David M. McLain – Colorado Construction LitigationStarting in 2009, the Colorado Legislature began adding requirements that builders offer certain options to accommodate high-efficiency devices. These requirements started with solar prewire options in 2009, then water-smart home options in 2010. In 2020, the Legislature added requirements for electric vehicle charging and heating systems. These sections apply to unoccupied homes serving as sales inventory or a model home or manufactured homes, as defined by Colorado law. While the Legislature has only required builders to include options to accommodate these devices, it may be just a matter of time until builders must install the prescribed devices themselves.
In 2009, the Legislature passed C.R.S. 38-35.7-106, which was amended this year by HB 20-1155. As it now reads, Colorado law requires every builder of single-family detached residences to offer to have the home’s electrical or plumbing system, or both, include:
- A residential photovoltaic solar generation system or a residential thermal system, or both;
- Upgrades of wiring or plumbing, or both, planned by the builder to accommodate future installation of such systems; and
- A chase or conduit, or both, constructed to allow ease of future installation of the necessary wiring or plumbing for such systems.
Read the court decisionRead the full story...Reprinted courtesy of
David McLain, Higgins, Hopkins, McLain & RoswellMr. McLain may be contacted at
mclain@hhmrlaw.com
The Advantages of Virtual Reality in Construction
August 20, 2019 —
Spivey Lipsey - Construction ExecutiveVirtual realty provides an unparalleled spatial sense for visualization at a lower cost than full-scale replicas. Today, VR is being used heavily in preconstruction to align owner expectations and educate design team stakeholders. For those already employing BIM solutions, coordination can be made much more effective by leveraging existing design models with very little added cost.
As anyone who has tried a VR headset before can attest, the ability to accurately perceive spatial relationships in design cannot be replicated through traditional 2D media such as screens or paper. VR solutions also have the ability to iterate rapidly. These technologies are linked to BIM, providing real-time feedback as the design changes. This is in stark contrast to traditional full-scale mockups and offline renders, which are cumbersome and time-consuming to update with design changes.
Substantial benefits without a hefty price tag
Budget limitations and ROI are always a concern with emerging technology. Fortunately, VR comes cheaply with BIM production. These solutions are significantly less expensive than full-scale mockups and far more efficient when compared to longhand sequencing explanations and esoteric detailing of complex designs. Even the most elaborate VR setups are a fraction of overall construction cost, ranging from a few hundred to a few thousand dollars depending on the level of adoption.
Reprinted courtesy of
Spivey Lipsey, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Want to Build Affordable Housing in the Heart of Paris? Make It Chic.
November 01, 2022 —
Marie Patino & Kriston Capps - BloombergThe project at 12 Rue Jean-Bart is a modest one, just eight units of affordable housing on a narrow lot in Paris near the Luxembourg Gardens. The social housing project nevertheless caused a stir with neighbors in the 6th arrondissement, one of the city’s more affluent areas.
When local politicians backing the project came to visit the building during its construction, neighbors shouted from windows across the street that it was a shame to build social housing here, according to Jean-Christophe Quinton, the Paris-based architect who designed the small in-fill development.
Local resistance was a persistent feature of the project throughout its three-year-long construction, Quinton says; the building regularly faced harsh scrutiny in local newspaper Le Parisien.
Reprinted courtesy of
Marie Patino, Bloomberg and
Kriston Capps, Bloomberg Read the court decisionRead the full story...Reprinted courtesy of
DOI Aims to Modernize its “Inefficient and Inflexible” Type A Natural Resource Damages Assessment Regulations
March 25, 2024 —
Amanda G. Halter, Jillian Marullo & Ashleigh Myers - Gravel2Gavel Construction & Real Estate Law BlogThe U.S. Department of the Interior (DOI) published a
proposed rule aimed at modernizing and streamlining the “Type A” Natural Resource Damage Assessment (NRDA) regulations under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Clean Water Act (CWA). (The comment deadline was later
extended.) The revisions,
first previewed in a January 2023 Advanced Notice of Proposed Rulemaking (ANPR), are intended to fulfill “the original statutory purpose of providing a streamlined and simplified assessment process” with the overarching goal of facilitating settlements and expediting restoration efforts following injury resulting from pollution in a broader range of cases.
The NRDA regulations provide two paths to assessing natural resource damages (NRD): (1) the more complex, site-specific Type B procedures for detailed NRDAs and (2) what is intended to be the standard, simplified Type A assessment procedures requiring minimal field observation. Particularly, the Type A process is reserved for two specific aquatic environments (coastal and marine areas or Great Lakes environments) when a relatively minor release of a single hazardous substance occurs, resulting in a smaller scale and scope of natural resource injury, and the rebuttal presumption for the Type A procedure is limited to damages of $100,000 or less under the current version of the rule.
Reprinted courtesy of
Amanda G. Halter, Pillsbury,
Jillian Marullo, Pillsbury and
Ashleigh Myers, Pillsbury
Ms. Halter may be contacted at amanda.halter@pillsburylaw.com
Ms. Marullo may be contacted at jillian.marullo@pillsburylaw.com
Ms. Myers may be contacted at ashleigh.myers@pillsburylaw.com
Read the court decisionRead the full story...Reprinted courtesy of
The Woodland Hills Office Secures a Total Defense Award on Behalf of their High-End Custom Home Builder Client!
June 04, 2024 —
Dolores Montoya - Bremer Whyte Brown & O'Meara LLPPartner Daniel Crespo and Associate Theresa Mallen secured a total defense award in arbitration. Our client is a high-end custom home builder with a decades-long flawless record of museum quality construction. Our client was accused of performing substandard construction and the homeowners asserted a multiple million-dollar cost of repair. We took a zero-liability position and argued that the alleged defects were not defects at all but were rather mere reflections of an incomplete project. In sum, our client was forced to terminate the contract and cease construction due to the homeowners’ failure to make progress payments as they became due. The arbitration endured 16 days of testimony scattered over the course of 7 months.
Ultimately, the arbitrator ruled that there were no construction defects at the project and that the homeowners “shall take nothing.” The arbitrator also ruled in favor of our client on its affirmative claim for monies owed by the homeowners’ breach of contract plus interest. A total victory for our client.
Read the court decisionRead the full story...Reprinted courtesy of
Dolores Montoya, Bremer Whyte Brown & O'Meara LLP
Insurer Must Cover Portions of Arbitration Award
October 14, 2019 —
Tred R. Eyerly - Insurance Law HawaiiThe court determined that there was coverage in a construction defect case for portions of an arbitration award. Liberty Surplus Ins. Corp. v. Century Sur. Co., 2019 U.S. DIst. LEXIS 116093 (S.D. Texas July 12, 2019).
Descon Construction contracted with the City of Edinburg, Texas, to build a library. Descon subcontracted with McAllen Steel Erectors to install the library metal roof. The roof began to leak within two months of occupancy. The leaks continued for seven years.
Edinburg sued Descon. The matter was arbitrated. The arbitration panel found that the library roof was defective, the exterior stucco system was defectively installed and certain work, including fire-caulking, had not been performed. The panel concluded that Descon was liable for breach of contract and breach of warranty. The panel determined that Edinburg was entitled to replacement of the existing roof. Further, McAllen was found to have breached its subcontract with Descon by defectively installing the roof, entitling Descon to recover $762,537 from McAllen.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Fence Attached to Building Covered Under Dwelling Provisions
March 01, 2017 —
Tred R. Eyerly – Insurance Law HawaiiThe Texas Supreme Court determined that a damaged fence attached to the insureds' dwelling was covered under the dwelling provisions, not the "other structure" portion of the policy. Nassar v. Liberty Mutual Fire Ins. Co., 2017 Tex. LEXIS 113 (Tex. Jan. 27 ,2017).
The insureds' owned six acres of property. Hurricane Ike caused significant damage to the property on September 13, 2008. The insureds submitted a claim to Liberty Mutual under their homeowners' policy. Liberty Mutual paid several claims, but disputes arose over the value of various items of damaged property, including the fencing on the property. The insured's fencing spanned over 4,000 linear feet, including a white picket fence at the northeast corner of the dwelling, an ornamental iron fence in front of the dwelling, numerous cross fences, garden fences, and a larger, perimeter fence.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Arbitrator May Use Own Discretion in Consolidating Construction Defect Cases
September 01, 2011 —
CDJ STAFFThe Mississippi Court of Appeals has ruled in the case of Harry Baker Smith Architects II, PLLC v. Sea Breeze I, LLC. Sea Breeze contracted with Harry Baker Smith Architects II, PLLC (HBSA) to design a condominium complex, which would be built by Roy Anderson Corporation. All parties agreed to arbitration.
Subsequently, Sea Breeze alleged defects and sought arbitration against the architectural firm and started a separate arbitration proceeding against the contractor. The special arbitrator appointed by the American Arbitrators Association determined that it would be proper to consolidate the two actions “since they arose from a common question of fact or law.” HBSA filed in chancery court seeking injunctive relief and a reversal of the decision. Sea Breeze and Roy Anderson filed a motion to compel the consolidated arbitration.
The court noted that the special arbitrator “established that the contract between Sea Breeze and Roy Anderson expressly allowed for consolidation of the two cases.” Further, the arbitrator “concluded that HBSA expressly agreed to consolidation by written consent through its 2008 letter, through which it insisted upon Roy Anderson’s involvement ‘in any mediation and/or arbitration.’”
The court concluded that the chancery court “did not have the power to fulfill HBSA’s request.” The court affirmed the chancery court’s judgment.