Not So Universal Design Fails (guest post)
April 28, 2016 —
Melissa Dewey Brumback – Construction Law in North CarolinaToday we have a guest post from Carla Williams, who works in customer service for the
Williams Brothers Corporation of America. Carla humorously brings light to a serious problem– the intent behind ADA and Universal Design is very often not met with poorly-thought out applications in the real world. Enjoy, and feel free to leave a comment for Carla below.
Universal design is the idea that architecture should be inherently accessible to everyone. The growing number of architects adopting universal design is great news for people with accessibility needs. Instead of having separate entrances and walkways to make a building accessible, universal design allows people of all abilities to move together.
Unfortunately, many buildings are stuck back in 1990 right after the Americans with Disabilities Act was made law. These buildings may be technically “accessible,” but they aren’t spaces people with accessibility needs can maneuver very easily. Until all building designers come to understand and implement the beauty and functionality of universal design, the world is left with less than ideal accessibility. “Less than ideal” is a bit of an understatement. Many times full-on “accessibility fails” take place.
Read the court decisionRead the full story...Reprinted courtesy of
Melissa Dewey Brumback, Ragsdale Liggett PLLCMs. Brumback may be contacted at
mbrumback@rl-law.com
Nevada’s Home Building Industry can Breathe Easier: No Action on SB250 Leaves Current Attorney’s Fees Provision Intact
June 21, 2017 —
Aaron Lovaas – Newmeyer & Dillion LLPConstruction and design professionals in Nevada’s home building industry breathed a collective sigh of relief on June 5, 2017 when the 79th Session of the Nevada Legislature adjourned without entertaining Senate Bill 250, which sought to reinstate homeowner plaintiffs’ nearly automatic right to recover attorneys’ fees, expert costs, and costs of investigation when bringing suit for alleged constructional defects.
Until 2015, homeowners’ recovery of such damages was the reality of the construction defect landscape in Nevada. While Chapter 40 of the Nevada Revised Statutes specifically allowed for recovery of “reasonable” attorneys’ fees, expert costs, and costs of investigation, the trend in Nevada was that plaintiffs were all but guaranteed awards of all such sums. Of course, this environment incentivized plaintiffs’ lawyers to bring claims of questionable or little repair value in cases where the attorney’s fees and expert costs often far exceeded the costs of repair.
HOW AB125 CHANGED THE LANDSCAPE
Such was the reality in Nevada until 2015 and the passage of Assembly Bill 125, which eliminated the nearly automatic award of attorneys’ fees and expert costs and overhauled Chapter 40 in many other respects. AB125 made over portions of Chapter 40 by:
- Placing awards of attorneys’ fees into the framework of offers of judgment, utilized extensively in other fields of civil litigation and available equally to homeowner plaintiffs as well as construction industry defendants; and
- Reworking expert costs and costs of investigation to allow for the award of those items only in the case of proven defects and only as to those costs directly related to the investigation and proof of those defects.
INTRODUCING SB250
The 2017 Legislative Session saw efforts to return Chapter 40 to its pre-2015 version through the introduction of SB250. Fortunately for construction and design professionals in the home building industry in Nevada, the State Senate Judiciary Committee did not act upon the bill and the effort died having never made it to a floor vote. Considering that Nevada’s Legislature meets biannually, the current framework of Chapter 40 is intact until at least 2019. The 2017 Legislative Session, however, is an illustration to how quickly those of the construction defect plaintiffs’ bar can move to initiate efforts to turn back the clock to a much riskier time for construction and design professionals.
Those in the industry should remain vigilant and monitor future legislative efforts to reinstate such awards or other clearly anti-builder measures. Such measures simply drive-up the overall cost and expense of home construction and, in turn, home ownership, which it is often said, is one of the cornerstones of the American dream.
Aaron Lovaas is a partner in the Las Vegas office of Newmeyer & Dillion. As a transactional attorney and business litigator, Aaron has the ability to evaluate legal issues from both points of view and help his clients understand their best option. He can be reached at aaron.lovaas@ndlf.com.
About Newmeyer & Dillion
For more than 30 years, Newmeyer & Dillion has delivered creative and outstanding legal solutions and trial results for a wide array of clients. With over 70 attorneys practicing in all aspects of business, employment, real estate, construction and insurance law, Newmeyer & Dillion delivers legal services tailored to meet each client’s needs. Headquartered in Newport Beach, California, with offices in Walnut Creek, California and Las Vegas, Nevada, Newmeyer & Dillion attorneys are recognized by The Best Lawyers in America©, and Super Lawyers as top tier and some of the best lawyers in California, and have been given Martindale-Hubbell Peer Review's AV Preeminent® highest rating. For additional information, call 949-854-7000 or visit www.ndlf.com.
Read the court decisionRead the full story...Reprinted courtesy of
The Pitfalls of Oral Agreements in the Construction Industry
June 28, 2021 —
Matthew A. Margolis - Construction ExecutiveToo often, construction professionals engage with each other to handle a project or series of projects and instead of memorializing their terms in writing, the agreement between the parties consists of nothing more than a conversation and a handshake. Both parties put their trust in each other that the terms they discussed will be honored. Nevertheless, one (or both) of the parties may eventually determine that their trust was misplaced, resulting in a big-money, big-headache dispute.
By having a written contract at the commencement of their relationship, these issues could have been avoided. Here are nine reasons to have a written contract.
Reprinted courtesy of
Matthew A. Margolis, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Mr. Margolis may be contacted at
mmargolis@sbwh.law
Maximizing Contractual Indemnity Rights: Components of an Effective Provision
December 02, 2015 —
William Kennedy – White and Williams LLPTort law is aimed at providing compensation to the victims of negligence. Tort law encourages plaintiffs to cast a wide net, pursuing claims or suits against not only those whose fault seems manifestly primary, but also against defendants whose causal exposure is minimal, against those whose exposure is purely by operation of law. As discussed in the first installment of this series, "Maximizing Contractual Indemnity: Problems with Common Law," three common law principles – vicarious liability, joint and several liability, and common law indemnity – cause some parties to pay in excess of their actual degree of causal fault. Contractual indemnity can remedy that harsh result.
Part Two: Components of an Effective Provision
Properly composed, “broad form” contractual indemnity provisions permit an Indemnitee to shift the full range of financial consequences from tort exposure, including civil damages, defense fees, expert fees, and litigation expenses. Such contracts permit indemnity even where the underlying damage was incurred due to a degree of negligence or fault on the part of the Indemnitee. Such contracts can also allow an Indemnitee to shift to the Indemnitor the risk of loss for someone from whom the Indemnitor would otherwise be immune from suit (e.g., the Indemnitor’s employees). A well-written contract can even convert an entity which is an Indemnitor as to one party (e.g., a general contractor which has to indemnify a property owner) into an Indemnitee as to another party (e.g., a subcontractor) for the very same risk.
Read the court decisionRead the full story...Reprinted courtesy of
William Kennedy, White and Williams LLPMr. Kennedy may be contacted at
kennedyw@whiteandwilliams.com
Duty to Defend Negligent Misrepresentation Claim
April 15, 2014 —
Tred R. Eyerly – Insurance Law HawaiiThe Kansas Court of Appeals determined that the insurer must defend claims of negligent misrepresentation against its insured. Central Power Sys. & Servs. v. Universal Underwriters Ins. Co., 2014 Kan. App. LEXIS 9 (Kan. Ct. App. Feb. 21, 2014).
Central Power contracted to furnish Eagle Well with 10 oil-rig engines and 10 oil-rig transmissions. Eagle Well alleged that Central Power informed them that the engines and transmissions would be operational without any additional components. As is turned out, the engines could not operate without a wiring harness. Eagle Well had to hire a third party to make wiring harnesses that would meet their needs and to install the wiring harnesses.
Eagle Wells sued Central Power, alleging damages in the form of lost profits for the time it took to make the engines independently operational. Further, damages were incurred due to money needed for the costs of purchasing the wiring harnesses from the third party and attaching the harnesses to the engines. Claims asserted against Central Power included breach of contract, negligence and negligent misrepresentation.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Not Our Territory: 11th Circuit Dismisses Hurricane Damage Appraisal Order for Lack of Jurisdiction
July 24, 2023 —
Veronica P. Adams & Koorosh Talieh - Hunton Insurance Recovery BlogThe hurdles policyholders have faced with the appraisal process in Florida are far from over. In the past, many Florida courts have limited the scope for appraisal, strictly construing the policy provision against the policyholder. Yet, recently, in
Positano Place at Naples I Condominium Association, Inc., et al. v. Empire Indemnity Insurance Company, the Eleventh Circuit dismissed an insurer’s appeal of the district court’s ruling compelling appraisal and a stay of a pending litigation.
In Positano Place at Naples I Condominium Association, Inc., et al. v. Empire Indemnity Insurance Company, the policyholder Positano filed a claim for property insurance benefits under the policy as a result of damage to the property from Hurricane Irma in 2017. After investigating the claim, Empire found that there was damage to only three of the five properties covered under the policy and disputed the amount of loss.
Reprinted courtesy of
Veronica P. Adams, Hunton Andrews Kurth and
Koorosh Talieh, Hunton Andrews Kurth
Ms. Adams may be contacted at vadams@HuntonAK.com
Mr. Talieh may be contacted at ktalieh@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
Small to Midsize Builders Making Profit on Overlooked Lots
March 26, 2014 —
Beverley BevenFlorez-CDJ STAFFTeresa Burney and John Caulfield writing in Big Builder discussed how many small to mid-size firms are making profits off of lots overlooked by the big building firms. They stated that “builders are scouring the country for land to meet the new housing demand, and they are having trouble finding good lots in the right place at the right price. This is particularly true for small to mid-size builders.”
While the number of finished lots may be up, Burney and Caulfield declared that “the numbers are deceptive because roughly 25 percent of them are in what Metrostudy, BUILDER’s research company, describes as ‘D’ and ‘F’ locations—places so undesirable that nobody wants to live there.”
Strategies that builders have tried with success, according to Big Builder, include looking for older communities that local builders have forgotten, or choosing a lot that needs more work than most builders would want to deal with. “We are kind of a savior for developers with troublesome leftover lots,” William H. Hoover, president of Texas-based Inland Homes, told Big Builder. “You have got some ugly lots, let us come and finish out your community.”
Read the court decisionRead the full story...Reprinted courtesy of
Forethought Is Key to Overcoming Construction Calamities
February 10, 2020 —
Mitch Cohen - Construction ExecutiveWithout warning, an under-construction structure in the southern United States suffered a catastrophic collapse. The tragedy resulted in the death of several people. As a result, engineering and construction post-collapse forensics experts engaged in an 18-month investigation.
Those involved in the design and build project included the general contractor hired by the owner, a prime engineer, a consulting peer-review engineer and a prime structural design firm supported by a sub-consulting structural engineer. Although significant cracking was noticed several weeks before the failure, no one sounded the alarm or deemed the cracking worthy of corrective action.
In their findings, forensic experts found the collapse resulted from the combined failure of the general contractor, engineers and even the owner, who all failed to shut down the work once the cracking reached unacceptable levels and/or take the appropriate actions needed to secure the public safety and mitigate the risk. This was even after the general contractor requested that the engineer-of-record and design manager assess the structure’s extreme cracking. Consequently, the choice to not seriously investigate the crack or seek an independent peer review to design a rectification plan contributed directly to the tragedy. This is typically referred to within the industry as a “negligent professional design error.”
Reprinted courtesy of
Mitch Cohen, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Mr. Cohen may be contacted at