Neighbor Allowed to Remove Tree Roots on Her Property That Supported Adjoining Landowners’ Two Large Trees With Legal Immunity
July 14, 2016 —
Paul R. Cressman, Jr. – Ahlers & Cressman PLLC BlogA recent Washington Court of Appeals opinion addressed the rights of a neighbor to destroy roots and branches on her property that belonged to trees located on an adjoining landowner’s property.[1]
Mustoe had two large Douglas-fir trees located entirely on her property, about two and one-half feet from the property line with her neighbor Ma. Ma caused a ditch to be dug on her property along the border with Mustoe’s lot. The ditch was 18-20 inches deep. In the process, Ma exposed and removed the trees’ roots, leaving them to extend only three-four feet from the trunks of the trees. This resulted in a loss of nearly half of the trees’ roots, all from the south side, exposing them to southerly winds with no support. The damaged trees posed a high risk of falling on Mustoe’s home. The landscape value of the trees was estimated to be $16,418. The cost of their removal was estimated to be $3,913.
Mustoe filed suit against Ma asserting that Ma had negligently, recklessly, and intentionally excavated and damaged her trees, along with other property, and also sought emotional distress damages. The trial court dismissed Mustoe’s suit. The Court of Appeals affirmed.
Read the court decisionRead the full story...Reprinted courtesy of
Paul R. Cressman, Jr., Ahlers & Cressman PLLC Mr. Cressman may be contacted at
pcressman@ac-lawyers.com
Pennsylvania Court Finds that Two Possible Causes Can Prove a Product Malfunction Theory of Liability
September 29, 2021 —
Gus Sara - The Subrogation StrategistIn Allstate Ins. Co. v. LG Elecs. USA, Inc., No. 19-3529, 2021 U.S. Dist. LEXIS 127014, the United States District Court for the Eastern District of Pennsylvania considered whether plaintiff’s expert engineer’s opinion that there were two possible causes of a fire—both related to alleged product defects within a refrigerator manufactured by the defendant—was sufficient to support the malfunction theory of products liability. The court found that because both potential causes imposed liability on the product manufacturer and the expert ruled out misuse of the product, as well as all external causes of the fire, it was not necessary for the engineer to identify a specific cause under the malfunction theory. The court also found that the expert’s investigation and opinions met the criteria set forth in Daubert v. Merrell Dow Pharms., Inc., 509 U.S. 579 (1993) and the Federal Rules of Evidence and, thus, were admissible.
LG Electronics arose from a fire at the home of Thomas and Lisa Ellis. The public sector fire investigator identified the area of fire origin as the top of a refrigerator manufactured by LG Electronics USA, Inc. (LG). The Ellises filed a claim with their homeowner’s insurance carrier, Allstate Insurance Company (Insurer). Insurer retained a fire investigator and an electrical engineer to investigate the origin and cause of the fire. The fire investigator agreed with the public sector investigator that the fire originated at the top of the refrigerator. The engineer conducted a forensic inspection of the scene and ruled out all potential external ignition sources. He then examined the internal components of the refrigerator. He found arcing activity on a wire at the front top of the refrigerator. He opined that there were two possible causes of the fire: either the heater circuit insulation failed over time due to mechanical damage, or the heat from the internal light fixture ignited combustible components of the refrigerator. Since the engineer ruled out improper use of the refrigerator, he opined that the damage was caused by a manufacturing defect.
Read the court decisionRead the full story...Reprinted courtesy of
Gus Sara, White and WilliamsMr. Sara may be contacted at
sarag@whiteandwilliams.com
The Contractor’s Contingency: What Contractors and Construction Managers Need to Know and Be Wary Of
December 04, 2023 —
Skyler L. Santomartino - Peckar & Abramson, P.C.Contractors and construction managers who enter into cost reimbursable contracts subject to a guaranteed maximum price (GMP) are responsible for all project costs exceeding the GMP. For this reason, it is imperative that contractors negotiate and incorporate into the GMP a financial buffer that accounts for the unanticipated project costs that are not reimbursable as change orders or costs of the work. This is where the contractor’s contingency comes into play.[
1]
The contractor’s contingency is a vehicle that allows contractors to mitigate some of the risks inherent in GMP contracts. When drafted properly, a contingency clause allows the contractor and only the contractor to access funds set aside by the owner to address unpredictable or unknown project costs.
Read the court decisionRead the full story...Reprinted courtesy of
Skyler L. Santomartino, Peckar & Abramson, P.C.Mr. Santomartino may be contacted at
ssantomartino@pecklaw.com
Bert L. Howe & Associates Brings Professional Development Series to Their San Antonio Office
March 28, 2014 —
Beverley BevenFlorez-CDJ STAFFMirroring similar seminars currently provided in other regional markets, BHA’s Professional Development Series provides seminar attendees with a heightened level of knowledge and understanding on a wide range of subjects covering construction and construction defect litigation, tailored to the unique needs of local counsel and insureds.
The first seminar in this series will be presented on May 9th, and is entitled THE RESIDENTIAL CONSTRUCTION PROCESS & CONSTRUCTION DEFECT LITIGATION.
This course has been approved for Minimum Continuing Legal Education credit by the State Bar of Texas Committee on MCLE in the amount of 1.0 credit hours, of which 0.0 credit hours will apply to legal ethics/professional responsibility credit.
The seminar will be presented by Don MacGregor, general contractor and project manager, at BHA’s San Antonio office during the noontime hour, and luncheon will be provided. As with all BHA Professional Development activities, there is no cost for participation.
Water intrusion through doors, windows and roofing systems, as well as soil and foundation-related movement, and the resultant damage associated therewith, are the triggering effects for the vast majority of homeowner complaints today and serve as the basis for most residential construction defect litigation.
The graphic and animation-supported workshop/lecture activity will focus on the residential construction process from site preparation through occupancy, an examination of associated damages most often encountered when investigating construction defect claims, and the inter-relationships between the developer, general contractor, sub trades and design professionals.
Typical plaintiff homeowner/HOA expert allegations will be examined in connection with those building components most frequently associated with construction defect and claims litigation.
The workshop will examine:
* Typical construction materials, and terminology associated with residential construction
* The installation process and sequencing of major construction elements, including interrelationship with other building assemblies
* The parties (subcontractors) typically associated with major construction assemblies and components
* The various ASTM standard testing protocols utilized to field test buildings
* An analysis of exposure/allocation to responsible parties
Attendance at THE RESIDENTIAL CONSTRUCTION PROCESS & CONSTRUCTION DEFECT LITIGATION seminar will provide the attendee with:
* A greater understanding of the terms and conditions encountered when dealing with common construction defect issues
* A greater understanding of contractual scopes of work encountered when reviewing construction contract documents
* The ability to identify, both quickly and accurately, potentially responsible parties
* An understanding of damages most often associated with construction defects, as well as a greater ability to identify conditions triggering coverage
* Assistance in the satisfaction of important continuing education requirements.
Course #: 901290467 / Sponsor #: 14152
To register for the event, please email Don MacGregor at dmac@berthowe.com.
Read the court decisionRead the full story...Reprinted courtesy of
Engineer at Flint Negligence Trial Details Government Water Errors
April 04, 2022 —
Richard Korman & Jeff Yoders - Engineering News-RecordWarren Green, vice president and chief engineer of Lockwood, Andrews & Newnam, an engineering consultant to Flint, Mich. during its disastrous water crisis of 2014 and 2015, testified in federal court last week that city officials forged ahead to switch its source of drinking water without adequate water softening or testing after one municipal manager assured him that the more extensive testing would be done.
Reprinted courtesy of
Richard Korman, Engineering News-Record and
Jeff Yoders, Engineering News-Record
Mr. Korman may be contacted at kormanr@enr.com
Mr. Yoders may be contacted at yodersj@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Noteworthy Construction Defect Cases for 1st Qtr 2014
April 30, 2014 —
Beverley BevenFlorez-CDJ STAFFJohn A. Husmann and Jocelyn F. Cornbleet of BatesCareyLLP analyzed several noteworthy construction defect cases that have already occurred in 2014, as published in Law360. The cases involved “the ‘occurrence’ requirement, contractual liability exclusion and ‘other insurance’ clauses.” Husmann and Cornbleet summarized Owners Insurance Co. v Jim Carr Homebuilder LLC (Alabama), Pennsylvania National Mutual Casualty Insurance Co. v. Snider (also Alabama), Woodward LLC v. Acceptance Indemnification Insurance Co. (Mississippi), and others.
Read the court decisionRead the full story...Reprinted courtesy of
Make Your Business Great Again: Steven Cvitanovic Authors Construction Today Article
April 20, 2017 —
Steven M. Cvitanovic - Haight Brown & Bonesteel LLPThere is a lot of uncertainty regarding how President Trump’s immigration and trade policies will affect the construction industry. In his Construction Today article, Partner Steven Cvitanovic discusses how businesses can remain competitive and profitable during this period of uncertainty, including updating contract documents, recruiting and retaining employees, and increasing cybersecurity efforts.
“If you do not know when your contract documents were last updated, it’s probably been too long,” writes Cvitanovic. “Unlike wine, contract documents only get worse with age.” Cvitanovic advises teams to sit down together and review contracts to see if they still meet the firm’s needs.
Read the court decisionRead the full story...Reprinted courtesy of
Steven M. Cvitanovic, Haight Brown & Bonesteel LLPMr. Cvitanovic may be contacted at
scvitanovic@hbblaw.com
Is Your Contract “Mission Essential?” Recovering Costs for Performing During a Force Majeure Event Under Federal Regulations
May 10, 2022 —
Joneis M. Phan & Sarah K. Bloom - ConsensusDocsFederal contractors have faced unprecedented challenges performing during the COVID-19 pandemic. Additional costs have included delays and inefficiencies, site closures, quarantines, unavailability of supplies and materials, and full shutdowns of subcontractor operations. For contractors performing under fixed price contracts, the cost impact of COVID-19 was likely severe.
The Federal Acquisition Regulation (“FAR”) recognizes “epidemics” as a force majeure event that may excuse non-performance. Many federal contracts include some version of the Default clause, which prevents the government from terminating a contractor for default due to impacts of force majeure events that are beyond a contractor’s control, such as an epidemic. See, e.g., FAR 52.249-10. See also Pernix Serka Joint Venture v. Dep’t of State, CBCA No. 5683 (Apr. 20. 2020). The Default clause, however, operates as a shield from liability, not a sword authorizing recovery. Contractors are now left wondering whether any avenue exists to recover additional costs incurred after performing in the face of the COVID-19 pandemic.
In response to a likely influx of claims and requests for equitable adjustment due to COVID-19 impacts, the federal government largely took the position that contractors were entitled to extensions of time, but not to additional costs. This article explores the avenues that may be available for contractors to recover costs for performing during a force majeure event that would otherwise be non-compensable.
Reprinted courtesy of
Joneis M. Phan, Watt, Tieder, Hoffar, & Fitzgerald, LLP (ConsensusDocs and
Sarah K. Bloom, Watt, Tieder, Hoffar, & Fitzgerald, LLP (ConsensusDocs).
Mr. Phan may be contacted at jphan@watttieder.com
Ms. Bloom may be contacted at sbloom@watttieder.com
Read the court decisionRead the full story...Reprinted courtesy of