Eleventh Circuit Finds No Coverage for Faulty Workmanship Claims
November 15, 2021 —
Tred R. Eyerly - Insurance Law HawaiiThe Eleventh Circuit affirmed the district court's grant of summary judgment to the insurer on the general contractor's claims for damages due to faulty workmanship. Tricon Dev. of Brevard v. Nautilus Ins. Co., 2021 U.S. App. LEXIS 27317 (11th Cir. Sept .10, 2021).
Tricon was the general contractor for a condominium project in Florida. Tricon hired a subcontractor to fabricate and install metal railings for the project. The subcontractor was insured by Nautilus under two CGL policies. The policies had endorsements to add Tricon as an additional insured.
The subcontractor fabricated some of the railings, but they had defects and damage. Further they were not installed properly and did not meet the project's specifications. Tricon found another manufacturer to fabricate new railings to satisfy the projects' requirements. Tricon agreed to pay the cost of removing the subcontractor's railings and fabricating and installing new ones. If submitted a claim to Nautilus to cover these costs.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Property Owner’s Defense Goes Up in Smoke in Careless Smoking Case
September 23, 2019 —
Michael J. Ciamaichelo - The Subrogation StrategistProperty owners owe a duty of reasonable care to avoid causing harm to neighboring properties. When a property owner knows or should know about a condition that poses a risk of danger to neighboring properties, the property owner must exercise reasonable care to make the condition safe. The Court of Special Appeals of Maryland recently held that, where hundreds of discarded cigarette butts had accumulated in a bed of mulch over an extended period of time prior to the fire at issue, the owner of the property with the mulch beds owed a duty of care to its neighbors to prevent a foreseeable fire.
In Steamfitters Local Union No. 602 v. Erie Insurance Exchange, 2019 Md. App. LEXIS 430 (May 30, 2019), a fire originated in a strip of mulch at property owned by the Steamfitters Local Union No. 602 (Union) and caused damage to neighboring properties. The fire occurred when an unknown person discarded a cigarette butt into the mulch. Following the fire, investigators found “hundreds, if not thousands of cigarettes” in the mulch where the fire originated. A representative for the Union acknowledged that there were more butts in the mulch “than there should have been” and that, “[i]n the right situation,” a carelessly discarded cigarette could cause a fire. The Union, however, had no rules or signs to prohibit or regulate smoking at the property, where apprentices would often gather prior to class.
The insurance companies for the damaged neighbors filed subrogation actions alleging that the Union, as the property owner, failed to use reasonable care to prevent a foreseeable fire. A jury found in favor of the subrogating insurers and against the Union.
Read the court decisionRead the full story...Reprinted courtesy of
Michael J. Ciamaichelo, White and Williams LLPMr. Ciamaichelo may be contacted at
ciamaichelom@whiteandwilliams.com
Roof Mounted Solar Panels: Lower Your Risk of Fire
September 25, 2023 —
The Hartford Staff - The Hartford InsightsAs the federal government, individual states, businesses and consumers take steps to address climate change, the use of renewable energy – including roof-mounted solar panels – has steadily increased. Over the past decade, the use of solar energy solutions has grown by 33% annually. This is driven by tax-based incentives for clean energy, combined with installation costs that are down more than 50% from 10 years ago.1
As more companies execute climate-focused goals to limit greenhouse emissions, reduce their carbon-footprint and lower energy costs, the use of solar power for commercial buildings is likely to increase. Currently, it's estimated that only 3.5% of commercial buildings have rooftop solar panels, but 70% are potential targets for solar.2
We know the use of solar power can have positive impacts on the environment and generate long-term energy cost savings. However, there are several considerations and potential risks that commercial property owners and facilities managers should consider prior to investing in solar, says Tracey Greene, underwriting director for Middle and Large Commercial Real Estate at The Hartford.
Read the court decisionRead the full story...Reprinted courtesy of
The Hartford Staff, The Hartford Insights
No Bond, No Recovery: WA Contractors Must Comply With WA Statutory Requirements Or Risk Being Barred From Recovery If Their Client Refuses To Pay
September 18, 2018 —
Joshua Lane - Ahlers Cressman & Sleight PLLCThe risk that a contractor’s client may refuse to pay the full contract balance is a day-to-day reality for every contractor. That risk – and the stress it causes in the mind of any contractor – is tempered by the knowledge that Washington statutes provide contractors with ready access to the courts to file a lawsuit and be fully compensated for the work performed. But a recent case provides a grim reminder that the same statutes that giveth court access can also taketh away.
Washington’s Contractor Registration Act (“WCRA”)[1] requires every contractor engaging or offering to engage in services in Washington to register with the Department of Labor and Industries (”L&I”). In order to sue to collect compensation for work or to enforce a contract, a contractor must prove that he/she “was a duly registered contractor and held a current and valid certificate of registration at the time he or she contracted for the performance of such work or entered into such contract.”[2] In order to conclude that a contractor has substantially comply with these requirements, a court must find that:
(1) The department has on file the information required by RCW 18.27.030; (2) the contractor has at all times had in force a current bond or other security as required by RCW 18.27.040; and (3) the contractor has at all times had in force current insurance as required by RCW 18.27.050.[3]
Read the court decisionRead the full story...Reprinted courtesy of
Joshua Lane, Ahlers Cressman & Sleight PLLCMr. Lane may be contacted at
joshua.lane@acslawyers.com
A Survey of Trends and Perspectives in Construction Defect Decisions
November 27, 2013 —
CDJ STAFFThomas F. Segella, Ellen H. Greiper, and Matthew S. Lerner, partners at the firm Goldberg Segalia, together with Suzin L. Raso, an associate of the firm, have prepared a wide-ranging survey of cases, in their commentary, “Emerging Trends and Changing Perspectives on Construction Defect Claims.
The authors examine 11 coverage cases, representing decisions from eight states, and 15 cases of litigation, here covering 11 states. In each case, they give a one-sentence summary, a further discussion of the case, and they end with a practice note.
They start with Alabama, noting that the court found that “faulty workmanship is not an occurrence,” looking at the recent case of Owners Insurance Co. v. Jim Carr Homebuilders, LLC. Here they note that under Alabama law, “there was no damage to personal property or property of others; therefore, there was no ‘occurrence.’” They also note that “the policy involved did not contain a ‘subcontractor exception.’”
In Georgia, they noted, the courts concluded that “damage to insured’s completed work is an ‘occurrence.’” Here they cite a recent decision of the Georgia Supreme Court, noting that the court looked at cases from Connecticut, South Carolina, Illinois, Texas, as well as the Fourth and Tenth Circuits.
Under litigation, they look at such aspects of construction defect litigation such as the application of the economic loss doctrine in Kansas and Florida, and how the courts view arbitration agreements in states including New Jersey, Louisiana, and Colorado.
Read the court decisionRead the full story...Reprinted courtesy of
Update Regarding New York City’s Climate Mobilization Act (CMA) and the Reduction of Carbon Emissions in New York City
July 05, 2021 —
Caroline A. Harcourt, Natalie S. Starkman & Nika Bederman - Gravel2Gavel Construction & Real Estate Law BlogIn a previous post, we described how the New York City Climate Mobilization Act, 2019 (the CMA, or Local Laws 92, 94, 95, 96, 97, and 147 enacted in 2019) was passed with the goal of reducing New York City’s carbon emissions by 40 percent by 2030 and by 80 percent by 2050 (as against a 2005 baseline as provided for in item 3 of Local Law 97). It is the most ambitious building emissions law to be enacted by any city in the world. The CMA impacts “Covered Buildings” (described below) and, besides contemplating the retrofitting of Covered Buildings to achieve energy efficiency and establishing a monitoring program for Covered Buildings, the CMA contemplates compliance by means of the purchase of carbon offset credits or renewable energy. (Note the new NYC Accelerator program, launched in 2012 by the Mayor’s Office of Sustainability, provides guidance regarding energy-efficient upgrades to properties and emission reductions.)
Pursuant to the CMA:
- Beginning in 2024, Covered Buildings will have to meet the first emission targets, which are calculated by multiplying the gross floor area of each Covered Building by the occupancy classification as set forth in Local Law 97; and
- In 2025, owners of Covered Buildings will need to establish compliance by submitting a report establishing such compliance (prepared by a certified design professional) to the newly created Office of Building Energy and Emissions Performance.
Read the court decisionRead the full story...Reprinted courtesy of
Caroline A. Harcourt, PillsburyMs. Harcourt may be contacted at
caroline.harcourt@pillsburylaw.com
EPA Will Soon Issue the Latest Revision to the Risk Management Program (RMP) Chemical Release Rules
February 10, 2020 —
Anthony B. Cavender - Gravel2GavelOn November 21, 2019, EPA released a pre-publication copy of its Reconsideration of the revised Risk Management Program (RMP) Rules. In an accompanying statement, the agency noted that it has taken steps to “modify and improve” the existing rule to remove burdensome, costly and unnecessary requirements while maintaining appropriate protection (against accidental chemical releases) and ensuring responders have access to all of the necessary safety information. This action was taken in response to EPA’s January 13, 2017 revisions that significantly expanded the chemical release prevention provisions the existing RMP rules in the wake of the disastrous chemical plant explosion in West, Texas. The Reconsideration will take effect upon its publication in the Federal Register.
Background
As recounted by the D. C. Circuit in its August 2018 decision in the case of Air Alliance Houston, et al. v. EPA, in 1990, the Congress amended the Clean Air Act to force the regulation of hazardous air pollutants (see 42 USC Section 7412). An initial list of these hazardous air pollutants was also published, at Section 7412 (b). Section 112(r) (codified at 42 USC Section 7412 (r)), authorized EPA to develop a regulatory program to prevent or minimize the consequences of a release of a listed chemical from a covered stationary source. EPA was directed to propose and promulgate release prevention, detection, and correction requirements applicable to stationary sources (such as plants) that store or manage these regulated substances in amounts determined to be above regulated threshold quantities. EPA promulgated these rules in 1996 (see 61 FR 31668). The rules, located at 40 CFR Part 68, contain several separate subparts devoted to hazard assessments, prevention programs, emergency response, accidental release prevention, the development and registration of a Risk Management Plan, and making certain information regarding the release publicly available. EPA notes that over 12.000 RMP plans have been filed with the agency.
In January 2017, in response to the catastrophe in West, EPA issued substantial amendments to these rules, covering accident prevention (expanding post-accident investigations, more rigorous safety audits, and enhanced safety training), revised emergency response requirements, and enhanced public information disclosure requirements. (See 82 FR 4594 (January 13, 2017).) However, the new administration at EPA, following the submission of several petitions for reconsideration of these revised rules, issued a “Delay Rule” on June 14, 2017, which would have extended the effective date of the January 2107 rules until February 19, 2019. On August 17, 2018, the Delay Rule was rejected and vacated by the D.C. Circuit in the aforementioned Air Alliance case (see 906 F. 3d 1049 (DC Circuit 2018)), which had the effect of making the hotly contested January 2017 RMP revisions immediately effective.
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com
Legal Implications of 3D Printing in Construction Loom
July 10, 2018 —
Aldo E. Ibarra - Engineering News-RecordImagine a printer in the middle of a construction site programmed with a designer’s plans and specifications to build an entire home from scratch. As concrete is fed into the printing device, a technician hits enter on her computer and a 3D printer starts fabricating the structure’s walls and roof.
Read the court decisionRead the full story...Reprinted courtesy of
Aldo E. Ibarra, ENRENR staff may be contacted at
ENR.com@bnpmedia.com