    housing building expert Seattle Washington custom homes building expert Seattle Washington parking structure building expert Seattle Washington production housing building expert Seattle Washington tract home building expert Seattle Washington concrete tilt-up building expert Seattle Washington retail construction building expert Seattle Washington casino resort building expert Seattle Washington industrial building building expert Seattle Washington custom home building expert Seattle Washington low-income housing building expert Seattle Washington condominium building expert Seattle Washington Medical building building expert Seattle Washington high-rise construction building expert Seattle Washington hospital construction building expert Seattle Washington townhome construction building expert Seattle Washington condominiums building expert Seattle Washington institutional building building expert Seattle Washington mid-rise construction building expert Seattle Washington multi family housing building expert Seattle Washington Subterranean parking building expert Seattle Washington office building building expert Seattle Washington
    Seattle Washington defective construction expertSeattle Washington expert witness concrete failureSeattle Washington construction scheduling and change order evaluation expert witnessSeattle Washington expert witnesses fenestrationSeattle Washington expert witness commercial buildingsSeattle Washington concrete expert witnessSeattle Washington consulting architect expert witness
    Arrange No Cost Consultation
    Building Expert Builders Information
    Seattle, Washington

    Washington Builders Right To Repair Current Law Summary:

    Current Law Summary: (SB 5536) The legislature passed a contractor protection bill that reduces contractors' exposure to lawsuits to six years from 12, and gives builders seven "affirmative defenses" to counter defect complaints from homeowners. Claimant must provide notice no later than 45 days before filing action; within 21 days of notice of claim, "construction professional" must serve response; claimant must accept or reject inspection proposal or settlement offer within 30 days; within 14 days following inspection, construction pro must serve written offer to remedy/compromise/settle; claimant can reject all offers; statutes of limitations are tolled until 60 days after period of time during which filing of action is barred under section 3 of the act. This law applies to single-family dwellings and condos.


    Building Expert Contractors Licensing
    Guidelines Seattle Washington

    A license is required for plumbing, and electrical trades. Businesses must register with the Secretary of State.


    Building Expert Contractors Building Industry
    Association Directory
    MBuilders Association of King & Snohomish Counties
    Local # 4955
    335 116th Ave SE
    Bellevue, WA 98004

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of Kitsap County
    Local # 4944
    5251 Auto Ctr Way
    Bremerton, WA 98312

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of Spokane
    Local # 4966
    5813 E 4th Ave Ste 201
    Spokane, WA 99212

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of North Central
    Local # 4957
    PO Box 2065
    Wenatchee, WA 98801

    Seattle Washington Building Expert 10/ 10

    MBuilders Association of Pierce County
    Local # 4977
    PO Box 1913 Suite 301
    Tacoma, WA 98401

    Seattle Washington Building Expert 10/ 10

    North Peninsula Builders Association
    Local # 4927
    PO Box 748
    Port Angeles, WA 98362
    Seattle Washington Building Expert 10/ 10

    Jefferson County Home Builders Association
    Local # 4947
    PO Box 1399
    Port Hadlock, WA 98339

    Seattle Washington Building Expert 10/ 10


    Building Expert News and Information
    For Seattle Washington


    Aecmaster’s Digital Twin: A New Era for Building Design

    New Change Order Bill Becomes Law: RCW 39.04.360

    Wendel Rosen Construction Attorneys Recognized by Super Lawyers

    Construction Delays: Which Method Should Be Used to Calculate Delay?

    Alabama Federal Magistrate Recommends Dismissal of Construction Defect Declaratory Judgment Action Due to Expanded Duty to Defend Standard

    Architects and Engineers Added to Harmon Towers Lawsuit

    Are Construction Defect Laws a Factor in Millennials Home Buying Decisions?

    Evacuations in Santa Barbara County as more Mudslides are Predicted

    Home Buyers Lose as U.S. Bond Rally Skips Mortgage Rates

    Claim for Consequential Damages Survives Motion to Dismiss

    Construction Up in Northern Ohio

    Taking Care of Infrastructure – Interview with Marilyn Grabowski

    California Supreme Court Adopts “Vertical Exhaustion” in the Long-Storied Montrose Environmental Coverage Litigation

    Don’t Miss the 2015 West Coast Casualty Construction Defect Seminar

    Endorsement to Insurance Policy Controls

    Distressed Home Sales Shrinking

    Contractor Removed from Site for Lack of Insurance

    Flood Coverage Denied Based on Failure to Submit Proof of Loss

    Boston’s Tunnel Project Plagued by Water

    NYC Rail Tunnel Cost Jumps and Construction Start Pushed Back

    Heathrow Speeds New-Runway Spending Before Construction Approval

    Recommencing Construction on a Project due to a Cessation or Abandonment

    Bank Window Lawsuit Settles Quietly

    Flint Water Crisis Prompts Call for More Federal Oversight

    Wisconsin Court Applies the Economic Loss Doctrine to Bar Negligence Claims for Purely Economic Losses

    Fixing the Problem – Not the Blame

    Federal Defend Trade Secrets Act Enacted

    Appeals Court Rules that CGL Policy Doesn’t Cover Subcontractors’ Faulty Work

    GA Federal Court Holds That Jury, Not Judge, Generally Must Decide Whether Notice Was Given “As Soon as Practicable” Under First-Party Property Damage Policies

    The Preservation Maze

    Safety Accusations Fly in Dispute Between New York Developer and Contractor

    Break out the Neon: ‘80s Era Davis-Bacon “Prevailing Wage” Definition Restored in DOL Final Rule

    Is Arbitration Always the Answer?

    Federal Court Again Confirms No Coverage For Construction Defects in Hawaii

    CDJ’s #9 Topic of the Year: Nevada Supreme Court Denies Class Action Status in Construction Defect Case

    Congratulations to BWB&O’s Newport Beach Team for Prevailing on a Highly Contested Motion to Quash!

    Wake County Justice Center- a LEED Silver Project done right!

    Chicago Makes First Major Update to City's Building Code in 70 Years

    Do You Really Want Mandatory Arbitration in Your Construction Contract?

    Pennsylvania Modular Home Builder Buys Maine Firm

    Builders Association Seeks to Cut Down Grassroots Green Building Program (Guest Post)

    Does “Faulty Workmanship” Constitute An Occurrence Under Your CGL Policy?

    Construction Defect Lawsuit May Affect Home Financing

    Understanding Indiana’s New Home Construction Warranty Act

    Chesapeake Bay Water Quality Is Still in Trouble, Two Major Reviews Say

    U.K. High Court COVID-19 Victory for Policyholders May Set a Trend in the U.S.

    Ensuing Loss Provision Found Ambiguous

    A Guide to Evaluating Snow & Ice Cases

    Insurer's Appeal of Jury Verdict Rejected by Tenth Circuit

    Breath of Fresh Air
    Corporate Profile

    SEATTLE WASHINGTON BUILDING EXPERT
    DIRECTORY AND CAPABILITIES

    Leveraging from more than 7,000 construction defect and claims related expert witness designations, the Seattle, Washington Building Expert Group provides a wide range of trial support and consulting services to Seattle's most acknowledged construction practice groups, CGL carriers, builders, owners, and public agencies. Drawing from a diverse pool of construction and design professionals, BHA is able to simultaneously analyze complex claims from the perspective of design, engineering, cost, or standard of care.

    Building Expert News & Info
    Seattle, Washington

    Are Construction Defect Laws Inhibiting the Development of Attached Ownership Housing in Colorado?

    October 29, 2014 —
    This article responds to the article published in the September 18, 2014 issue of the Construction Defect Journal. It provides a different perspective to this issue, based on the author's experience with these matters during the past decade of attention to this specific challenge. During recent years, there has been much discussion about the lack of attached ownership housing construction in Colorado. The main culprit, according to several sources within the community, seems to be our state's construction defect laws. Since 2001, there has been a periodic series of legislative fixes to our construction defect laws that saw the pendulum swing back and forth between the interests of the consuming public who purchase the homes and certain protections of the developers and homebuilders from excessive and unnecessary litigation. Some say that the current state of the law is more onerous than necessary on the developers and homebuilders and it is artificially inhibiting the development of multifamily ownership housing in a time of high demand and low supply. A recent opinion article in the September 29th, 2014 issue of the Denver Post stated, in part:
    "No one is suggesting that developers escape liability for construction defects or that homeowners be denied the right to sue. But under the state's current defect laws, the scales have tilted too far in favor of litigation as the default tool for resolving disputes. And this appears to be the biggest reason for the collapse in the number of new multifamily [ownership] dwellings in recent years."
    Rather than the typical conflict between the plaintiffs’ bar (representing the homebuyer) and the homebuilding industry that has produced the "back-and-forth" nature of our construction defect laws in the past, this 2014 legislative session found new constituents and a different perspective on the issue. A broad ranging coalition that included the Metro Mayors Caucus, major segments of the affordable housing community, and the general business community came together to address what their research showed as an astonishing lack of construction of ownership attached housing. There was a continuing boom going on in the development of multifamily "rental" housing, but an even more unusual deficit in multifamily "ownership" housing. Research apparently showed that, although about 20% + of construction of attached housing was in the ownership format throughout the Rocky Mountain West, Colorado was only producing about 2%. Interviews conducted by the research group that was retained by this coalition revealed that the development and homebuilding community were not willing to commence construction of ownership attached housing because of the continuing threat of litigation available under current interpretations of our state's construction defect laws. Lenders were also reluctant to provide financing for such projects faced with the apparent real threat of litigation that could shut down their projects and materially impact their loan viability and the value of the loan's collateral. Moreover, insurance premiums to cover such claims were so high, and many times unavailable, as to make such projects unfeasible. This lack of available multifamily ownership housing was creating an ever-increasing concern over the resulting imbalance of housing options in and around the metro area, where the urban character of the metro region would need such ownership options in the attached housing format in order to address the more dense character of the urban setting. This imbalance of ownership attached housing was thwarting the advancement of "community" in the context of creating opportunities for all options of housing so important for a community balance. This included ownership options in this format that address the need for the younger professionals entering the workforce, newly forming households, seniors desiring to scale down their housing size and location, as well as the segment of the market who have limited means and need to address the affordability of homeownership. This was being most clearly felt along the FasTracks lines where attached ownership housing was an important element in originally advancing the TOD communities that are expected to be developed around these transit stops. Rather than engage the battle of creating more contention in the various aspect of construction defect legislation per se, this coalition attempted to temper their approach and address specific issues that seemed to advance protection of the consuming homeowner while, at the same time, advocating a method of dispute resolution encouraged in the state's laws regarding such issues. Normally, attached ownership housing is developed under our state laws governing the creation of Common Interest Communities ("CIC's"), including those communities where there are units that are attached and contain common elements. These CIC's will be encumbered by certain recorded documents (normally referred to as "Declarations") that structure the "community" within which the units are located and set up certain rules and restrictions that are intended to respect the common interests of the unit owners within that community. There is also a Homeowners Association ("HOA") organized for the common interest community that is charged with the management of the common elements and the enforcement of the rule and regulations governing the community. The coalition chose to address their concerns through a bill including a couple of changes in the state laws governing CIC's, which would provide further protection to the homeowner and advance alternative dispute resolution as an expedient approach to resolving disputes should they arise. Those changes included:
    1. Majority Owner Vote Re: Litigation -Rather than allowing two owners plus a vote of the HOA Board to determine whether or not to file litigation alleging construction defects in a CIC, the proposed change would require a simple majority vote of the unit owners who are members in the respective HOA where the alleged defect occurred. This approach addressed the increasing concern of unit owners whose homes are unmarketable and not financeable during the course of any such litigation. This does not prevent an aggrieved owner from pursuing claims regarding that person's own unit, it just requires a majority of the owners to vote for litigation that affects the entire CIC in such litigation. This approach also included a provision for advance notice to the owners of such pending litigation accompanied by several disclosures regarding the potential litigation and its potential impact on the respective owner. This approach to protecting the rights of homeowners in a CIC seemed to be in line with everyone's interests, while not preventing an individual consumer/unit owner to advance its own claims. 2. Alternative Dispute Resolution -This proposal clarified the stated intent of the CIC statutes that advances alternative dispute resolution by providing that any mandatory arbitration provisions that are already contained in the Declaration that encumbers the respective unit in a CIC shall not be changed or deleted without the permission of the Declarant (e.g.; the developer of the CIC). This provision was to affirm a provision that the purchasing unit owner was aware of at the time of purchase and that it follows the spirit and intent of the state statutes governing such CIC's.
    Notwithstanding the curative nature of these proposals, the legislation did not address the issue because a legislative maneuver was employed that did not allow for its consideration during the waning days of the session. More recently, one of Colorado's municipalities, the home rule city of Lakewood, passed a local ordinance addressing this issue in a similar fashion, with a few more definitive suggestions regarding how to alleviate the lopsided nature of our current state of law. Without going into detail at this time with that specific ordinance, or the issue of its ability to address matters of a state-wide concern at the local level, the point is that several of Colorado's local communities, frustrated with the inability of the state legislature to deal with the issue are, at the very least, sending a signal that something must be done and, if the state is unwilling to lead on this matter, local communities will have to act. This issue has not receded into the back room, and we will see a continuing crusade from an updated coalition to address these reasonable modifications to our state laws that will at least provide some protections to the CIC homeowner regarding unwanted litigation and some relief to the homebuilding industry from excessive litigation. James M. Mulligan is a partner in the Denver office of Snell & Wilmer, LLP, a full-service commercial law firm located in nine cities throughout the Western United States and in Mexico. The firm’s website is http://www.swlaw.com. Read the court decision
    Read the full story...
    Reprinted courtesy of

    Meet the Forum's ADR Neutrals: LESLIE KING O'NEAL

    January 29, 2024 —
    Company: JAMS Office Location: Orlando, FL Email: lkoneal1117@gmail.com Website: https://www.jamsadr.com/oneal/ Law School: University of Florida, J.D. (1977) Types of ADR services offered: Mediation, arbitration, neutral evaluation Geographic area served: Nationwide Q: Describe the path you took to becoming an ADR neutral. A: Florida was one of the first states to allow judges to send civil cases to mediation. When I was an advocate, nearly all my cases went to mediation at least once—sometimes more than once! I became a firm believer in the value of mediation and other ADR methods. I became a Florida certified circuit court mediator in 2021 and I joined JAMS in 2022, after retiring as in-house counsel with Brasfield & Gorrie, a large commercial general contractor. I am also an adjunct professor at Pepperdine Law School, teaching arbitration theory and practice in its master of dispute resolution and master of laws programs. Read the court decision
    Read the full story...
    Reprinted courtesy of Marissa L. Downs, Laurie & Brennan, LLP
    Ms. Downs may be contacted at mdowns@lauriebrennan.com

    Is Arbitration Always the Answer?

    April 20, 2016 —
    After a long (for me) hiatus due to Spring Break with my wonderful family followed by a crazy last two weeks for both personal and business reasons, I’m back and ready to muse again. This week’s “musings” concern a topic that arises often in construction contracts and construction dispute resolution. The topic? Arbitration. Why does this come up often? Because in many form contracts such as the AIA documents, as well as in many construction contracts that are more specifically tailored, mandatory arbitration is at least a choice if not the only method of dispute resolution. Read the court decision
    Read the full story...
    Reprinted courtesy of Christopher G. Hill, Law Office of Christopher G. Hill, PC
    Mr. Hill may be contacted at chrisghill@constructionlawva.com

    California Complex Civil Litigation Superior Court Panels

    December 31, 2014 —
    The Complex Civil Litigation Program is relatively new as it has only existed in California since 2000. Complex divisions dedicate courtrooms solely for litigation of complex civil cases that require exceptional judicial management including construction defects, antitrust, securities, toxic torts, mass torts, and class actions. Complex civil courtrooms help the trial court operate in a more efficient, expeditious, and effective manner. A complex court reduces costs for litigants by streamlining motion practice and expeditiously resolving discovery disputes. Not all counties have dedicated complex civil divisions. For those that do, each county has its own local rules, and some complex divisions have their own particular set of rules. The Judicial management of complex cases begins early, and is applied continuously and actively with the idea that final resolution be expedited as much as possible. In focusing on cooperation amongst the parties to achieve these goals, often requiring joint statements to the court and a prohibition on discovery motions until after the parties have formally metand- conferred on the issues. Moreover, complex cases are centralized and are assigned to one highly skilled Judge for all purposes. The first six California counties to create a Complex Civil division include Alameda, Contra Costa, Los Angeles, Orange, San Francisco, and Santa Clara. Riverside County Superior Court is the most recent California County to add a Complex division, effective January 2015. Riverside county Superior Court’s Complex department consists of ten civil judges, seven of which are in the main courthouse with Riverside. Riverside county expects to consolidate all complex civil litigation into one courtroom by January 2015. Riverside county Judge Sharon Waters state that "[i]t's been something that I personally have felt has been long overdue" and that "[t]he idea is that put it with one judge and let him or her develop the expertise." Judge Waters believes "[t]he potential value of establishing a complex litigation courtroom [is that] it allows the judge to focus on the cases full time."1 As of October 2014, Riverside county had about 450 to 500 pending cases designated as complex, over fifty percent (50%) of which involved construction defect matters. The sole Judge who will preside over the complex cases has not yet been named. 1 Jolly, Vik. "Riverside to Shift Complex Civil Cases to 1 Courtroom." Los Angeles Daily Journal (October 13, 2014) Reprinted courtesy of Chapman Glucksman Dean Roeb & Barger attorneys Richard H. Glucksman, Jon A. Turigliatto and David A. Napper Mr. Glucksman may be contacted at rglucksman@cgdrblaw.com; Mr. Turigliatto may be contacted at jturigliatto@cgdrblaw.com; and Mr. Napper may be contacted at dnapper@cgdrblaw.com Read the court decision
    Read the full story...
    Reprinted courtesy of

    Vertical vs. Horizontal Exhaustion – California Supreme Court Issues Ruling Favorable to Policyholders

    May 11, 2020 —
    For years, when faced with damage or injury spanning several policy periods, excess general liability insurers have argued that all potentially applicable underlying policies must be exhausted before the excess drops down to provide coverage (“horizontal exhaustion”). Insureds, on the other hand, insist that they are entitled to immediately access an excess policy for any given policy year, if that year’s underlying policy has exhausted (“vertical exhaustion”). Vertical exhaustion not only enables insureds to directly tap into the excess insurance for which they paid substantial premiums, but also enables the insured to moderate risk given that different lower level policies might (1) be needed for other claims, (2) have larger self-insured retentions, or (3) have other less favorable coverage provisions. Allowing an insured to proceed via vertical exhaustion would also eliminate the heavy administrative and logistical burden that could result from having to pursue and exhaust all underlying coverage on multi-year claims. In Montrose Chemical Corp. v. Superior Court, 2020 WL 1671560 (April 6, 2020), the California Supreme Court has come down in favor of policyholders and vertical exhaustion. The Montrose case involved contamination that allegedly occurred between 1947 and 1982 and different liability insurance towers (comprised of primary and excess layers) for each year. The insured, Montrose, maintained a tower of insurance coverage, year by year, and faced claims asserting damage that spanned several decades. Montrose sought coverage from excess insurers under a vertical exhaustion approach. Not surprisingly, Montrose’s excess insurers insisted that horizontal exclusion was required and that Montrose was required to exhausted all other policies with lower attachment points in every single involved policy period. The California Supreme Court ruled in Montrose’s favor, holding that the insured may insist upon full coverage from an excess insurer once the layer directly below it has exhausted. The Court reasoned that the burden of spreading the loss among insurers is one that is appropriately borne by insurers, not insureds. Reprinted courtesy of Alan H. Packer, Newmeyer Dillion and James S. Hultz, Newmeyer Dillion Mr. Packer may be contacted at alan.packer@ndlf.com Mr. Hultz may be contacted at james.hultz@ndlf.com Read the court decision
    Read the full story...
    Reprinted courtesy of

    Administration Launches 'Buy Clean' Construction Materials Push

    February 28, 2022 —
    The Biden administration is moving to put U.S. government purchasing power behind construction materials with lower embodied carbon emissions and pollutants, with the White House launching a “Buy Clean Task Force” on Feb. 15. as part of a slate of initiatives intended to decarbonize manufacturing while boosting the economy. Reprinted courtesy of James Leggate, Engineering News-Record Mr. Leggate may be contacted at leggatej@enr.com Read the full story... Read the court decision
    Read the full story...
    Reprinted courtesy of

    Miller Act and “Public Work of the Federal Government”

    March 01, 2017 —
    The Miller Act applies to the “construction, alteration, or repair of any public building or public work of the Federal Government.” 40 U.S.C. s. 3131. A recent opinion out of the Northern District of Oklahoma sheds light on what the Miller Act means regarding its application to any public work of the Federal Government. See U.S. v. Bronze Oak, LLC, 2017 WL 190099 (N.D.Ok. 2017). If the project is not a public works project of the Federal Government, the Miller Act does not apply. In this case, the Department of Transportation entered into an agreement with the Cherokee Nation where the Department would provide lump sum funding and the Nation would use the money to fund transportation projects. Based on the federal funding, the Nation issued a bid for a transportation project in Mayes County, Oklahoma and the project was awarded to a prime contractor. The prime contractor provided a payment bond that identified the United States as the obligee (as a Miller Act payment is required to do) and stated that it was issued per the Miller Act. Thereafter, the Nation and Mayes County, Oklahoma entered into a Memorandum of Understanding where the County would assume responsibility for the construction and maintenance of the project and the Nation would pay the County an agreed amount upon the completion of the project. Read the court decision
    Read the full story...
    Reprinted courtesy of David Adelstein, Florida Construction Legal Updates
    Mr. Adelstein may be contacted at dadelstein@gmail.com

    Be Sure to Bring Up Any Mechanic’s Lien Defenses Early and Often

    November 27, 2023 —
    As those of you who regularly read Musings are aware, mechanic’s liens are a big part of my law practice and a big issue here at this construction law blog. I’ve discussed the picky requirements of the mechanic’s lien statutes in Virginia and how the 90 and 150-day rules are strictly enforced. However, a recent case out of the City of Norfolk Virginia Circuit Court cautions that while failure to meet these strict requirements may invalidate a lien, it only does so if the owner or general contractor seeking to invalidate the lien argues the invalidity and/or presents evidence of that invalidity either pretrial or during trial. In Premier Restoration LLC v. Barnes, the Court considered the following facts. The defendant homeowners had a house fire and the resulting damage was the subject of an insurance claim that was paid and checks sent to the homeowners. Premier filed a mechanic’s lien in response to Barnes’s failure to pay for Premier’s restoration construction services after Barnes’s home was destroyed by fire. Premier seeks a decree to enforce the lien, asking the court to order the sale of Barnes’s property to recover its damages or, alternatively, a judgment in its favor. With the Complaint seeking enforcement of the lien and damages for breach of contract, and this is a key point, Premier provided a copy of the mechanic’s lien along with the affidavit that is part of the statutory form swearing that the Owner was justly indebted to Premiere. The homeowners filed a counterclaim for unfinished work, including unfinished punch list work. After a trial during which no evidence regarding either the timeliness of the lien recording or whether any of the work sought to be encompassed in the lien was performed outside of the statutory 150-day window was presented by either side, the defendants filed a post-trial motion seeking to invalidate the lien as including sums for work outside of the 150-day window. Read the court decision
    Read the full story...
    Reprinted courtesy of The Law Office of Christopher G. Hill
    Mr. Hill may be contacted at chrisghill@constructionlawva.com