A Community Constantly on the Brink of Disaster
February 06, 2023 —
Jason Daniel Feld - Kahana FeldIn the beautiful coastline region along the famous Pacific Coast Highway between Ventura and Santa Barbara rests the small cottage town of La Conchita. With unobstructed ocean views, this community is only 820 feet wide on a narrow strip of land abutting a 590 feet high cliffside bluff. The bluff has a slope of approximately 35 degrees and consists of poorly cemented marine sediments. This is the perfect recipe for constant disaster from a geological perspective and the site of several major landslides that have devastated this community. Geologic evidence indicates that landslides, which are part of the larger Rincon Mountain slides, have been occurring at and near La Conchita for many thousands of years up to the present with reported landslides beginning as early as 1865. In both 1889 and 1909, the
Southern Pacific Rail Line
running along the coast was inundated. In the 1909 slide, a train was buried. Since that time, other slides have occurred, covering at times cultivated land, roadways, and the community itself. The two most devastating landslides occurred in 1995 and 2005.
1995 Landslide
From October 1994-March 1995, there was double the amount of seasonal rainfall for the area – in excess of 30 inches. The slide occurred on March 3, 1995, when surface cracks in the upper part of the slope opened on the hillside, and
surface runoff was infiltrating into the subsurface. The heavy rains essentially saturated the slope causing a massive slide. On March 4, 1995, the hill behind La Conchita failed, moving tens of meters in minutes, and buried nine homes with no loss of life. The
County of Ventura immediately declared the whole community a
Geological Hazard Area, imposing building restrictions on the community to restrict new construction. On March 10, 1995, a subsequent debris flow from a canyon to the northwest damaged five additional houses in the northwestern part of La Conchita. In total, the slide measured approximately 390 feet wide, 1080 feet long and 98 feet deep. The deposit covered approximately 9.9 acres, and the volume was estimated to be approximately 1.7 million cubic yards of sediment. The devastation was immeasurable and the damage to homes, property and infrastructure was in the millions of dollars to repair. Litigation quickly arose following the 1995 slide with seventy-one homeowners suing the La Conchita Ranch Co. in Bateman v. La Conchita Ranch Co. The judge ruled that irrigation was not the major cause of the slide and that the ranch owners were not responsible.
Read the court decisionRead the full story...Reprinted courtesy of
Jason Daniel Feld, Kahana FeldMr. Feld may be contacted at
jfeld@kahanafeld.com
Green Energy Can Complicate Real Estate Foreclosures
November 30, 2016 —
Bob L. Olson – Snell & Wilmer Real Estate Litigation BlogA quick drive through almost any newer residential community in the Southwest will show that a lot of residents are embracing “Green Energy” or renewable energy by placing solar panels on their properties. While most people would agree that increasing the use of alternative energy is socially responsible, there are a number of real estate investors that may view it as an opportunity to make additional profits by purchasing distressed properties with solar panels and then reselling those properties for more than they would be worth without solar panels. The theory is relatively straight forward as many believe that foreclosure of a deed of trust that was recorded before the solar panels were installed would extinguish any liens in favor of the vendor that sold or financed the sale of the solar panels. After all, it is generally held that “a valid foreclosure of a mortgage terminates all interest in the foreclosed real estate that are junior to the mortgage being foreclosed.” See SFR Investments Pool 1, LLC v. U.S. Bank, N.A., 130 Nev. Adv. Op. 75, 334 P.3d 408, 412 (2014) (quoting Restatement (Third) of Property, Mortgages §7.1 (1997)).
NOT SO FAST! While the general rule is that foreclosure of a senior lien terminates junior liens, most purveyors of solar panels do not encumber the property with mortgages or deeds of trust to secure payment of amounts they are owed. Rather, they typically either lease the solar panels to the property owner or secure repayment of the purchase price of the solar panels with a fixture filing under the Uniform Commercial Code (the “UCC”).
Read the court decisionRead the full story...Reprinted courtesy of
Bob L. Olson, Snell & WilmerMr. Olson may be contacted at
bolson@swlaw.com
Unravel the Facts Before Asserting FDUTPA and Tortious Interference Claims
September 05, 2022 —
David Adelstein - Florida Construction Legal UpdatesCMR Construction and Roofing, LLC v. UCMS, LLC, 2022 WL 3012298 (11th Cir. 2022) is an interesting opinion where a contractor asserted a Florida’s Deceptive and Unfair Trade Practices Act (known by its acronym “FDUTPA”) claim and tortious interference claims (with a contract and with an advantageous business relationship) against another contractor, i.e., a competitor, that were dismissed from the get-go. It is an opinion worthy of interest based on the claims asserted against a competitor. Throwing around FDUTPA and tortious interference may sound good from an intimidation standpoint, but pleading and then proving these claims are a lot different than loosely throwing around these claims. Before filing a lawsuit for FDUTPA and tortious interference, spend time unraveling the facts and the chronology. Do not rely on conclusory allegations simply to check the box regarding required elements to plead while ignoring the actual facts that support the allegations. These are fact-based claims and it is imperative the facts are fully known from on the onset so that they can be strategically pled and pursued.
In this matter, a contractor, the plaintiff, was hired by a condominium association around April 2018 to repair damage caused by a hurricane which included roofing work. The association was going to have its insurer pay its contractor. In May 2020, the association hired a new contractor to perform the same work (the “new contractor”). The association then directed the plaintiff to cease work since it hired the new contractor.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
The Montrose Language Interpreted: How Many Policies Are Implicated By A Construction Defect That Later Causes a Flood?
March 17, 2011 —
Shaun McParland BaldwinThe Court of Appeals of Indiana recently addressed the “Montrose” language added to the CGL ISO form in 2001 in the context of a construction defect claim where a fractured storm drain caused significant flooding a year after the drain was damaged. The insuring agreement requires that “bodily injury or “property damage” be caused by an occurrence and that the “bodily injury or “property damage” occur during the policy period. The Montrose language adds that the insurance applies only if, prior to the policy period, no insured knew that the “bodily injury or “property damage” had occurred in whole or in part. Significantly, it also states that any “bodily injury” or “property damage” which occurs during the policy period and was not, prior to the policy period known to have occurred, includes a continuation, change or resumption of that “bodily injury” or “property damage” after the end of the policy period.
In Grange Mutual Cas. Co. v. West Bend Mut. Ins. Co., No. 29D04-0706-PL-1112 (Ct. App. IN March 15, 2011), http://www.ai.org/judiciary/opinions/pdf/03151109ehf.pdf, Sullivan was the General Contractor for a school construction project. Its subcontractor, McCurdy, installed the storm drain pipes. One of the storm pipes was fractured in 2005 while McCurdy was doing its installation work. More than a year later, the school experienced significant water damage due to flooding. It was later discovered that the flooding was due to the fractured storm drain. Sullivanrsquo;s insurer paid $146,403 for the water damage. That insurer brought a subrogation claim against McCurdy and its two insurers: West Bend and Grange. West Bend had issued CGL coverage to McCurdy while the construction was ongoing, including the date in which the storm pipe was fractured. Grange issued CGL coverage to McCurdy at the time of the flooding. Those two carriers jointly settled the subrogation claim and then litigated which insurer actually owed coverage for the loss. Significantly, the loss that was paid included only damages from the flooding, not any damages for the cost of repairing the pipe.
Read the full story...
Reprinted courtesy of Shaun McParland Baldwin of Tressler LLP. Ms Baldwin can be contacted at sbaldwin@tresslerllp.com
Read the court decisionRead the full story...Reprinted courtesy of
Harvey's Aftermath Will Rattle Construction Supply Chain, Economists Say
September 07, 2017 —
Tim Grogan - Engineering News-RecordHurricane Harvey’s immediate impact on the construction sector will be a disruption in the supply chain for key materials, along with scheduling problems for projects that were under construction. As the cleanup and eventual rebuilding proceed, increased demand for materials and labor will push costs upward and contractors will be scrambling to secure supplies and workers.
Read the court decisionRead the full story...Reprinted courtesy of
Tim Grogan, ENRENR may be contacted at
ENR.com@bnpmedia.com
Fifth Circuit Asks Texas Supreme Court to Clarify Construction Defect Decision
November 07, 2012 —
CDJ STAFFThe Fifth Circuit Court has withdrawn its decision in Ewing Construction Company v. Amerisure Insurance Company, pending clarification from the Texas Supreme Court of its decision in Gilbert Texas Construction, L.P. v. Underwriters at Lloyd’s London. The Fifth Circuit had applied the Gilbert case in determining that a contractual liability exclusion barred coverage for faulty workmanship. The Insurance Journal reports that this decision was both applauded and criticized, with a concern noted that “an insurer would now have its pick of either the ‘your work’ exclusion or the contractual liability exclusion without the exception for subcontracted work.”
The Fifth Circuit is now asking the Texas Supreme Court two questions to clarify Gilbert, which Brian S. Martin and Suzanne M. Patrick see as a sign that the Court has realized that it overly expanded the scope of the earlier ruling. A response is expected from the Texas Supreme Court by spring 2013.
Read the court decisionRead the full story...Reprinted courtesy of
Important Information Regarding Colorado Mechanic’s Lien Rights.
November 07, 2012 —
David McLain, Colorado Construction LitigationWith payment problems in the construction economy having accelerated over the past few years, there has been a substantial increase in mechanic’s lien activity and associated litigation. The typical mechanic’s lien claimant is a material supplier, a trade subcontractor, or even a general contractor that has not been paid by the developer/owner of the construction project. The reason for filing a mechanic’s lien claim is that it offers the prospect in many cases to make the unpaid construction professional a priority creditor, with a lien on the real estate that is superior to the construction lender.
One of the primary rules governing a mechanic’s lien claim is that the creditor’s formal written “Notice of Intent to File a Mechanic’s Lien” (hereafter “Lien Notice”) must be (1) served on the owner of the property for which the work was done or the materials used, and (2) served at the same time on the general contractor who has handled the construction project. After the creditor has made service of the lien claim by USPS certified mail (using the green return receipt card for proof of service) or separate personal delivery of the notice to the property owner and general contractor, ten full days must pass (not including the date of mailing of the notices) before the lien notice is filed in the public records.
After ten days have expired following the date of mailing using certified mail, or personal delivery of the notice to the property owner and the general contractor, the lien notice can be filed to make the lien valid.
Read the court decisionRead the full story...Reprinted courtesy of
David M. McLain, Higgins, Hopkins, McLain & Roswell, LLC.Mr. McLain can be contacted at
mclain@hhmrlaw.com
Another Case Highlighting the Difference Between CGL Policies and Performance Bonds
January 07, 2015 —
David M. McClain – Colorado Construction Litigation During the summer of 2011, Ellis Construction hired Cool Sunshine Heating & Air Conditioning to install the HVAC systems in a single-family home it was building for Gary Doberman and Ellen Robertson in Boulder, Colorado. The homeowners took issue with much of the work performed on their home and tried to negotiate directly with Ellis Construction. When those negotiations broke down, the homeowners sent a notice of claim pursuant to the Construction Defect Action Reform Act, C.R.S. § 13-20-801, et seq. One of the defects alleged in the notice of claim was that the SEERS 13 compressor installed by Cool Sunshine was inappropriate for the system and that because it was installed to run on only one stage, it did not meet the City of Boulder’s code requirements for noise levels. The homeowners therefore requested that the compressor be replaced with a SEERS 20 compressor, which would comply with the Boulder City Code.
Read the court decisionRead the full story...Reprinted courtesy of
David M. McLain, Higgins, Hopkins, McLain & Roswell, LLCMr. McLain may be contacted at
mclain@hhmrlaw.com