Rulemaking to Modernize, Expand DOI’s “Type A” Natural Resource Damage Assessment Rules Expected Fall 2023
December 23, 2023 —
Amanda G. Halter, Jillian Marullo & Ashleigh Myers - Gravel2Gavel Construction & Real Estate Law BlogThe U.S. Department of the Interior (DOI) anticipates proposing a new rule that would revise its “Type A” Natural Resource Damage Assessment (NRDA) regulations under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) in Fall 2023. The proposed rule would modernize DOI’s rarely used simplified Type A procedures for assessing damages for natural resource injuries tailored at sites involving minor releases of hazardous substances, with a smaller scale and scope of natural resource injury occurring in either coastal and marine areas or Great Lakes environments (the “Type A Rule”). (See 88 Fed. Reg. 3373; see 43 C.F.R. Pt. 11 Subpt. D.) The Type A Rule was last updated in 1997.
DOI previewed the proposal in January 2023 in its Office of Restoration and Damage Assessment’s (ORDA)
Advanced Notice of Proposed Rulemaking (ANPR). In the ANPR, the ORDA surmised that the Type A Rule was rarely used in part because of its restricted scope, but also because “the model equation for each Type A environment is the functional part of the rule itself—with no provisions to reflect evolving toxicology, ecology, technology, or other scientific understanding without a formal amendment to the Type A Rule each time a parameter is modified.” Calling the existing rule “inefficient and inflexible,” the ORDA stated that its proposal to reformulate the rule “as a procedural structure” would “modernize the Type A process and develop a more flexible and enduring rule than what is provided by the two existing static models” (88 Fed. Reg. 3373).
Reprinted courtesy of
Amanda G. Halter, Pillsbury,
Jillian Marullo, Pillsbury and
Ashleigh Myers, Pillsbury
Ms. Halter may be contacted at amanda.halter@pillsburylaw.com
Ms. Marullo may be contacted at jillian.marullo@pillsburylaw.com
Ms. Myers may be contacted at ashleigh.myers@pillsburylaw.com
Read the court decisionRead the full story...Reprinted courtesy of
New York City Council’s Carbon Emissions Regulation Opposed by Real Estate Board
July 01, 2019 —
Kristen E. Andreoli - White and William's Taking Care of Business BlogOn April 10, 2019, the New York City Council adopted Intro No. 1253 – the largest effort in a series of bills known as the Climate Mobilization Act. Intro No. 1253 enacts new regulations to reduce the city’s current largest source of carbon emissions – the operation of buildings.
Jared Brey, in his April 25, 2019 article in U.S. News and World Report, “How an Evolving Movement Pushed NYC to Address the Climate Crisis,” states that “[i]n the city, around 70% of carbon emissions are produced by buildings, and around half of all building emissions are produced by just 2% of structures larger than 25,000 square feet that are covered by the bill.”
The level of development, population density and relative economic power of a city such as New York have made this bill particularly interesting to other jurisdictions around the globe which may be considering their own similar legislation. In his article, Brey cites David Miller, a former mayor of Toronto and the North American regional director for C40, a group of cities coordinating strategies to meet the goals of the Paris Agreement:
“I think what New York has done is globally significant … It’s really a huge step forward, using the city’s powers and influence to directly address a huge source of greenhouse gas emissions without waiting for the national government or the international community to act.”
Several other jurisdictions have already begun to approach this issue, generally either by passing bills or creating task forces to further investigate how to meet stated emissions reduction goals. In 2018, Governor Jerry Brown of California signed an executive order with a stated goal of net-zero carbon emissions within the state by the year 2045. The California State Assembly subsequently passed a bill creating a task force to investigate the potential to reduce the emission of greenhouse gasses by both commercial and residential buildings by 2030, although their plan is not due until January 1, 2021. The city of San Jose has implemented new building standards for all new residential buildings to be net-carbon neutral by 2020, and all new commercial buildings must be so by 2030.
Read the court decisionRead the full story...Reprinted courtesy of
Kristen E. Andreoli, White and Williams LLPMs. Andreoli may be contacted at
andreolik@whiteandwilliams.com
Policy's Operation Classification Found Ambiguous
May 21, 2014 —
Tred R. Eyerly – Insurance Law HawaiiProperty damage caused by a subcontractor's sheet piling was found to be within the policy's operation classification, which included "grading of land." Canal Indemn. Co. v. Margaretville of NSM, Inc., No. 13-13541 (11th Cir. April 15, 2014).
Canal issued a CGL policy to the insured. The policy had a classification limitation provision: “This insurance applies to bodily injury, property damage, personal injury, advertising injury or medical expense arising out of only those operations that are classified and shown on the Commercial General Liability Coverage Declarations . . .”
The policy's Declarations, in turn, referred to the operation classification as "Grading of Land - INCL. Borrowing, Filling or Back Filling." The policy did not define these terms.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
L.A.’s Modest Solution to the ‘Missing Middle’ Housing Problem
May 24, 2021 —
Kriston Capps - BloombergPractical ideas aren’t often the stuff of architecture contests. Right off the bat, that set Los Angeles’s Low-Rise design challenge apart.
A project led by the mayor’s office and the city’s chief design officer, Christopher Hawthorne, Low-Rise asked entrants to reimagine what an L.A. urban landscape with abundant housing could look like in the years to come. The organizers wanted the participating designers to think about their submissions the way they might approach a project for a local client or community. The results, which were unveiled this week, don’t look like future-forward science fiction, but rather doable local solutions to a thorny problem: the stubborn lack of affordable options across the city.
Read the court decisionRead the full story...Reprinted courtesy of
Kriston Capps, Bloomberg
Montana Supreme Court: Insurer Not Bound by Insured's Settlement
December 02, 2019 —
K. Alexandra Byrd - Saxe Doernberger & Vita, P.C.In Draggin’ Y Cattle Co., Inc. v. Junkermier, et al.1 the Montana Supreme Court held that where an insurer defends its insured and the insured subsequently settles the claims without an insurer’s participation, a court may approve the settlement as between the underlying plaintiff and underlying defendant, but the settlement will not be presumed reasonable as to the insurer. Therefore, an insurer who defends its insured cannot be bound by a stipulated settlement that the insurer did not expressly consent to.
The case involved Draggin’ Y Cattle Company (the “Cattle Company”), a ranching and cattle business that utilized the services of an accounting firm, Junkermier, Clark, Campanella, Stevens, P.C. (“Junkermier”), to structure the sale of real property to take advantage of favorable tax treatment. It was discovered that Junkermier’s employee misinformed the Cattle Company’s owners of the tax consequences of the sale. The Cattle Company’s owners subsequently filed suit against Junkermier and its employee and alleged nearly $12,000,000 in damages due to the error. Junkermier’s insurer, New York Marine, provided a defense for Junkermier and its employee.
The Cattle Company’s owners offered to settle the claims against Junkermier and its employee for $2,000,000, the policy limit of the New York Marine policy. New York Marine refused to give its consent or tender the policy’s limit. Subsequently, Junkermier, its employee, and the Cattle Company entered into their own settlement agreement for $10,000,000. The settlement was contingent upon a reasonableness hearing to approve the stipulated agreement.
Read the court decisionRead the full story...Reprinted courtesy of
K. Alexandra Byrd, Saxe Doernberger & Vita, P.C.Ms. Byrd may be contacted by
kab@sdvlaw.com
The Top 10 Changes to the AIA A201: What You Need to Know
May 24, 2018 —
Christopher G. Hill - Construction Law MusingsFor this week’s Guest Post Friday here at Musings, we welcome back Melissa Dewey Brumback. Melissa is a construction law attorney with Ragsdale Liggett in Raleigh, North Carolina. Aside from the fact that she is a UNC grad and fan, she’s okay!
In 2017, as it does every ten years, the American Institute of Architects (AIA) updated most of its standard form contract documents, including the A201 General Conditions. This cycle, the contract changes are evolutionary in nature, not revolutionary. Even so, it is crucial to know the changes to avoid making a fatal mistake that could cost you money on a construction project. In reverse order, the top 10 changes you need to know include:
# 10: Differing Site Conditions
Prior editions of the A201 provided that upon encountering differing site conditions, the Contractor was to promptly provide notice to the Owner and Architect, before the conditions are disturbed, and in no event later than 21 days after the conditions were first observed. A201–2017 shortens the time for notice from 21 to 14 days.
Read the court decisionRead the full story...Reprinted courtesy of
Christopher G. Hill, The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Washington Court Tunnels Deeper Into the Discovery Rule
July 09, 2019 —
Lian Skaf - The Subrogation StrategistOften times, properly analyzing when a statute of limitations begins to run – not just how long it runs – is crucial to timely pleading. In Dep’t of Transp. v. Seattle Tunnel Partners, 2019 Wash.App. LEXIS 281 (Was. Ct. App. Feb. 5, 2019), Division Two of the Court of Appeals of Washington addressed when the discovery rule starts the statute of limitations clock on a negligence cause of action. The court held that the statute of limitations begins to run when the plaintiff knows that the factual elements of the claim against the defendant exist. The clock starts to run even if the plaintiff wants to investigate the possibility of other contributing factors or the defendant identifies opposing viewpoints on the theory of the claim.
In this matter, the Washington State Department of Transportation (WSDOT) contracted with an engineering firm, WSP USA, Inc. (WSP), for an evaluation of the Alaskan Way Viaduct in 2001. As part of this project, WSP retained the services of Shannon and Wilson (S&W), another engineering firm, to conduct geological profile logs, groundwater-pumping tests, and prepare technical memoranda. In 2002, WSP and S&W installed a pumping well with an eight-inch steel casing (TW-2). In 2009, apparently based on the work done by WSP and S&W, WSDOT determined that a bored underground tunnel was the best option for replacing the viaduct.
Read the court decisionRead the full story...Reprinted courtesy of
Lian Skaf, White and Williams LLPMr. Skaf may be contacted at
skafl@whiteandwilliams.com
Labor Shortage Confirmed Through AGC Poll
November 26, 2014 —
Craig Martin – Construction Contractor AdvisorOver 1,000 contractors participated in Associated General Contractors’ (“AGC”) survey asking whether they were facing a labor shortage. AGC crunched the numbers and provided an Analysis of its survey.
The survey revealed that 83% of construction firms were having trouble finding qualified workers. This survey certainly confirmed comments from construction firms in and around Omaha.
Read the court decisionRead the full story...Reprinted courtesy of
Craig Martin, Lamson, Dugan and Murray, LLPMr. Martin may be contacted at
cmartin@ldmlaw.com