New York Appellate Court Expands Policyholders’ Ability to Plead and Seek Consequential Damages
February 27, 2019 —
Michael S. Levine & Joshua S. Paster - Hunton Andrews KurthIn a huge win for policyholders, a New York appellate court, in D.K. Property, Inc. v National Union Fire Insurance Company of Pittsburgh, Pa., held that an insured need not provide a detailed factual description or explanation for why consequential damages are recoverable at the pleading stage. Rather, an insured’s complaint must only (i) specify the types of consequential damages claimed; and (ii) allege that those damages reasonably were contemplated by the parties prior to contracting.
Here, D.K. Property’s building was damaged as a result of construction on an adjoining building, and it timely filed a claim with National Union under a policy that covers “direct physical loss or damage to” the building. National Union neither paid the claim nor disclaimed coverage. Instead, according to D.K. Property, National Union made unreasonable and increasingly burdensome information demands over a three-year period, which it alleges was a “tactic” to make pursuing the claim so expensive that D.K. Property would abandon the claim. As a result of the delay, D.K. Property alleges the structural damage to its building has worsened.
Reprinted courtesy of
Michael S. Levine, Hunton Andrews Kurth and
Joshua S. Paster, Hunton Andrews Kurth
Mr. Levine may be contacted at mlevine@HuntonAK.com
Mr. Paster may be contacted at jpaster@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
Nerves of Steel Needed as Firms Face Volatile Prices, Broken Contracts and Price-Gouging
December 06, 2021 —
Richard Korman, Jonathan Barnes, & Greg Aragon - Engineering News-RecordWhen Elmhurst Group, a Pittsburgh-area developer, started collecting bids for a new mixed-use building last November, the price of the steel frame, roof and cladding panels for the $14-million project came in $382,000 higher than expected—a big enough disappointment to give Elmhurst pause. Overall material costs for the project were running more than $650,000 above what was originally calculated.
Reprinted courtesy of
Richard Korman, Engineering News-Record,
Jonathan Barnes, Engineering News-Record and
Greg Aragon, Engineering News-Record
Mr. Korman may be contacted at kormanr@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Occurrence-Based Insurance Policies and Claims-Made Insurance Policies – There’s a Crucial Difference
April 13, 2017 —
Garret Murai – California Construction Law BlogI’ve yet to find reading through an insurance policy on anyone’s “bucket list.”
But read them you should. Or have your attorney read through them (wink, wink).
Because when you need to tender a claim there’s probably no more important document in the world.
In Tidwell Enterprises, Inc. v. Financial Pacific Insurance Company, Inc., Case No. C078665 (November 29, 2016), a client whose attorney did read the policy, bested the insurer of a policy it issued.
Tidwell Enterprises, Inc.
In 2006 or 2007, Tidwell Enterprises, Inc. installed a fireplace at a single-family home located in Copperopolis, California. At the time, Tidwell had a general commercial liability policy issued by Financial Pacific Insurance Company, Inc. which expired in March 2010.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Wendel Rosen Black & Dean LLPMr. Murai may be contacted at
gmurai@wendel.com
Heavy Rains Cause Flooding, Mudslides in Japan
July 31, 2023 —
Associated Press - BloombergTOKYO (AP) — Torrential rain pounded southwestern Japan, triggering floods and mudslides and leaving two people dead and at least six others missing, officials said Monday.
Rain falling in the regions of Kyushu and Chugoku since the weekend caused flooding along many rivers, triggered mudslides, closed roads, disrupted trains and cut the water supply in some areas.
The Japan Meteorological Agency issued an emergency heavy rain warning for Fukuoka and Oita prefectures on the southern main island of Kyushu, urging residents in riverside and hillside areas to take maximum caution. More than 1.7 million residents in vulnerable areas were urged to take shelter. The emergency warning was downgraded later Monday to a regular warning.
Read the court decisionRead the full story...Reprinted courtesy of
Bloomberg
Break out the Neon: ‘80s Era Davis-Bacon “Prevailing Wage” Definition Restored in DOL Final Rule
August 21, 2023 —
A. Scott Hecker & Ted North - The Construction SeytOn August 8, 2023, the U.S. Department of Labor (DOL)
announced its
final rule related to the Davis-Bacon Act (the “Act”), entitled “Updating the Davis-Bacon and Related Acts Regulations.” However, the official final rule must be published in the Federal Register – likely by week’s end – before going into effect 60 days after publication.
DOL issued its notice of proposed rulemaking (“NPRM”) in March 2022 and received more than 40,000 comments from interested stakeholders. Evaluating and addressing those comments took the better part of a year, as DOL did not send the rule to the Office of Information and Regulatory Affairs (“OIRA”) for White House approval until December 16, 2022. After languishing for months, OIRA has now concluded its review, allowing DOL to move forward with its final rule.
Reprinted courtesy of
A. Scott Hecker, Seyfarth and
Ted North, Seyfarth
Mr. Hecker may be contacted at shecker@seyfarth.com
Mr. North may be contacted at enorth@seyfarth.com
Read the court decisionRead the full story...Reprinted courtesy of
Real Estate & Construction News Round-Up (09/21/22) – 3D Printing, Sustainable Design, and the Housing Market Correction
October 17, 2022 —
Pillsbury's Construction & Real Estate Law Team - Gravel2Gavel Construction & Real Estate Law BlogThe first 3D-printed home is under construction, construction contractors could face liability for not securing employee data, the housing market correction continues, and more.
- Sustainable home design has become key focus of builders and homeowners, helping reduce carbon emissions and other environmental impacts. (Kristi Waterworth, U.S.News)
- Construction contractors could face legal consequences for failing to manage employee data correctly. (Robyn Griggs Lawrence, Construction Dive)
- The home price correction continues to spread across the U.S., with an interactive map showcasing local housing markets that have been impacted. (Lance Lambert, Fortune)
Read the court decisionRead the full story...Reprinted courtesy of
Pillsbury's Construction & Real Estate Law Team
Although Property Damage Arises From An Occurrence, Coverage Barred By Business Risk Exclusions
July 08, 2011 —
Tred R. Eyerly - Insurance Law HawaiiThe homeowners hired the insured to raise the structure of their home twenty-four inches above the flood zone. Lafayette Ins. Co. v. Peerboom, 2011 U.S. Dist. LEXIS 58985 (S.D. Miss. June 2, 2011). When the insured’s crew returned from lunch one day, they found the house had fallen from hydraulic jacks being used to raise the structure a few inches at a time. There was substantial damage to the entire structure.
The homeowners sued, asserting several claims, including negligence and breach of contract. The complaint alleged the homeowners entered a contract with the insured to raise their structure while maintaining its integrity. However, the insured failed to use proper equipment, which caused the house to fall and be completely destroyed.
The insured tendered the claim to its insurer, Lafayette Insurance Company. Lafayette defended under a reservation of rights and filed suit for a declaratory judgment. Lafayette’s subsequent motion for summary judgment contended there was no “occurrence” alleged in the underlying complaint and, even if there was, the business risk exclusions barred coverage.
Read the full story…
Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com
Read the court decisionRead the full story...Reprinted courtesy of
Five Types of Structural Systems in High Rise Buildings
November 02, 2020 —
Chris Jackson - Construction ExecutiveToday, many cities in different countries have high-rise buildings or more popularly known as skyscrapers. The concept of skyscraper was first used to define the more than 137-foot-high buildings constructed in Chicago in 1885. It is generally defined as one that is taller than the maximum height that requires mechanical vertical transportation for people. Usually, these buildings only have limited uses and are primarily focused on functioning as residential apartments, hotels and office buildings, though they occasionally include retail and educational facilities. Because high-rise buildings are among the largest buildings built, it is necessary that their commercial and office functions require a high degree of flexibility.
That’s why it is important for high-rise buildings to have structural systems or structural frames—the assembly of interrelated or interdependent elements that forms a complex structure. These structural systems are built and designed for resisting different loads. To further understand how structural systems work, take the human body as a comparison. If human bones are weak and not properly aligned, the human body as a whole will not be able to perform or work well. Structural systems, in the same way, would not be able to take loads if not built properly. After all, no one wants a toppling skyscraper. To give the readers more information about structural systems in high-rise buildings, this article will discuss some of them.
Reprinted courtesy of
Chris Jackson, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of