Settlement Reached in California Animal Shelter Construction Defect Case
May 13, 2014 —
Beverley BevenFlorez-CDJ STAFFA construction defect case involving an animal shelter in Healdsburg, California has settled after two years of litigation, according to The Press Democrat. The $3.5 million, 7,500-square foot building had been “built largely with a behest from the estate of the late vintner Rodney Strong and his wife, Charlotte.” However, “shortly before the facility could be completed in late 2011, general contractor Syd Kelly went bankrupt. Unpaid sub-contractors filed liens for payment against the Healdsburg Animal Shelter, which in turn alleged construction and design defects in the building.”
The Press Democrat reported that “[t]he most visible signs of problems were cracks in the cement foundation.” Robert Wilkie, the Healdsburg Animal Shelter board’s secretary-treasurer, stated that the shelter is “perfectly structurally viable and a rather attractive building” and that “the defects that make it not usable today can be mitigated in a variety of different ways.”
Read the court decisionRead the full story...Reprinted courtesy of
Defense Owed to Insured Subcontractor, but not to Additional Insured
December 13, 2022 —
Tred R. Eyerly - Insurance Law HawaiiAffirming the district court, the Eleventh Circuit agreed that the insured subcontractor was entitled to a defense against claims of faulty workmanship, but no defense was owed to the additional insured subcontractor. Cincinnati Spec. Underwriters Ins. Co. v. KNS Group, LLC, 2022 U.S. App. LEXIS 27949 (11th Cir. Oct. 6. 2022).
The general contractor on a project to build a casino and hotel hired GM&P Consulting and Glazing Contractors, Inc. (GM&P) to provide exterior glazing for the building. GM&P enlisted subcontractor KNS to assist it by glazing glass and installing window walls. KNS agreed to provide commercial general liability and other types of insurance, and to indemnify GM&P for liability for damages caused by any of its acts or omissions. KNS acquired a policy from Cincinnati.
The casino filed suit against the general contractor and subcontractors, alleging that GM&P installed defective "Glass Facade" and improperly installed windows. GM&P filed a Hird-party complaint against KNS due to KNS's alleged defective construction of the casino.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Pre-Covid Construction Contracts Unworkable as Costs Surge, Webuild Says
October 17, 2022 —
Angus Whitley - BloombergInfrastructure construction contracts signed before the pandemic have become widely unworkable because of the surging cost of labor and materials, supply-chain blockages and difficulties in securing manpower, according to builder Webuild SpA.
Milan-based Webuild is wrestling with a 2019 agreement with the Australian government to construct the country’s largest hydroelectric power station for A$5.1 billion ($3.2 billion). It’s meant to be completed by 2026. The Snowy 2.0 project, in the Snowy mountains about six hours’ drive south of Sydney, has come to highlight the challenges of completing large-scale projects on terms that were struck before Covid-19, and before Russia invaded Ukraine.
Webuild’s Asia-Pacific director, Marco Assorati, said the value of the Snowy contract, as well as certain other parameters, need to be changed to reflect the current market. He declined to comment specifically on media reports that the consortium has asked the Australian government for an extra A$2.2 billion to complete the work and that the project is 18 months behind schedule. “It is challenging,” Assorati said.
“I think clients understand this conversation must happen and there must be a way to cope with unforeseen increases in cost,” Assorati said. “It’s not needed only on the Snowy project. It’s affecting projects everywhere globally.”
Read the court decisionRead the full story...Reprinted courtesy of
Angus Whitley, Bloomberg
Saving Manhattan: Agencies, Consultants, Contractors Join Fight to Keep New York City Above Water
November 27, 2023 —
Pam McFarland & Corinne Grinapol - Engineering News-RecordIn densely populated cities surrounded on all sides by water—the borough of Manhattan in New York City as a prime example—the risks from sea level rise and climate change are not just hypotheticals; they are existential threats.
Reprinted courtesy of
Pam McFarland, Engineering News-Record and
Corinne Grinapol, Engineering News-Record
Ms. McFarland may be contacted at mcfarlandp@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Construction Defects through the Years
July 31, 2013 —
CDJ STAFFBuilder has an article on the some building changes over the years that have led to construction defect problems. Is insulation evil? Well, that what some thought in the 1930s. Early attempts at insulating walls trapped moisture causing paint to peel. Then in the 1960s, the rise of aluminum wire lead to an even more serious problem: house fires.
And it continues. The plastic piping that was though to last forever when it was installed in the late 70s turned out to have about a decade of life. It’s a short forever. Eventually, polybutylene plumbing was forbidden by building codes.
The article has a series of building innovations that seemed like great ideas at the time, but were later found to be problematic.
Read the court decisionRead the full story...Reprinted courtesy of
Department Of Labor Recovers $724K In Back Wages, Damages For 255 Workers After Phoenix Contractor Denied Overtime Pay, Falsified Records
February 01, 2023 —
U.S. Department of LaborPHOENIX – The U.S. Department of Labor has recovered $724,082 in back wages and damages for 255 employees of an electrical contractor in Phoenix who denied them overtime wages and falsified records.
An investigation by the department’s
Wage and Hour Division found IES Residential – a subsidiary of one of the nation’s largest electrical, HVAC and plumbing, solar and cable installation contractors – capped employees’ overtime at eight hours despite some employees working up to 60 hours in a workweek.
The division also learned the employer told workers – some who arrived as early as 4:45 a.m. and worked as late as 7 p.m. to record 40 hours or less on their timesheets unless their overtime was pre-approved. When IES Residential did approve, the employer limited overtime to eight hours per week even when employees worked as many as 23 hours of overtime in a workweek.
“The U.S. Department of Labor will hold employers accountable for wage theft, particularly in cases like this one, where IES Residential deliberately attempted to evade the law by instructing employees to falsify timesheets to avoid paying overtime wages,” said Wage and Hour Division District Director Eric Murray in Phoenix. “Employers who fail to pay workers their full wages may face costly consequences, including penalties for intentional acts to cover-up their violations.”
In fiscal year 2022, the division
recovered nearly $32.9 million in back wages for 17,127 construction industry workers. The division completed more than 2,200 investigations in FY22 in the construction industry and by wages recovered, the industry ranks second among the division’s low wage, high violation industries.
Read the court decisionRead the full story...Reprinted courtesy of
Bill Seeks to Protect Legitimate Contractors
December 20, 2012 —
CDJ STAFFThe California construction industry sees Senate Bill 863 as a needed help to legitimate construction businesses. The bill introduces regulations that will help shut down fraudulent contractors and help reduce workers’ compensation fraud. John Upshaw of the Independent Roofing Contractors of California described the revenue lost to California and other states as “phenomenal,” saying that “we need to continue the coordinated efforts if we are to see true workers’ compensation reform.”
Read the court decisionRead the full story...Reprinted courtesy of
Homebuilder Immunity Act Dies in Committee. What's Next?
May 07, 2015 —
Jesse Howard Witt – Acerbic WittFor the third straight year, the Colorado legislature has rejected efforts by the homebuilders’ lobby to provide virtual immunity for construction defects and property damage.
Late Monday night, the House committee on State, Military, and Veterans Affairs voted down Senate Bill 15-177 on straight party lines. All six Democrats on the committee voted against the bill, while all five Republicans voted for it. Similar bills had died in the Senate in 2013 and 2014.
In theory, SB177 would have boosted multifamily construction by shielding builders from liability for negligent work. Unlike the 2013 bill, this version never expressly stated that it was providing homebuilders with immunity, but it would have made it nearly impossible for community associations to take action against a builder who refused to honor a warranty. And even if the homeowners managed to overcome the procedural obstacles, the bill would have forced their claims into costly, private arbitration. Proponents hoped that, by eliminating responsibility for negligent work and property damage, they could entice homebuilders to construct more cheap condominiums.
Read the court decisionRead the full story...Reprinted courtesy of
Jesse Howard Witt, Acerbic WittMr. Witt welcomes comments at www.wittlawfirm.net