Do Engineers Owe a Duty to Third Parties?
June 10, 2015 —
Craig Martin – Construction Contractor AdvisorA Texas Court of Appeals, in USA Walnut Creek, DST v. Terracon Consultants, Inc., recently ruled that an engineer owed a duty to the buyer of an apartment complex, even though the engineer had no contractual relationship with the buyer. This is an expansion of the duty professionals owe on construction projects and could signal a change in the law.
In the case, Walnut Creek purchased a three year old apartment complex. A few years after taking possession, Walnut Creek noticed problems with the apartments, including cracking foundations, walls, breaking windows, and out of square door frames. Walnut Creek sued the developer and general contractor, alleging construction defects. The developer claimed that the engineer, Terracon, was at fault and Walnut Creek added Terracon to the lawsuit, asserting that Terracon was negligent in performing engineering services during construction. Terracon asked the court to dismiss the claim, arguing that it did not owe a duty to Walnut Creek. Walnut Creek in turn argued that engineers do owe a duty to subsequent owners. The trial court dismissed the case against the engineer and Walnut Creek appealed.
The appellate court reversed the trial court, finding that the engineer did owe a duty to subsequent purchasers. The court seemed persuaded by the allegations that the engineer actually created the construction defects which were the basis for the litigation.
Read the court decisionRead the full story...Reprinted courtesy of
Craig Martin, Lamson, Dugan and Murray, LLPMr. Martin may be contacted at
cmartin@ldmlaw.com
Surviving the Construction Law Backlog: Nontraditional Approaches to Resolution
June 07, 2021 —
Jeffrey Kozek - Construction ExecutiveAcross the construction industry, COVID-19’s impact has caused a range of problems for contractors and projects—prolonged or intermittent work shutdowns, supply chain delays, pricing increases on materials and funding shortfalls. It has also led to court closures. The legal backlog for claims and disputes means that owners and contractors are facing the option of waiting until the courts are functioning the way they were previously or utilizing alternative approaches to resolution to keep projects and businesses running.
Though courts across the country reopened to some extent in the latter half of 2020, many state and federal facilities were shut down or working with a limited capability for weeks or months. The closures not only froze the progress of numerous disputes already underway, but caused new schedule, cost and COVID-19-related claims to also be held up in the same backlog that is slowly being addressed under current restricted operations. New safety measures to reduce viral transmission, including reduced usage of courtrooms, restrictions on personnel and increased cleaning and sanitizing measures, have limited the number of cases courts can handle on a daily basis and lengthened legal timelines in ways many parties had not anticipated and cannot afford.
Reprinted courtesy of
Jeffrey Kozek, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
New Orleans Reviews System After Storm Swamps Pumps
August 17, 2017 —
Pam Radtke Russell - Engineering News-RecordThe city of New Orleans will hire an independent team of engineers to evaluate the problems that led to severe flooding following an Aug. 5 rainfall of up to 10 in. The decision followed the revelation that 16 of the city’s pumps were not working, despite claims the system was at capacity. Further, the power system that operates those pumps was severely crippled.
Read the court decisionRead the full story...Reprinted courtesy of
Pam Radtke Russell, ENRMs. Russell may be contacted at
Russellp@bnpmedia.com
Is the Sky Actually Falling (on Green Building)?
November 03, 2016 —
Christopher G. Hill – Construction Law MusingsI have spoken on many occasions here at Construction Law Musings and elsewhere about the risks and rewards for contractors found in sustainable construction. The rewards were fairly apparent. New markets, government incentives and the desires of owners to be “green” clearly point toward a need for contractors to get into the sustainable building game.
However, when I was first writing my Eeyore like thoughts most of the thoughts of all us construction attorneys were speculative. Whether because wholesale “green” construction was relatively new or because the court process was relatively slow, there were not many ways to test if our, shall we say “less optimistic,” predictions were going to come to pass.
For better or worse, several of the more dire predictions have come true. One major green construction debacle is the Destiny USA litigation. I cannot possibly set out all of the various issues as well as my friend and colleague Chris Cheatham does in his e-book about the project and its aftermath. I highly recommend this e-book and the posts found at Chris’ Green Building Law Update blog for those of you interested in how the IRS, the USGBC and the Green Bonds Program interact to cause many a pitfall for construction and design professionals.
Read the court decisionRead the full story...Reprinted courtesy of
Christopher G. Hill, The Law Office of Christopher G. Hill, PCMr. Hill may be contacted at
chrisghill@constructionlawva.com
Constructing a New American Dream
August 06, 2014 —
Beverley BevenFlorez-CDJ STAFFShelley D. Hutchins in Big Builder interviewed various architects and engineers to discuss the future of home design and building. Obtaining the American Dream “means having a place of sanctuary and security as well as shelter,” Hutchins wrote. “What that house looks like and how it functions is changing to accommodate different family make-ups, population and culture shifts toward denser more integrated communities, and increasingly extreme weather patterns.”
Hutchins declared, “According to experts, educators, and experimenters in the residential design and construction industry many solutions for building houses for the future involve revisiting what worked before. Combining historic research with new innovations is what will produce the best housing.”
Read the court decisionRead the full story...Reprinted courtesy of
Approaches in the Absence of a Differing Site Conditions Clause
April 10, 2019 —
Parker A. Lewton - Smith CurrieA contractor who has encountered unforeseen conditions will typically rely on the contract’s differing site conditions clause as a means to recovery. Most construction contracts address those issues directly. In ConsensusDocs Standard Agreement and General Conditions between Owner and Constructor, the starting point is § 3.16.2. But what if the contract does not contain a differing site conditions clause? Or, what if the contract does contain such a clause, but the contractor failed to provide adequate notice or satisfy other conditions or requirements of the contract? When reliance on a differing site conditions clause is impractical, a contractor still may seek recovery in certain instances under one or more of the following legal theories: misrepresentation; fraud; duty to disclose; breach of implied warranty; and mutual mistake.
Misrepresentation
Misrepresentation occurs when an owner “misleads a contractor by a negligently untrue representation of fact[.]” John Massman Contracting Co. v. United States, 23 Cl. Ct. 24, 31 (1991) (citing Morrison–Knudsen Co. v. United States, 170 Ct. Cl. 712, 718–19, 345 F.2d 535, 539 (1965)). A contractor may be able to recover extra costs incurred, under a theory of misrepresentation, if it can show that (1) the owner made an erroneous representation, (2) the erroneous representation went to a material fact, (3) the contractor honestly and reasonably relied on that representation, and (4) the contractor’s reliance on the erroneous representation was to the contractor’s detriment. See T. Brown Constructors, Inc. v. Pena, 132 F.3d 724, 728–29 (Fed. Cir. 1997). These four requirements can be satisfied, for example, through the use of deposition testimony detailing the owner’s representations and the contractor’s reliance thereon. See, e.g., C & H Commercial Contractors, Inc. v. United States, 35 Fed. Cl. 246, 256–57 (1996).
Read the court decisionRead the full story...Reprinted courtesy of
Parker A. Lewton, Smith CurrieMr. Parker may be contacted at
palewton@smithcurrie.com
Boston-area Asbestos-Abatement Firms Face Wage and Safety Complaints
January 26, 2017 —
Justin Rice - Engineering News-RecordSeveral federal and state complaints against asbestos-abatement and demolition firms operating in Massachusetts have sprouted in the wake of the region’s construction boom. Involving mostly small companies and immigrant workers, the cases allege wage and benefit violations as well as improper exposure to asbestos fibers, which contain cancer-causing carcinogens.
Read the court decisionRead the full story...Reprinted courtesy of
Justin Rice, ENRMr. Rice may be contacted at
ricej@enr.com
Structural Engineer Found Liable for Defects that Rendered a Condominium Dangerously Unsafe
June 22, 2016 —
Paul R. Cressman, Jr. – Ahlers & Cressman Construction Law BlogOn May 3, 2016, the Washington State Court of Appeals affirmed a jury’s verdict in favor of a condominium HOA against a structural engineer for $1,149,332 in damages.[1]
The project in question was The Pointe, an upscale condominium building in Westport, Washington. The developer was Dodson-Duus, LLC. The architect was Elkins Architects (“Elkins”). The structural engineer was Engineers Northwest, Inc. (“ENW”). ENW contracted with Elkins for the structural engineering work.
Birds flying past 3 construction cranesBoth the design and construction of the building suffered from defects. In particular, the lateral force resistance system was insufficient to withstand a large seismic event. The defects included improperly nailed shear walls, weak connections between shear walls and floor joists, improperly-sized floor sheathing, a weak second-floor diaphragm, and omitted hold-downs connecting shear walls to a steel beam. The use of gypsum sheathing also created a risk of corrosion to the building’s steel structure. Evidence tied each of these defects to some aspect of ENW’s structural calculations and designs. Evidence also tied omission of the hold-downs to the contractor’s construction decisions.
Read the court decisionRead the full story...Reprinted courtesy of
Paul R. Cressman, Jr., Ahlers & Cressman PLLC Mr. Cressman may be contacted at
pcressman@ac-lawyers.com