Illinois Supreme Court Rules Labor Costs Not Depreciated to Determine Actual Cash Value
November 19, 2021 —
Tred R. Eyerly - Insurance Law HawaiiThe Illinois Supreme Court determined that a homeowner insurer may not depreciate labor costs in calculating actual cash value (ACV) after a loss under the policy. Sproull v. State Farm Fire and Casualty Co., 2021 Ill. LEXIS 619 (Ill. Sept. 23, 2021).
Plaintiff was insured under a homeowner's policy that provided replacement cost coverage for structural damage. Under the policy, the insured would initially receive an ACV payment but then could receive replacement cost value (RCV) if repairs or replacement were completed within two years and the insurer was timely notified. The policy did not define "actual cash value."
Plaintiff suffered wind damage to his residence and timely submitted a property damage claim to State Farm. The adjuster determined that the building sustained a loss with RCV of $1711.54. In calculating ACV, State Farm began with the RCV and then subtracted plaintiff's $1000 deductible and an additional $394.36, including taxes, for depreciation. Plaintiff thus received an ACV payment of $317.18. Plaintiff claimed that he was underpaid on his ACV claim because State Farm depreciated labor, which is intangible and thus not subject to wear, tear, and obsolescence. Further, labor should not have been depreciated because it was not susceptible to aging or wearing and its value did not diminish over time.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
TV Kitchen Remodelers Sued for Shoddy Work
December 04, 2013 —
CDJ STAFFTheir remodels may dazzle on television, but someone who hired Bunelleschi Construction, the company owned by “Kitchen Cousins” stars John Colaneri and Anthony Carrino, wasn’t quite so dazzled. And now Robert and Peng Avery are suing the two men and their company for a kitchen remodel gone awry. They claim that the company left their Tenafly, New Jersey home uninhabitable.
According to the couple, the Brunelleschi’s work included “numerous gaps in sheetrock” and improper installation of ductwork, plumbing, and doors. They also claim that Brunelleschi Construction falsely claimed the work had passed final building and electrical inspections. When the company stopped work, the couple was unable to obtain a certificate of occupancy.
Read the court decisionRead the full story...Reprinted courtesy of
Endorsements Preclude Coverage for Alleged Faulty Workmanship
December 30, 2019 —
Tred R. Eyerly - Insurance Law HawaiiThe court found coverage for alleged faulty workmanship was barred by the Combination Construction Related Endorsement and Roofing Endorsement. Evanston Ins. Co. v. A&S Roofing, 2019 U.S. Dist. LEXIS 142828 (W.D. Okla. Aug. 22, 2019).
In 2010, A&S entered into a subcontract with the contractor to replace roofs on three buildings owned by Oklahoma Property Investors (OPI). Eagle was a subcontractor of A&S that installed the roofing. After the roofs were replaced, OPI filed suit against A&S, alleging that A&S provided 15-year warranties for the roofing work performed on the three buildings and that A&S breached each warranty by performing the work in a poor manner, resulting in failures to each of the roofs. OPI sought monetary relief including damages to its properties, of its tenants, and costs of repairs to its properties.
A&S's insurer, Evanston, denied coverage. Evanston pointed to the"legally obligated to pay" language of the CGL policy and argued coverage only extended to tort-based claims. Evanston argued the OPI lawsuit did not allege any tort claims, only warranty claims arising from contract. Second, Evanston contended the alleged "poor craftsmanship" giving rise to the claims in the OPI lawsuit that did not constitute an "occurrence" under the policy.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
California Restricts Principles of “General” Personal Jurisdiction
April 01, 2015 —
Kristian B. Moriarty and R. Bryan Martin – Haight Brown & Bonesteel LLPIn BNSF Railway Company v. Superior Court (Kralovetz) (Filed 3/27/2015, No. B260798), the California Court of Appeal, Second District, held a Delaware railroad corporation, with its principal place of business in Texas, was not subject to “general” personal jurisdiction in California, despite California housing 8.1% of the corporation’s total workforce, accounting for 6% of the corporation’s revenue, and containing just under 5% of its total track mileage.
Plaintiff, Vicki Kralovetz, filed suit in California Superior Court against defendant, BNSF Railway Company (“BNSF”), and others, for wrongful death. Plaintiff contended her husband was exposed to asbestos products manufactured by BNSF in Kansas while working at a dismantling facility owned by BNSF’s predecessor in interest. Plaintiff claimed the exposure caused her husband to contract mesothelioma, which resulted in his death.
Reprinted courtesy of
Kristian B. Moriarty, Haight Brown & Bonesteel LLP and
R. Bryan Martin, Haight Brown & Bonesteel LLP
Mr. Moriarty may be contacted at mmoriarty@hbblaw.com
Mr. Martin may be contacted at bmartin@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
South Dakota Supreme Court Holds That Faulty Workmanship Constitutes an “Occurrence”
September 14, 2017 —
Samantha Martino - Saxe Doernberger & Vita, P.C.The South Dakota Supreme Court recently determined that damage resulting from a subcontractor’s failure to test soil compaction before constructing a home constituted an “accident” and was therefore an “occurrence” under a commercial general liability (CGL) policy.
In Owners Ins. Co. v. Tibke Construction, Inc., the homeowners hired Tibke Construction, Inc. to build a new house, and Tibke Construction hired subcontractor Jerry’s Excavating to perform excavation work. The homeowners contended that Jerry’s Excavating failed to do soil compaction testing before commencing construction, which resulted in the home being built on highly expansive soils, leading to damage including excessive settlement, cracking and structural unsoundness.
Read the court decisionRead the full story...Reprinted courtesy of
Samantha Martino, Saxe Doernberger & Vita, P.C.Ms. Martino may be contacted at
smm@sdvlaw.com
Difficult Task for Court to Analyze Delay and Disorder on Construction Project
August 23, 2021 —
David Adelstein - Florida Construction Legal UpdatesOne of my favorites quotes from a case, and I am sure others in the construction industry feel the same way or can relate, is from the District of Columbia Court of Appeals in Blake Construction Co., Inc. v. C.J. Coakley Co., Inc., 431 A.2d 569, 575 (D.C. 1981):
We note parenthetically and at the outset that, except in the middle of a battlefield, nowhere must men coordinate the movement of other men and all materials in the midst of such chaos and with such limited certainty of present facts and future occurrences as in a huge construction project such as the building of this 100 million dollar hospital. Even the most painstaking planning frequently turns out to be mere conjecture and accommodation to changes must necessarily be of the rough, quick and ad hoc sort, analogous to ever-changing commands on the battlefield. Further, it is a difficult task for a court to be able to examine testimony and evidence in the quiet of a courtroom several years later concerning such confusion and then extract from them a determination of precisely when the disorder and constant readjustment, which is to be expected by any subcontractor on a job site, become so extreme, so debilitating and so unreasonable as to constitute a breach of contract between a contractor and a subcontractor.
Do you agree with this sentiment? The reality is that retrospectively analyzing delay on a complicated construction project with numerous moving parts on a day-by-day, hour-by-hour, basis is no easy feat. It is not easy for the parties and certainly not easy for courts to unravel. With every party claiming delay based on a retrospective analysis there will be another party with either a different delay analysis or providing credible cross examination as to flaws with the delay analysis. The same bodes true with loss of productivity / inefficiency claims and the particular case-specific facts are important, preferably with evidence such as photos, videos, notifications, daily reports, manpower reports, etc., supporting the facts. But the facts are complicated, and the delay analysis is complicated, and it is a difficult task for a trier of fact to unravel these facts.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Stair Collapse Points to Need for Structural Inspections
November 27, 2013 —
CDJ STAFFThe exterior stairways at the Nutmeg Woods apartments in New London, Connecticut have lead to injuries three times in the last three years, with the most recent failure causing fatal injuries. Despite the annual injuries, the city has not been inspecting the stairways on an annual basis. Calvin Darrow, New London’s fire marshal, told The Day, a New London newspaper, that these inspections are supposed to occur annually, but tend to come about once every five years. Mr. Darrow ascribed the matter to staffing issues.
The stairways have now received a preliminary inspection by a structural engineer, and building and fire officials. Kirk Kripas told the paper that the Building Department was still attempting to determine when the stairs were built.
Read the court decisionRead the full story...Reprinted courtesy of
Bar to Raise on Green Standard
November 07, 2012 —
CDJ STAFFNext June, members of the U.S. Green Building Council will be voting on changes to the LEED green building standard. “The bar is getting raised,” said Navad Malin of BuildingGreen, a consulting and publishing firm, in an article in USA Today. Under the proposed guidelines, builders would have to project energy and water use for five years as part of the certification process. However, if the occupants aren’t as green as the builders anticipated, the buildings will not lose their certification.
The new rules will include higher energy standards, award points for avoiding potentially hazardous materials, and even determine what kind of plumbing items can be used.
Read the court decisionRead the full story...Reprinted courtesy of