Design-Assist Collaboration/Follow-up Post
March 16, 2020 —
John P. Ahlers - Ahlers Cressman & Sleight PLLCShortly after posting the blog article “Design-Assist an Ambiguous Term Causing Conflict in the Construction Industry,” I received an email from Brian Perlberg, the Executive Director and Senior Counsel for ConsensusDocs. He brought two ConsensusDocs forms to my attention: ConsensusDocs 541 Design Assist Addendum and ConsensusDocs 300 Integrated Form of Agreement (IFOA). In the ConsensusDocs model of “design-assist,” the lead design professional retains design responsibility but benefits from input and consultation from the construction team during design development. By contrast, in the design-build project delivery method, the constructor assumes design responsibility and liability for either the entire project design (design-build) or just a component of the design (delegated design).
The ConsensusDocs 541 document goal is to provide “accurate information concerning program, quality, cost, constructability and schedule from all parties.” It provides a range of standard and optimal services during design development that essentially shifts the curve of selecting the construction manager (CM) and most importantly, special trade contractors, to much earlier in the process, perhaps as soon as the owner’s program is developed. This opens a world of possibilities for the design and construction team to collaborate early and often. The design professional, however, does not abdicate its design responsibility or authority in this process. The ultimate goal is to end the all-too-common wasteful cycle of design and redesign that is common in construction projects.[1]
Read the court decisionRead the full story...Reprinted courtesy of
John P. Ahlers, Ahlers Cressman & Sleight PLLCMr. Ahlers may be contacted at
john.ahlers@acslawyers.com
COVID-19 Response: Key Legal Considerations for Event Cancellations
March 30, 2020 —
Michael G. Platner, Solomon B. Zoberman, & Jane C. Luxton - Lewis BrisboisEvery passing day brings stark new reports of novel coronavirus (COVID-19) cases and increasing numbers of cancelled conventions, concerts, and other major events. Both the hospitality and travel industry on the one hand, and organizations that are canceling events on the other, are scrambling to understand the legal consequences of these costly terminations. Cancellation fees can be breathtaking, and affected parties are quickly learning that there are no simple answers as to whether a disease outbreak of this scope and scale falls within force majeure (or Act of God) clauses that either do not explicitly list, or arguably may never have contemplated, circumstances of this type.
Generally, force majeure clauses excuse parties’ performance under a contract when circumstances that are beyond their control arise and prevent them from fulfilling their obligations. The party electing to enforce its rights under the force majeure clause must show that the triggering event qualifies as a force majeure event, and that the event has rendered the party’s performance impossible or impracticable.
Reprinted courtesy of Lewis Brisbois attorneys
Michael G. Platner,
Solomon B. Zoberman and
Jane C. Luxton
Mr. Platner may be contacted at Michael.Platner@lewisbrisbois.com
Mr. Zoberman may be contacted at Solomon.Zoberman@lewisbrisbois.com
Ms. Luxton may be contacted at Jane.Luxton@lewisbrisbois.com
Read the court decisionRead the full story...Reprinted courtesy of
Corps Spells Out Billions in Infrastructure Act Allocations
February 14, 2022 —
Tom Ichniowski - Engineering News-RecordThe Army Corps of Engineers has
released a detailed project-by-project breakdown outlining how it plans to spend the 2022 portion of the $17.1-billion infusion provided for its civil works program in the Infrastructure Investment and Jobs Act (IIJA).
Reprinted courtesy of
Tom Ichniowski, Engineering News-Record
Mr. Ichniowski may be contacted at ichniowskit@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Tesla’s Solar Roof Pricing Is Cheap Enough to Catch Fire
May 10, 2017 —
Tom Randall - BloombergTesla Inc. has begun taking orders for its remarkable solar roof tiles to be delivered by summer at a price point that could be transformative for the U.S. solar market.
Tesla will begin with production of two of the four styles of solar tile unveiled in October: a smooth glass and a textured glass version. The Tuscan and French slate tiles will be available by the end of this year. Roofing a 2,000 square-foot home in New York state—with 40 percent coverage of active solar tiles and battery backup for night-time use—would cost about $50,000 after federal tax credits and generate $64,000 in energy over 30 years, according to Tesla.
The warranty is for the lifetime of your house.
Read the court decisionRead the full story...Reprinted courtesy of
Tom Randall, Bloomberg
In Phoenix, Crews Thread Needle With $730M Broadway Curve Revamp
July 31, 2024 —
Scott Blair - Engineering News-RecordMotorists scrambling to dart across three lanes of traffic when merging onto the freeway. Vehicles slowing to a crawl due to extremely curved exit ramps. Commuters enduring agonizing backups as three freeways converge in a tight footprint. Bicyclists and pedestrians sweating through long detours to traverse freeways.
Reprinted courtesy of
Scott Blair, Engineering News-Record
Mr. Blair may be contacted at blairs@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Are Construction Defect Laws Inhibiting the Development of Attached Ownership Housing in Colorado?
October 29, 2014 —
James M. Mulligan, Esq. – Snell & Wilmer, LLPThis article responds to the article published in the September 18, 2014 issue of the Construction Defect Journal. It provides a different perspective to this issue, based on the author's experience with these matters during the past decade of attention to this specific challenge.
During recent years, there has been much discussion about the lack of attached ownership housing construction in Colorado. The main culprit, according to several sources within the community, seems to be our state's construction defect laws.
Since 2001, there has been a periodic series of legislative fixes to our construction defect laws that saw the pendulum swing back and forth between the interests of the consuming public who purchase the homes and certain protections of the developers and homebuilders from excessive and unnecessary litigation. Some say that the current state of the law is more onerous than necessary on the developers and homebuilders and it is artificially inhibiting the development of multifamily ownership housing in a time of high demand and low supply.
A recent opinion article in the September 29th, 2014 issue of the Denver Post stated, in part:
"No one is suggesting that developers escape liability for construction defects or that homeowners be denied the right to sue. But under the state's current defect laws, the scales have tilted too far in favor of litigation as the default tool for resolving disputes. And this appears to be the biggest reason for the collapse in the number of new multifamily [ownership] dwellings in recent years."
Rather than the typical conflict between the plaintiffs’ bar (representing the homebuyer) and the homebuilding industry that has produced the "back-and-forth" nature of our construction defect laws in the past, this 2014 legislative session found new constituents and a different perspective on the issue. A broad ranging coalition that included the Metro Mayors Caucus, major segments of the affordable housing community, and the general business community came together to address what their research showed as an astonishing lack of construction of ownership attached housing. There was a continuing boom going on in the development of multifamily "rental" housing, but an even more unusual deficit in multifamily "ownership" housing. Research apparently showed that, although about 20% + of construction of attached housing was in the ownership format throughout the Rocky Mountain West, Colorado was only producing about 2%. Interviews conducted by the research group that was retained by this coalition revealed that the development and homebuilding community were not willing to commence construction of ownership attached housing because of the continuing threat of litigation available under current interpretations of our state's construction defect laws. Lenders were also reluctant to provide financing for such projects faced with the apparent real threat of litigation that could shut down their projects and materially impact their loan viability and the value of the loan's collateral. Moreover, insurance premiums to cover such claims were so high, and many times unavailable, as to make such projects unfeasible.
This lack of available multifamily ownership housing was creating an ever-increasing concern over the resulting imbalance of housing options in and around the metro area, where the urban character of the metro region would need such ownership options in the attached housing format in order to address the more dense character of the urban setting. This imbalance of ownership attached housing was thwarting the advancement of "community" in the context of creating opportunities for all options of housing so important for a community balance. This included ownership options in this format that address the need for the younger professionals entering the workforce, newly forming households, seniors desiring to scale down their housing size and location, as well as the segment of the market who have limited means and need to address the affordability of homeownership. This was being most clearly felt along the FasTracks lines where attached ownership housing was an important element in originally advancing the TOD communities that are expected to be developed around these transit stops.
Rather than engage the battle of creating more contention in the various aspect of construction defect legislation per se, this coalition attempted to temper their approach and address specific issues that seemed to advance protection of the consuming homeowner while, at the same time, advocating a method of dispute resolution encouraged in the state's laws regarding such issues.
Normally, attached ownership housing is developed under our state laws governing the creation of Common Interest Communities ("CIC's"), including those communities where there are units that are attached and contain common elements. These CIC's will be encumbered by certain recorded documents (normally referred to as "Declarations") that structure the "community" within which the units are located and set up certain rules and restrictions that are intended to respect the common interests of the unit owners within that community. There is also a Homeowners Association ("HOA") organized for the common interest community that is charged with the management of the common elements and the enforcement of the rule and regulations governing the community.
The coalition chose to address their concerns through a bill including a couple of changes in the state laws governing CIC's, which would provide further protection to the homeowner and advance alternative dispute resolution as an expedient approach to resolving disputes should they arise. Those changes included:
1. Majority Owner Vote Re: Litigation -Rather than allowing two owners plus a vote of the HOA Board to determine whether or not to file litigation alleging construction defects in a CIC, the proposed change would require a simple majority vote of the unit owners who are members in the respective HOA where the alleged defect occurred. This approach addressed the increasing concern of unit owners whose homes are unmarketable and not financeable during the course of any such litigation.
This does not prevent an aggrieved owner from pursuing claims regarding that person's own unit, it just requires a majority of the owners to vote for litigation that affects the entire CIC in such litigation. This approach also included a provision for advance notice to the owners of such pending litigation accompanied by several disclosures regarding the potential litigation and its potential impact on the respective owner. This approach to protecting the rights of homeowners in a CIC seemed to be in line with everyone's interests, while not preventing an individual consumer/unit owner to advance its own claims.
2. Alternative Dispute Resolution -This proposal clarified the stated intent of the CIC statutes that advances alternative dispute resolution by providing that any mandatory arbitration provisions that are already contained in the Declaration that encumbers the respective unit in a CIC shall not be changed or deleted without the permission of the Declarant (e.g.; the developer of the CIC). This provision was to affirm a provision that the purchasing unit owner was aware of at the time of purchase and that it follows the spirit and intent of the state statutes governing such CIC's.
Notwithstanding the curative nature of these proposals, the legislation did not address the issue because a legislative maneuver was employed that did not allow for its consideration during the waning days of the session.
More recently, one of Colorado's municipalities, the home rule city of Lakewood, passed a local ordinance addressing this issue in a similar fashion, with a few more definitive suggestions regarding how to alleviate the lopsided nature of our current state of law. Without going into detail at this time with that specific ordinance, or the issue of its ability to address matters of a state-wide concern at the local level, the point is that several of Colorado's local communities, frustrated with the inability of the state legislature to deal with the issue are, at the very least, sending a signal that something must be done and, if the state is unwilling to lead on this matter, local communities will have to act.
This issue has not receded into the back room, and we will see a continuing crusade from an updated coalition to address these reasonable modifications to our state laws that will at least provide some protections to the CIC homeowner regarding unwanted litigation and some relief to the homebuilding industry from excessive litigation.
James M. Mulligan is a partner in the Denver office of Snell & Wilmer, LLP, a full-service commercial law firm located in nine cities throughout the Western United States and in Mexico. The firm’s website is http://www.swlaw.com.
Read the court decisionRead the full story...Reprinted courtesy of
Insureds' Summary Judgment Motion on Mold Limitation Denied
November 10, 2016 —
Tred R. Eyerly – Insurance Law HawaiiThe insureds' motion for partial summary judgment on the applicability of the homeowner's mold limitation was denied. R.W.& R. v. Liberty Mutual Fire Ins. Co., 2016 U.S.Dist. LEXIS 131586 (W.D. Wash. Sept. 26, 2016).
The policy imposed a $5,000 limit on losses caused by mold. Plaintiffs discovered that their dishwasher was leaking and reported the loss to Liberty. Liberty's contractor concluded that the bottom of the dishwasher had rusted out, causing water to seep into parts of the kitchen and the laundry/utility room below. The contractor used dehumidifiers to extract moisture from the affected areas and removed damaged cabinetry, drywall and tiling. The contractor discovered mold that it believed predated the dishwasher leak. Although the contractor took steps to remove the mold, its dehumidification efforts exacerbated the problem by dispersing mold spores throughout portions of the house.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
California Bullet Train Clears Federal Environmental Approval
June 30, 2014 —
Michael B. Marois – BloombergThe U.S. Federal Railroad Administration has approved an environmental review needed to begin building a portion of a $68 billion California high-speed rail line that has been mired in lawsuits.
The agency, part of the Transportation Department, said in a release that it cleared a 114-mile (183-kilometer) stretch of the project in the Central Valley.
The California High-Speed Rail Authority has been blocked from selling bonds to begin construction of the first U.S. bullet train until a court decides whether details of the financing were adequately disclosed.
Read the court decisionRead the full story...Reprinted courtesy of
Michael B. Marois, BloombergMr. Marois may be contacted at
mmarois@bloomberg.net