Receiving a $0 Verdict and Still Being Deemed the Prevailing Party for Purposes of Attorney’s Fees
May 24, 2018 —
David Adelstein - Florida Construction Legal UpdatesLow and behold, a party can be the prevailing party for purposes of attorney’s fees even if that party is awarded $0. That’s right, even if the party is awarded a big fat zero, they can still be the prevailing party for purposes of being entitled to attorney’s fees. This is because a party is the prevailing party if they prevail on the significant issues in the case. A party can prevail on the significant issues even if that party is awarded $0. Whoa!
For example, in Coconut Key Homeowner’s Association, Inc. v. Gonzalez, 43 Fla.L.Weekly D1045a (Fla. 4th DCA 2018), a homeowner sued her homeowner’s association claiming the association breached its governing documents. There was a basis for fees under Florida’s homeowner’s association law (and there likely was a basis under the governing documents). At trial, the jury held that the association breached its governing documents, but awarded the homeowner nothing ($0). The trial court also issued injunctive relief in favor of the homeowner. The homeowner claimed she should be deemed the prevailing party for purposes of attorney’s fees; however, this was denied by the trial court based on the $0 verdict and no fees were awarded to the homeowner.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Florida Construction Legal UpdatesMr. Adelstein may be contacted at
dadelstein@gmail.com
How to Cool Down Parks in Hot Cities
July 08, 2024 —
Todd Woody - BloombergThe drive to be outside, even in hot weather, is hard to overcome. People without air conditioning would be more likely to seek relief at their local park, according to Elie Bou-Zeid, a professor of civil and environmental engineering at Princeton, than at a government building where they can feel like climate refugees. “It’ll certainly be more pleasant to be in a park than in some indoor stadium where nobody wants to go,” he says. The scientists are combining inexpensive technologies, some novel, some already in use, that they plan to test first in New Jersey for deployment in hot spots like Phoenix.
Kirigami
The art of cutting and folding paper, kirigami is inspiring researchers to design structures that control wind in specific ways. A kirigami structure made from fabric and placed over misters could regulate wind speed to maximize cooling. Or it could form the roof of a pavilion, steering air into the structure.
Misters
They spray small water droplets that quickly evaporate, cooling the air. But the effectiveness of misters, which have long been used in cities such as Las Vegas and Phoenix, depends on wind speed. If there’s too little wind, the droplets won’t all evaporate; too much wind and the cooling effects dissipate.
Read the court decisionRead the full story...Reprinted courtesy of
Todd Woody, Bloomberg
Hawaii Court Looks at Changes to Construction Defect Coverage after Changes in Law
November 06, 2013 —
CDJ STAFFA construction defect case lead at the U.S. District Court for Hawaii involved the insurer’s changed views on what was covered based on court decisions that came after the policy was written. John R. Casciano and Jessica L. Urban of Steptoe & Johnson LLP discuss the case on their firm’s website. They note that in Illinois National Insurance Company v. Nordic PCL Construction, Inc., Nordic built a retail building which soon afterwards had water leaks and property damage, due to alleged defects in the roof construction.
Nordic had purchased comprehensive general liability and umbrella polices, with coverage that included property damage. Mr. Casciano and Ms. Urban note that “at the time of contracting, the Ninth Circuit had predicted that, ‘if the Hawaii Supreme Court examined the matter, it would rule that, for purposes of insurance coverage, construction defects were “not occurrences.”’” After the policy was written, the Hawaii Intermediate Court of Appeals did rule that “construction defect claims do not constitute an ‘occurrence’ under a CGL policy.” On the basis of this, Illinois National determined that they had no duty to defend or indemnify their client.
Nordic made a claim of bad faith, but the court determined that “an insurer that denies coverage based on an open question of law does not act in bad faith, an insurer that actually relies on governing law, even if the insurer only belatedly learns of the law, cannot be said to thereby act in bad faith.”
However, the court denied a summary judgment of Nordic’s claim of negligent misrepresentation, determining that there was “a question of fact as to whether the Policies covered [or were represented as covering] only damage to third parties caused by subcontractors’ defective work.” Finally, the court found that “a reasonable jury could infer that, at the time the Polices were issued, the insurers meant to cover claims arising out of the defective work” of Nordic’s subcontractors.
They conclude that the Nordic decision “recognizes the varying consequences for coverage claims when post-contracting changes to the law may not coincide with the expectations of at least one of the parties at the time of contracting.”
Read the court decisionRead the full story...Reprinted courtesy of
Insurer Liable for Bad Faith Despite Actions of Insured Contributing to Excess Judgment
January 02, 2019 —
Tred R. Eyerly - Insurance Law HawaiiReversing the intermediate appellate court, the Florida Supreme Court held the insurer liable for bad faith despite imperfect actions by the insured. Harvey v. GEICO Gen. Ins. Co., 2018 Fla. LEXIS 1705 (Fla. Sept. 20, 2018).
Insured James Harvey was involved in an auto accident in which the other driver, 51 year old John Potts, was killed. Harvey's vehicle was registered in both his name and his business's name, and was covered under a $100,000 liability policy. Harvey reported the accident to his insurer, GEICO. The claim was assigned to a claims adjuster, Fran Korkus.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Delays in Filing Lead to Dismissal in Moisture Intrusion Lawsuit
September 09, 2011 —
CDJ STAFFThe Alabama Court of Civil Appeals has upheld a summary judgment in the case of Franklin v. Mitchell. Walter Mitchell, doing business as Southern Classic Construction built a new home for the Franklins. The Franklins moved into the home in October 2001. In April 2006 they discovered sagging floors in both the bathroom and kitchen. They contacted Mitchell who suggested the flooring might be defective. The Franklins spent eight months attempting to contact the flooring manufacturer.
In March 2007, the Franklins had the home inspected. The sagging was determined to be due to a loss of strength in the decking because of condensation from the air conditioning system. Air returns were not properly sealed and drawing moisture into the structure. There was mold on the decking and floor joints.
When Mitchell was contacted by the Franklins, he told them his one-year warranty had expired but had the HVAC subcontractor, Southern Mechanical Heating & Air (owned by Mitchell’s father, Jim Mitchell), look at the situation. SMHA replaced and braced subfloors. Later, they entered the crawl space to tape ducts, seal the air return, and insulate the air vent housing. The Franklins were not satisfied with the repairs, as not all the ducts were taped, nor were the air vent housings insulated.
Franklin complained to Walter Mitchell who again cited his one-year warranty. Jim Mitchell said he would not report complaints to his insurer, stating that the repairs were unnecessary, that the work had been done correctly in the first place, and it was only done at the request of Walter Mitchell.
In February 2009, the Franklins sued Walker Mitchell. Mitchell denied the claims, citing in part the statute of limitations. Mitchell also filed complaints against three subcontractors, including his father’s firm. Mitchell received a summary judgment as the case started after Alabama’s six-year statute of limitations.
The appeals court rejected the Franklin’s argument that the claim of damage did not start until they were aware it was due to a construction defect. The court noted that as Walter Mitchell was licensed as a “residential home builder, the statute the Franklins cite did not apply, as it concerns architects, engineers, and licensed general contactors.”
Nor did they feel that Mitchells’ claim that his warranty had expired were sufficient to override the statute of limitations, quoting an earlier case, “Vague assurances do not amount to an affirmative inducement to delay filing suit.” Their claim of subsequent negligent repairs was rejected because Mitchell did not direct the specific actions taken by his father’s firm.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Do We Need Blockchain in Construction?
June 22, 2020 —
Cristina Savian - AEC BusinessBlockchain technology claimed to have the potential to disrupt many aspects of how companies do business. And like other emerging technologies, I have been exploring its uses, benefits and assessing its potential opportunities in the construction industry. If like me, you have been wondering what it is and if its applications are limited to financial services and cryptocurrencies; you will be pleasantly surprised to discover that it has a lot more applications with exciting opportunities for our sector too.
Blockchain could have a significant impact on our industry. In writing this article I have discovered that the Australian government is full steam ahead, that many organisations are currently building their own blockchain networks and that it is something that businesses right across the built environment should be preparing for now. But more on that soon, first we need to define what blockchain is.
Read the court decisionRead the full story...Reprinted courtesy of
Cristina Savian, AEC Business
#12 CDJ Topic: Am. Home Assur. Co. v. SMG Stone Co., 2015 U.S. Dist. LEXIS 75910 (N. D. Cal. June 11, 2015)
December 30, 2015 —
Beverley BevenFlorez-CDJ STAFFIn his article, “Remediation Work Caused by Installation of Defective Tiles Not Covered,” attorney
Tred R. Eyerly analyzed the Am. Home Assur. Co. case that involved a dispute between a developer and a subcontractor over fractured tiles: “On cross-motions for summary judgment, the court first found that the fracturing of the stone floor tiles caused by the subcontractor's defective installation was the result of an 'occurrence.' There was no evidence that the subcontractor knew that its tile installation work was defective before the tiles fractured. Instead, the fracturing was an unexpected consequence of the defective installation.”
Everly continues, “But there was no ‘property damage.’ For the subcontractor to prevail, the defective installation work had to be considered separate and distinct from the physical manifestation of the defective work. Under California law, coverage resulted from construction defects that involved physical injuries to other parts of the construction project.” Everly concludes, “Because there was no genuine issues of material fact as to the potential for coverage, there was no duty to defend.”
Read the full story...
Read the court decisionRead the full story...Reprinted courtesy of
Claim Against Broker for Failure to Procure Adequate Coverage Survives Summary Judgment
April 15, 2014 —
Tred R. Eyerly – Insurance Law HawaiiThe broker's motion for summary judgment, seeking to dismiss negligence claims for failure to obtain adequate coverage, was denied by the court in Voss v. The Netherlands Ins. Co., 2014 N.Y. LEXIS 384 (N.Y. Ct. App. Feb. 25, 2014).
The insured met with a representative of CH Insurance Brokerage Services Co., Inc. (CHI) to discuss coverage for the premises and her two companies. At CHI's request, the insured shared information on sales figures for calculating business interruption coverage. The broker represented that CHI would reassess and revisit the coverage needs as her business grew.
CHI recommended $75,000 per incident in coverage for business interruption losses. The insured questioned whether the $75,000 limit was adequate, but the broker assured her that it was sufficient. The insured then accepted the recommendation. Subsequently, the insured's business grew, but CHI renewed the policy with the same $75,000 business interruption limit.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com