Slavin Doctrine and Defense from Patent Defects
June 13, 2018 —
David Adelstein - Florida Construction Legal UpdatesThe Slavin doctrine is an affirmative defense primarily geared to the personal injury context designed to protect contractors from third-party negligence-type claims when an owner accepts a patent defect.
The Slavin doctrine protects contractors from liability for injuries to third parties by presuming that the owner has made a “reasonably careful inspection” of the contractor’s work prior to accepting it as completed; if the owner accepts the contractor’s work as complete and an alleged defect is patent, then the owner “accepts the defects and the negligence that caused them as his own,” and the contractor will no longer be liable for the patent defect.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Florida Construction Legal UpdatesMr. Adelstein may be contacted at
dadelstein@gmail.com
Subcontractor Allowed to Sue Designer for Negligence: California Courts Chip Away at the Economic Loss Doctrine (Independent Duty Rule)
August 30, 2017 —
John P. Ahlers - Ahlers & Cressman PLLCAn architect may have to pay over $1 million to a subcontractor who was contractually obligated to rely on the designer’s plans – even though the architect was not a party to the contract.[1] That was the ruling in U.S. f/u/b/o Penn Air Control, Inc. v. Bilbro Constr. Co., Inc.[2]
The dispute involved a $7.3 million design-build contract award to Bilbro Construction (“Bilbro”) to renovate a facility for the Naval Facilities Engineering Command in Monterey, California. Bilbro hired an architect (“FPBA”) to serve as the designer of record and provide all the architectural design services. FPBA’s design team included an acoustical sub-consultant (Sparling). The general contractor (design builder) also retained Alpha Mechanical (Alpha) as the mechanical electrical and plumbing (“MEP”) design/build subcontractor. Alpha, in turn, subcontracted the MEP design to Shadpour Consulting Engineers. During the design phase of this project, Alpha’s MEP design was reviewed by FPBA, Bilbro, and Sparling at the 35, 75, and 100 percent design completion levels. Alpha demonstrated that it regularly received direct communications during design development from Sparling and FPBA, including comments, changes, and revisions. One example Alpha cited was it raised some concerns about anticipated noise level in eight rooms. Sparling made several recommendations to Alpha and Shadpour that were implemented.
Read the court decisionRead the full story...Reprinted courtesy of
John P. Ahlers, Ahlers & Cressman PLLCMr. Ahlers may be contacted at
jahlers@ac-lawyers.com
Coverage Doomed for Failing Obtain Insurer's Consent for Settlement
January 22, 2014 —
Tred R. Eyerly – Insurance Law HawaiiThe Fourth Circuit affirmed the district court's determination that there was no duty to indemnify after the insured settled without consent of the insurer. Perini/Tompkins Joint Venture v. ACE American Ins. Co., 2013 U.S. App. LEXIS 24865 (4th Cir. Dec. 16, 2013).
The insured, a joint venture, was hired as manager for the construction of a $900 million hotel and convention center. OCIP and excess policies were obtained through ACE. The project was also insured by a Builders Risk Policy through Factory Mutual Insurance Company.
During construction, a rod eroded, causing the atrium to collapse. Substantial property damage occurred and the completion of the project was delayed for several months.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Big League Dreams a Nightmare for Town
April 03, 2013 —
CDJ STAFFThe town of Gilbert, Arizona had their own big dreams for Big League Dreams Gilbert, which the town was convinced would bring in financial benefits. Now the amateur sports complex is plagued by defects and failing infrastructure. The town was wondering how to create sufficient recreation facilities when Big League Dreams made a proposal that would bring tax revenue from a new stadium complex.
Ten years later, Gilbert says it’s not getting enough of the revenue from the parks. The proposal, created by Big League Dreams, estimated an economic benefit of $40 million over 30 years with a construction cost of $22.7 million. Instead, construction ran to $42.7 million and over the last two years the town has received only $250,570.
Then there are the construction defects. The structure was warranteed for only one year. That warrantee long over, the complex has problems with various concrete surfaces and has generated injury claims. The town did not inspect the park after Big League Dreams started operating it. They later found out that some parts did not conform to code, with 39 problem areas referenced in a report. Some of these included safety issues like missing handrails.
Read the court decisionRead the full story...Reprinted courtesy of
White and Williams Announces Lawyer Promotions
January 15, 2019 —
White and Williams LLPWhite and Williams is pleased to announce the election of Siobhan Cole, Matthew Ferrie, Joshua Galante, Rochelle Gumapac, Geoffrey Sasso and Benjamin Staherski to the partnership. The firm has also promoted Brandon Arber, Adam Berardi, Kevin Koscil and Greg Steinberg from associate to counsel.
The newly elected partners and promoted counsel represent the wide array of practices that White and Williams offers its clients, including commercial and general litigation, corporate and securities, insurance coverage, product liability, subrogation and tax. These accomplished lawyers have earned this advancement based on their contributions to the firm and their practices.
“We are delighted to elect these six lawyers to the partnership and promote four exceptional associates to counsel. The group demonstrates the breadth of services and the deep bench that we offer to our clients at White and Williams," said Patti Santelle, Managing Partner of the firm. “The contributions of this talented group have enhanced the growth and reputation of our firm and reflect our deep commitment to our clients. We look forward to their continued success.”
Read the court decisionRead the full story...Reprinted courtesy of
White and Williams LLP
Quick Note: Aim to Avoid a Stay to your Miller Act Payment Bond Claim
February 23, 2017 —
David Adelstein – Florida Construction Legal UpdatesStrategy is important. This is especially true if you are trying to avoid arbitration. In a recent federal district court case, a subcontractor sued the prime contractor and the Miller Act payment bond surety. The subcontractor, however, had an arbitration provision in its subcontract with the prime contractor. The prime contractor moved to compel arbitration pursuant to the subcontract and moved to stay the subcontractor’s Miller Act payment bond claim. The last thing, and I mean the last thing, the subcontractor wanted to do was to stay its claim against the Miller Act payment bond. However, the district court compelled the subcontractor’s claim against the prime contractor to arbitration and stayed the subcontractor’s Miller Act payment bond claim pending the outcome of the arbitration. See U.S. v. International Fidelity Ins. Co., 2017 WL 495614 (S.D.Al. 2017). This is not what the subcontractor wanted.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Florida Construction Legal UpdatesMr. Adelstein may be contacted at
dadelstein@gmail.com
Who Will Pay for San Francisco's $750 Million Tilting Tower?
February 02, 2017 —
James Tarmy & Kartikay Mehrotra – BloombergNina Agabian, a retired director of research in global health science at the University of California, bought a 29th-floor apartment in San Francisco’s Millennium Tower in 2010. “It was supposed to be a wonderful building,” she said in January, sitting in a leather chair in the building’s vast, low-lit, owner's-club level. “For many of us, who left our business lives to start our older years, this had become a nice, comfortable place.”
The building, which opened in 2008 and was touted as the most luxurious tower in San Francisco, became a beacon of the city’s burgeoning wealth, attracting tech millionaires, venture capitalists, and even the San Francisco 49ers retired quarterback Joe Montana.
The 58-story tower's shine faded on May 10, 2016, when Agabian attended a homeowners association meeting and was informed that the building had sunk 16 inches into the earth and tilted over 15 inches at its tip and 2 inches at the base, according to suits filed by residents and the city of San Francisco. “You can imagine how distressed we were to know that, for one, our lifetime investment and savings are at risk,” she said. “And we have no idea whether or not there’s a fix to it, and if there is a fix to it, what it will entail.”
Reprinted courtesy of
James Tarmy, Bloomberg and
Kartikay Mehrotra, Bloomberg
Mr. Tarmy may be followed on Twitter @jstarmy
Mr. Mehrotra may be followed on Twitter @kartikaym
Read the court decisionRead the full story...Reprinted courtesy of
'Perfect Storm' Caused Fractures at San Francisco Transit Hub
January 08, 2019 —
Nadine M. Post - Engineering News-RecordThe underlying causes of the trouble at San Francisco’s 4.5-block-long Salesforce Transit Center are coming into focus. A combination of low fracture toughness deep inside thick steel plates, cracks present as a consequence of normal steel fabrication and stress levels from loads, which are a function of design, apparently caused brittle fractures in the bottom flanges of the center's twin built-up plate girders that span 80 ft across Fremont Street.
Read the court decisionRead the full story...Reprinted courtesy of
Nadine M. Post, ENRMs. Post may be contacted at
postn@enr.com