Ninth Circuit Construes Known Loss Provision
August 19, 2015 —
Tred R. Eyerly – Insurance Law HawaiiThe Ninth Circuit reversed the district court's award of summary judgment to the insurer after analyzing the known loss provision in the insured subcontractor's policy. Kaady v. Mid-Continent Cas. Co., 2015 U.S. App. LEXIS 10754 (9th Cir. June 25, 2015).
The insured was awarded a subcontract to install manufactured stone at the residential project. The stone was affixed to the wall sheathing. The insured also wrapped deck posts with manufactured stone and installed masonry caps on the toe of the stone that was wrapped around the deck posts.
After construction was completed, the insured was called back to the project to inspect cracks in the manufactured stone and masonry caps he installed. The insured told the general contractor that the cracks were likely due to settling. Three months after inspecting the cracks, the insured purchased a CGL policy from Mid-Continent.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Pulled from the Swamp: EPA Wetland Determination Now Judicially Reviewable
September 15, 2016 —
CDJ STAFFLandowners and developers bogged in an EPA wetland determination were recently thrown a life line when the United States Supreme Court determined The Army Corps of Engineer’s (Corps) “jurisdictional determinations” (JD) regarding wetland designations are reviewable by the court. United States Army Corps of Engineers v. Hawkes Co. Inc.
Under the Clean Water Act (CWA) landowners and developers who do not have the proper permits can face severe criminal and civil penalties for releasing any pollutant into “the waters of the United States.” Anybody stuck wading through the permitting process will tell you it is difficult, time consuming, expensive, and may eventually prohibit the intended use of the property. Furthermore, there is yet to be a consensus on the definition or scope of the term “waters of the US”. Consequently, a landowners or developers may never be certain whether a permit is necessary before conducting any activity that may discharge a pollutant into a “water of the United States”.
Read the court decisionRead the full story...Reprinted courtesy of
Sean Minahan, Lamson, Dugan and Murray, LLPMr. Minahan may be contacted at
sminahan@ldmlaw.com
Economic Loss Rule Bars Claims Against Manufacturer
November 02, 2020 —
David Adelstein - Florida Construction Legal UpdatesThe economic loss rule lives to bar a claim against a product manufacturer in a real estate transaction. In a products liability action, there needs to be personal injury or property damage, other than to the property itself, in order to recover economic damages. Otherwise, the economic loss rule will bar the recovery of such economic losses when the economic losses deal to the product itself. This is important to keep in mind in any product liability action against a manufacturer.
In a recent case, 2711 Hollywood Beach Condominium Assoc’n, Inc., v. TRG Holiday, Ltd., 45 Fla. L. Weekly D2179a (Fla. 3d DCA 2020), a condominium association purchased the condominium from the developer. Subsequently, it noticed leaks with the fire suppression system in the condominium and sued multiple parties for damages for repairs due to the leaks and the replacement of the fire suppression system. One of the parties sued in negligence and strict liability was a manufacturer of pipe fittings used in the fire suppression system. The manufacturer moved for summary judgment based on the economic loss rule and relying on the 1993 Florida Supreme Court opinion in Casa Clara Condominium Assoc’n v. Charley Toppino & Sons, Inc., 620 So.2d 1244 (Fla. 1993), holding “the economic loss rule limited a defendant’s tort liability for allegedly defective products to injuries caused to persons or damage caused to property other than the defective product itself.” 2711 Hollywood Beach Conominium Assoc’n, supra. The trial court agreed with the manufacturer and granted summary judgment. On appeal, the Third District affirmed based on the economic loss rule:
The Association bargained for, purchased and received a building; [the manufactuer’s] fittings were only a component of the FSS [fire suppression system], incorporated into the building. Applying the rule set forth in Casa Clara, the Association purchased a completed building from the developer. [The manufactuer’s] fittings were “an integral part of the finished product and, thus, did not injure ‘other’ property.” Injury to the building itself is not injury to “other” property because the product purchased by the Association was the building. See Casa Clara, 620 So. 2d at 1247. The economic loss rule therefore bars the Association’s recovery as to [the manufacturer] to the extent that it sought damages to replace the FSS [fire suppression system] and repair damage to the building.
2711 Hollywood Beach Conominium Assoc’n, supra (internal citations omitted).
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Court Finds No Occurrence for Installation of Defective flooring and Explains Coverage for Attorney Fee Awards
January 05, 2017 —
Christopher Kendrick & Valerie A. Moore – Haight Brown & Bonesteel LLPIn Navigators Specialty Ins. Co. v. Moorefield Const. (No.G050759, filed 12/27/16), a California appeals court held that the knowing installation of flooring over a vapor-emitting slab was not an accident or occurrence, entitling the insurer to reimbursement of money paid as damages to settle a construction defect suit. But the court further held that there was no right of reimbursement for the portion of money payable under the policy’s supplementary payments coverage as costs for contractual prevailing party attorney’s fees.
Navigators insured Moorefield, the general contractor for a Best Buy store. Testing in construction revealed a vapor emission rate from the concrete slab above the approved standard for the flooring. The contractor’s personnel testified that it was normal to install the flooring regardless. Notwithstanding, the contractor’s personnel testified that they consulted the owner and were directed to proceed. In doing so, the contractor also expressly released the flooring subcontractor from any warranty claims.
Reprinted courtesy of
Christopher Kendrick, Haight Brown & Bonesteel LLP and
Valerie A. Moore, Haight Brown & Bonesteel LLP
Mr. Kendrick may be contacted at ckendrick@hbblaw.com
Ms. Moore may be contacted at vmoore@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Wildfire Insurance Coverage Series, Part 2: Coverage for Smoke-Related Damages
July 03, 2022 —
Scott P. DeVries & Yosef Itkin - Hunton Insurance Recovery BlogFor many policyholders, smoke emanating from wildfire causes as much if not more damage than the fire itself. In this post in the Blog’s Wildfire Insurance Coverage Series, we discuss damages caused by smoke emanating from wildfires.
Some insurers argue that policies are limited to fire damage to the insured property and do not include smoke damage associated with nearby fires. A treatise frequently cited by insurers states otherwise: “The concept that fire insurance covers non-fire damage which is the proximate result of fire finds application also when the fire occurs on other property and causes harm to the insured property. In such case, the harm to the insured property, even though it is a non-fire harm, has long been recognized to be the result of fire, and, therefore, within the policy coverage.”
[1]
Reprinted courtesy of
Scott P. DeVries, Hunton Andrews Kurth and
Yosef Itkin, Hunton Andrews Kurth
Mr. DeVries may be contacted at sdevries@HuntonAK.com
Mr. Itkin may be contacted at yitkin@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
Force Majeure Under the Coronavirus (COVID-19) Pandemic
March 08, 2021 —
Lindsay T. Watkins - Ahlers Cressman & Sleight PLLCAs COVID-19 disrupts work and life as we know it, the question many contractors have is what protections are available against the inevitable project impacts and delays? Generally, construction contracts require a contractor to timely perform work until project completion or potentially face damages (liquidated or actual) and possible termination. When events occur, however, that are beyond our control (such as a national pandemic), it is important to review and understand what contract provisions or avenues are available for potential relief.
1.
Review Your Contract For A Force Majeure Provision.
A
“force majeure” contract provision is commonly included in construction contracts, service agreements, purchase orders, etc. It typically covers events or conditions that can be neither anticipated nor controlled. These provisions, however, will vary greatly from contract to contract and may not include the language “force majeure” but rather may be included in general delay or impact clauses. For example, some common provisions include:
- Washington State Department of Transportation Clause (2018 Standard Specifications for Road, Bridge and Municipal Construction): The Contractor shall rebuild, repair, restore, and make good all damages to any portion of the permanent or temporary Work occurring before the Physical Completion Date and shall bear all the expense to do so, except damage to the permanent Work caused by: (a) acts of God, such as earthquake, floods, or other cataclysmic phenomenon of nature, or (b) acts of the public enemy or of governmental authorities; or (c) slides in cases where Section 2-03.3(11) is applicable; Provided, however, that these exceptions shall not apply should damages result from the Contractor’s failure to take reasonable precautions or to exercise sound engineering and construction practices in conducting the Work.
Read the court decisionRead the full story...Reprinted courtesy of
Lindsay T. Watkins, Ahlers Cressman & Sleight PLLCMs. Watkins may be contacted at
Lindsay.Watkins@acslawyers.com
Greg Dillion & Newmeyer Dillion Named 2019 Good Scout Award Recipient
November 24, 2019 —
Newmeyer DillionNewmeyer Dillion, a prominent business and real estate law firm, today announced Greg Dillion and the firm were named the 2019 Good Scout Award recipient by the Boy Scouts of America, Orange County Council. Dillion and the firm were recognized at the 38th annual Construction Industry Luncheon on November 18th at Hotel Irvine in Irvine, CA. The award is given to individual/company in recognition of their outstanding character, leadership in their industry and commitment to their community.
"When reviewing the 12 points of the Scout's law, with each point as a goal for every Scout to live up to, the two that stand out the most for me that Greg embodies are that Greg is 'helpful' and Greg is 'brave,'" says Newmeyer Dillion's Managing Partner Paul Tetzloff, who served as Master of Ceremonies for this year's award.
"Greg has the instantaneous willingness to help, and he will make the time to help even when he has no time to do so. Greg never runs and he never backs down. He is the person that we look up to. He never hesitates, and he never blames. He only moves forward. I've been blessed in my life to be around and influenced by some tremendous leaders. Greg is the real deal. The Boy Scouts could not have picked a better man to honor."
Greg Dillion is a founding partner of Newmeyer Dillion. Established 35 years ago, the firm has grown from three attorneys to over 70 in three offices. Along with an active trial and appellate public and private practice, Dillion represents residential and commercial developers and other businesses in complex and high stakes business, insurance, real estate and construction disputes. He also advises on insurance policy placement and review; risk avoidance, transfer and management; and alternative dispute resolution methods, techniques and enforceability.
Dillion is active in the community in which he serves, as a supporter of numerous charities and non-profit organizations like the American Cancer Society, Boys Scouts of America, The City of Hope, Interval House, Joyful Child, The Catalina Conservancy, Orangewood Foundation, The Shea Center, The Catalina Cowboy Heritage Foundation and more. He currently sits on the Board for the Surfing Heritage & Culture Center and the Los Caballeros.
Learn More:
https://www.newmeyerdillion.com/gregory-l-dillion/
https://vimeo.com/374510243/a587df2eaa
About Newmeyer Dillion
For 35 years, Newmeyer Dillion has delivered creative and outstanding legal solutions and trial results for a wide array of clients. With over 70 attorneys practicing in all aspects of corporate, employment, real estate, privacy & data security and insurance law, Newmeyer Dillion delivers legal services tailored to meet each client's needs and takes an integrated and holistic approach to its legal representation that propels each clients' vision, mission, culture, operations, peace of mind and bottom line. Headquartered in Newport Beach, California, with offices in Walnut Creek, California and Las Vegas, Nevada, Newmeyer Dillion attorneys are recognized by The Best Lawyers in America©, and Super Lawyers as top tier and some of the best lawyers in California, and have been given Martindale-Hubbell Peer Review's AV Preeminent® highest rating. For additional information, call 949.854.7000 or visit www.ndlf.com.
Read the court decisionRead the full story...Reprinted courtesy of
Practical Pointers for Change Orders on Commercial Construction Contracts
December 31, 2014 —
John E. Bowerbank - Newmeyer & DillionConstruction projects pose unique challenges, including keeping costs within budget, meeting project deadlines, and coordinating the work of numerous contractors and subcontractors in the wake of inevitable design revisions and changes to the plans. Anticipating potential project challenges and negotiating contract provisions before commencing work on a project is critical for all parties. Careful planning should reduce the number of contract disputes. This, in turn, can facilitate the completion of a project within budget and on schedule.
“Changes” Clauses in Construction Contracts
Most commercial construction contracts have a clause addressing changes to the contract. A “changes” clause typically requires the mutual agreement of the parties on the scope of any modifications to the contract, as well as the effect on the contract price and timeframe for the work to be performed. This results in what is generally referred to as a “change order.” Many projects have a large number of change orders, which can result in significant cost overruns and delays to the project if the contract contains a complicated change order process. Therefore, in order to minimize cost overruns and project delays, it is crucial to keep the change order process as simplified and streamlined as possible.
In the most basic terms, change orders memorialize modifications to the original contract, and typically alter the contract's price, scope of work, and/or completion dates. A typical change order is a written document prepared by the owner or its design professional, and signed by the owner, design professional, and affected contractors and subcontractors. An executed change order indicates the parties’ agreement as to what changes are taking place, including approval for additional costs and schedule impacts.
While the reasons for change orders and the parties initiating them may vary, all change orders have one feature in common. Effective change orders alter the original contract and become part of the contract. Therefore, from a legal standpoint, change orders must be approached with the same caution and forethought as the original contract.
Practice Pointers for Change Orders
In light of the foregoing, some practice pointers for change orders in commercial construction contracts are as follows:
- Carefully Negotiate and Draft Change Order Provisions in the Original Contract.
A carefully negotiated and drafted “changes” clause that accounts for “unexpected circumstances” or “hidden conditions” can protect the parties from downstream costly disputes.
- Immediately Address Changes by Following the Change Order Process, Including Obtaining Necessary Signatures.
Regardless if you are an owner, general contractor or subcontractor, you should address any proposed change order immediately. Even if a decision maker gives “verbal” approval to go ahead with changed work, the work should not proceed without following the change order process in the original contract. This includes making sure to obtain any necessary signatures for the change order, if at all possible.
- Analyze the Plans and Specifications to Determine Whether “Changes” are Within the Scope of the Original Contract, or Whether They are Extra Work.
Prior to entering an original contract, it is imperative that the parties review the plans and specifications for ambiguities regarding work included in the original contract, versus potential extra work that would require a change order. This is important because a careful review of the plans and specifications sometimes reveals that work believed to be a change order is, in fact, original work, or vice versa.
- Make Sure Requests and Approvals for Change Orders are Done by an Authorized Representative.
When a party requests or gives its approval to a change order, it is important to confirm the request or approval came from an authorized representative.
- Avoid Vague and Open-Ended Change Orders.
Indeed, the vaguer a change order, the more likely it can lead to a dispute. Vague and open-ended change orders, including change orders that provide for payment on a time and materials basis, can be difficult for an owner to budget and schedule. This can lead to disputes as to cost and/or time extensions.
- Oral Assurances for Payment Without a Signed Change Order May Not Be Recoverable.
When a party provides verbal assurances to another party for extra work without following the change order process, there is a much higher likelihood that disputes will occur. Although there is case law that may allow a contractor to recover for extra work in private contracts based on oral promises, the parties should avoid placing themselves in such a legal position. Notably, in public contracts, a contractor may not be able to recover for any extra work without a signed changed order, even with verbal assurances of payment from the owner.
About the Author:
John E. Bowerbank, Newmeyer & Dillion
Mr. Bowerbank is a partner in the Newport Beach office and practices in the areas of business, insurance, real estate, and construction litigation. You can reach John at john.bowerbank@ndlf.com
Read the court decisionRead the full story...Reprinted courtesy of