuit against 13 companies that provided design, construction, and inspection services over the past ten years (the extent allowed by the applicable statute of limitations) to the Washington Bridge, which carries I-195 between East Providence and Providence. The bridge was abruptly closed in December 2023 following the discovery of alleged fractured steel tie-downs critical to the bridge’s stability and additional deterioration in cantilever beams throughout the bridge. Before the closure, approximately 90,000 vehicles per day traveled over the bridge.
The complaint alleges that the defendants, the majority of which are experienced, industry-leading firms in their respective fields, were negligent and breached their respective contracts with the State. The State contends that every company that worked on the bridge over the past ten years missed the serious structural conditions alleged. The lawsuit also claims that the State has suffered millions of dollars of damages since the bridge was closed and seeks indemnity and contribution from all defendants to the extent that the State may be liable to third parties in the future.
Read the court decisionRead the full story...Reprinted courtesy of
Bill Wilson, Robinson & Cole LLP
Getting U.S to Zero Carbon Will Take a $2.5 Trillion Investment by 2030
December 29, 2020 —
Will Wade & Eric Roston - BloombergIt’s going to take $2.5 trillion in spending over the next decade to get the U.S. on a path to a carbon-free economy, but the transition will help to pay for itself, Princeton University researchers say.
Achieving net-zero emissions by 2050 -- a central goal of President-elect Joe Biden’s climate plan -- would require expanding renewable-energy systems, building more efficient homes and putting 50 million electric cars on the road, according to a report released Tuesday.
The effort, two years in the making, is the first major assessment since the election detailing how the U.S. can transition to an energy system that satisfies scientific guidance for keeping the climate livable. While the upfront costs are significant, they would be offset by savings associated with switching to cheaper electricity and the creation of as many as 1 million new jobs, according to the researchers, who shared an earlier draft with Biden’s transition team.
Read the court decisionRead the full story...Reprinted courtesy of
Will Wade & Eric Roston, Bloomberg
Construction Litigation Roundup: “Too Soon?”
July 02, 2024 —
Daniel Lund III - LexologyNot at all, said the Louisiana Supreme Court, in a case dealing with the timing of filing of a claim for indemnity.
In the case, a Louisiana intermediate appellate court had earlier ruled in very short order on a supervisory writ application (reversing the trial court) that a claim for indemnity (based upon an indemnity clause in a construction contract) was “premature” until a “determination that damages are actually owed and the indemnitee sustains a loss. … At this time, the lawsuit is still pending against [the putative indemnitee], and no determination of liability had been made; thus, there is no obligation for indemnity and defense costs. … Stated differently, indemnity (or reimbursement) is not available at this time because [the indemnitee] has not discharged a liability which [the indemnitor] should have assumed or otherwise suffered any loss or damages. … Accordingly, [the] cause of action for indemnity and defense is not ripe for adjudication.” Bennett v. Demco Energy Servs., LLC, 2023-0581 (La. App. 1 Cir. 09/11/23); 2023 La. App. LEXIS 1449.
Read the court decisionRead the full story...Reprinted courtesy of
Daniel Lund III, PhelpsMr. Lund may be contacted at
daniel.lund@phelps.com
A Tort, By Any Other Name, is Just a Tort: Massachusetts Court Bars Contract Claims That Sound in Negligence
March 20, 2023 —
Gus Sara - The Subrogation StrategistIn University of Massachusetts Building Authority v. Adams Plumbing & Heating, Inc., 2023 Mass. App. Unpub. LEXIS 28, 102 Mass. App. Ct. 1107, the Appeals Court of Massachusetts (Appeals Court) considered whether the lower court properly held that the plaintiff’s breach of contract and indemnification claims were time-barred by the statute of repose because they sounded in tort. The Appeals Court held that while the six-year statute of repose only applies to tort claims, they can also bar claims for breach of contract and indemnification if they sound in tort. The Appeals Court affirmed the lower court’s ruling, finding that the plaintiff’s breach of contract and indemnification claims were just negligence claims disguised as non-tort claims.
In 2013 and 2014, the University of Massachusetts (UMass) retained various contractors to renovate the dining hall for one of its campus buildings, which included the installation of new ductwork for the kitchen’s exhaust system. The dining hall opened for service in September 2014. In the Spring of 2018, it was discovered that the ductwork for the kitchen had collapsed. Further investigation revealed other deficiencies with the exhaust system. On December 1, 2020, UMass filed a lawsuit against various contractors, asserting negligence, breach of contract, and indemnification. The breach of contract claims alleged breach of express warranties.
Read the court decisionRead the full story...Reprinted courtesy of
Gus Sara, White and WilliamsMr. Sara may be contacted at
sarag@whiteandwilliams.com
Kahana Feld LLP Senior Attorney Rachael Marvin and Partner Dominic Donato Obtain Complete Dismissal of Plaintiff’s Labor Law Claims on Summary Judgment
August 19, 2024 —
Rachel Marvin - Kahana FeldKahana Feld attorneys Rachael Marvin and Dominic Donato secured summary judgment dismissal of plaintiff’s Labor Law §§ 240(1), 241(6), and 200 claims asserted against their client, a general contractor of a housing project in Orange County, New York. The case involved a construction accident in which plaintiff fell while traversing a ramp, which was placed across an eight-foot-deep excavation trench.
Plaintiff was employed by a subcontractor and was part of a crew performing the framing work on the project. The accident occurred when he exited his work area by walking across a ramp that was placed across the excavated trench, when the ramp gave way and plaintiff fell into the excavation.
Read the court decisionRead the full story...Reprinted courtesy of
Rachel Marvin, Kahana FeldMs. Marvin may be contacted at
rmarvin@kahanafeld.com
In Pennsylvania, Contractors Can Be Liable to Third Parties for Obvious Defects in Completed Work
July 10, 2023 —
Michael L. DeBona - The Subrogation StrategistIn Brown v. City of Oil City, No. 6 WAP 2022, 2023 Pa. LEXIS 681 (2023), the Supreme Court of Pennsylvania (Supreme Court) recently held that a contractor can be liable for dangerous conditions it creates even if the hazard is obvious or known by the property owner. In City of Oil City, the City of Oil City (Oil City) contracted with Harold Best and Struxures, LLC and Fred Burns, Inc. (collectively Contractors) to reconstruct the concrete stairs to the city library. Contractors completed their work at the end of 2011. In early 2012, Oil City received reports of issues with the stairs. Oil City notified Contractors that it considered the stairs dangerous and that Contractors’ defective workmanship created the condition. Neither Oil City or Contractors took any action to fix the stairs or warn of the danger and the stairs’ condition worsened with time.
On November 23, 2015, David and Kathryn Brown exited the library. Kathryn Brown tripped on one of the deteriorated steps, falling and striking her head. Kathryn suffered a traumatic head injury and passed away six days later. The Estate of Kathryn Brown and David Brown, individually (collectively, the Browns), sued Oil City as the owner of the library and Contractors. With respect to Contractors, the Browns asserted that Contractors’ work on the stairs created a dangerous condition that presented an unreasonable risk of harm to those using the steps.
Read the court decisionRead the full story...Reprinted courtesy of
Michael L. DeBona, White and WilliamsMr. DeBona may be contacted at
debonam@whiteandwilliams.com