Is the Removal and Replacement of Nonconforming Work Economically Wasteful?
September 19, 2022 —
David Adelstein - Florida Construction Legal UpdatesThere are times a contractor installs the wrong material or system contrary to the plans and specifications. A nonconformity. The owner wants the already-installed material or system to be replaced in conformity with the plans and specifications. However, what was installed is functionally equivalent to what the plans and specifications required and would be cost prohibitive, i.e., economically wasteful. If the contractor elects to remove and replace the nonconforming work, it may seek a change order because it is economically wasteful. Or, the contractor may refuse (typically, not the best approach) in furtherance of taking on the fight based on the economic wastefulness associated with the removal and replacement. A recent case, David Boland, Inc. v. U.S., 2022 WL 3440349 (Fed.Cl. 2022), talks about this exaction situation and the economic waste doctrine. This is an important doctrine for contractors to understand when faced with a similar predicament.
Here, a contractor was hired by the government to construct a wastewater collection system that was to be owned and operated by a private company. The contractor’s work was going to be incorporated into a larger sewer system that the private company already operated. The contractor was required to install sewer manholes reinforced with steel in accordance with an ASTM standard. The manholes could be rejected if they did not conform to the ASTM standard. Compliance with this ASTM standard was also required by the private company’s construction protocol for the infrastructure, which was incorporated into the contractor’s contract with the government. The contractor was required to strictly comply with the contract.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Eighth Circuit Rejects Retroactive Application of Construction Defect Legislation
September 17, 2014 —
Tred R. Eyerly – Insurance Law HawaiiThe Eighth Circuit refused to retroactively apply an Arkansas statute establishing coverage for faulty workmanship. J-McDaniel Const. Co., Inc. v. Mid-Continent Cas. Co., 2014 U.S. App. LEXIS 14911 (8th Cir. Aug. 4, 2014).
The homeowners sued J-McDaniel for faulty workmanship in constructing their home. The defective construction work was performed by subcontractors. Mid-Continent refused to defend or indemnify J-McDaniel.
The insured sued Mid-Continent. The district court dismissed the claim pursuant to Essex Ins. Co. v. Holder, 261 S.W. 3d 456, 460 (Ark. 2008). In Essex, the Arkansas Supreme Court held that defective workmanship resulting in damages only to the work product itself was not an occurrence. Although The Arkansas legislature overruled Essex by statute, the district court found that the Arkansas case law barred retroactive application of the statute.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Wilke Fleury Attorneys Featured in 2022 Northern California Super Lawyers and Rising Stars Lists
September 05, 2022 —
Wilke Fleury LLPWilke Fleury is extremely proud that 14 of its incredibly talented attorneys are featured in the Annual List of Top Attorneys in the 2022 Northern California Super Lawyers magazine! Super Lawyers rates attorneys in each state using a patented selection process and publishes a yearly magazine issue that produces award-winning features on selected attorneys. Congratulations to this talented group:
Read the court decisionRead the full story...Reprinted courtesy of
Wilke Fleury LLP
First Circuit Rejects Insurer’s “Insupportable” Duty-to-Cooperate Defense in Arson Coverage Suit
October 24, 2023 —
Geoffrey B. Fehling & Yaniel Abreu - Hunton Insurance Recovery BlogIn
Philadelphia Indemnity Insurance Co. v. BAS Holding Corp., the Court of Appeals for the First Circuit rejected an insurer’s “insupportable” defense that the insured company had breached its duty to cooperate by refusing the insurer’s request for an examination under oath of the company’s president. The decision is a reminder that, while examinations under oath can be effective tools to allow the insurer to properly investigate a claim, an insured’s duty to cooperate is not boundless and does not demand attendance at examinations that are not reasonably requested.
Background
BAS Holding involves the destruction of a landmark building in Boston by an arsonist. The owner, BAS Holding Corporation, submitted an insurance claim to its property insurer to recover insurance proceeds for the damage to the building. The insurer investigated the claim to determine whether the damage to the building was covered and issued a reservation of rights letter suggesting that the policy may not provide coverage for the fire. As part of its investigation, the insurer requested an examination under oath as a condition to coverage under the policy, which led to BAS presenting the property’s operations coordinator for an interview. Shortly after examining the operations coordinator, the insurer sought another examination of BAS’s president and owner, as well as five other employees. In response, BAS questioned whether the additional examinations were “reasonably required” and said that it would consider the requests if the insurer could explain why they were necessary.
Reprinted courtesy of
Geoffrey B. Fehling, Hunton Andrews Kurth and
Yaniel Abreu, Hunton Andrews Kurth
Mr. Fehling may be contacted at gfehling@HuntonAK.com
Mr. Abreu may be contacted at yabreu@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
Federal Lawsuit Accuses MOX Contractors of Fraud
March 04, 2019 —
Scott Judy - Engineering News-RecordA subcontractor employee working on the now-canceled MOX project in South Carolina used football tickets, automobile tires, barbecue grills and other gifts to persuade employees of CB&I AREVA MOX Services and other vendors to help approve thousands of fraudulent invoices cumulatively valued at more than $6.4 million, according to a Dept. of Justice lawsuit filed Feb. 14 that names both companies as defendants. The controversial project at the Savannah River Site in Aiken, S.C., originally scheduled for completion in 2016, was canceled in January after cost and schedule estimates increased significantly.
Read the court decisionRead the full story...Reprinted courtesy of
Scott Judy, ENRMr. Judy may be contacted at
judys@enr.com
Lawyer Claims HOA Scam Mastermind Bribed Politicians
June 28, 2013 —
CDJ STAFFThe lawyer defending one of the accused in the Las Vegas HOA scam is now claiming that the FBI investigated bribery of public officials. Chris Rasmussen represents Edith Gillespie, the half-sister of Leon Benzer. Benzer has been accused of being one of the masterminds behind the scheme to pack homeowner boards with members who would make construction defect settlements that were beneficial to the scam’s participants. Rasmussen is trying to get his client tried separately from her half-brother.
Rasmussen did not name any public officials. The Justice Department did not comment on his claims.
Read the court decisionRead the full story...Reprinted courtesy of
Online Meetings & Privacy in Today’s WFH Environment
May 25, 2020 —
Heather Whitehead & Joshua Anderson - Newmeyer DillionAs a result of the COVID-19 (commonly referred to as the Coronavirus) pandemic, remote working arrangements have become the new norm. For those working from home (WFH), the software program “Zoom Meetings,” has found a substantial increase in demand and popularity as a means to facilitate meetings online rather than meeting in person. There are also a number of other similar platforms available for online meetings such as Skype and Teams (from Microsoft), Go to Meeting (from LogMeIn) and WebEx Meetings (Cisco).
Best Practices for Businesses - Privacy and Security Protocols
With these platforms becoming a necessity for businesses, there are a number of best practices that should be considered to safely conduct online meetings and teleconferences as well as protect information. These include the following:
- Upgrade to the most recent version of the program or application;
- Use passwords, especially with recurring meetings;
- Protect all passwords as well as personal meeting identifiers used in Zoom and other platforms;
- Carefully moderate meetings and ask meeting attendees to identify themselves at the beginning of a meeting;
- Consider allowing only authenticated users to participate in meetings;
- Use the Waiting Rooms feature in Zoom; and
- Enable features available only to meeting hosts.
Reprinted courtesy of
Heather Whitehead, Newmeyer Dillion and
Joshua Anderson, Newmeyer Dillion
Ms. Whitehead may be contacted at heather.whitehead@ndlf.com
Mr. Anderson may be contacted at joshua.anderson@ndlf.com
Read the court decisionRead the full story...Reprinted courtesy of
Summary Findings of the Fourth National Climate Assessment
January 02, 2019 —
Anthony B. Cavender - Gravel2GavelOn November 23, the latest National Climate Assessment, Fourth National Climate Assessment (NCA4), was released by the U.S. Global Research Program, as required by the Clean Air Act. The Assessment, comprising three volumes and 1600 pages, contains some rather bleak findings which the Report usefully summarizes. Here’s a description of these findings.
1.
Communities. The report states that “climate change creates new risks and exacerbates existing vulnerabilities in communities across the United States.” In particular, “more frequent and intense extreme weather and climate-related events” will continue to damage infrastructure , ecosystems and social systems. However, “global action” to significantly cut greenhouse gas emissions can substantially reduce these risks.
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com