Tennessee Court: Window Openings Too Small, Judgment Too Large
November 18, 2011 —
CDJ STAFFThe Tennessee Court of Appeals has issued a ruling in the case of Dayton v. Ackerman, upholding the decision of the lower court, even as they found that the award was incorrectly computed. The Daytons purchased a house that had been designed and built by the Ackermans, who operated a construction business. The court noted that the warranty with the house promised that “for a period of 60 days, the following items will be free of defects in materials or workmanship: doors (including hardware); windows; electric switches; receptacles; and fixtures; caulking around exterior openings; pluming fixtures; and cabinet work.”
Soon, the Daytons began to experience problems with the house. Many were addressed by the Ackermans, but the Daytons continued to have problems with the windows. Neither side could specify a firm date when the Ackermans were contacted by the Daytons about the window problems. The Ackermans maintained that more than two years passed before the Daytons complained about the windows. The lower court found the Daytons more credible in this.
Initially, the Daytons included the window manufacturer in their suit, but after preliminary investigations, the Daytons dropped Martin Doors from their suit. Martin Doors concluded that the windows were improperly installed, many of them “jammed into openings that were too small for them.”
After the Daytons dismissed Martin Doors, the Ackermans sought to file a third party complaint against them. This was denied by the court, as too much time had elapsed. The Ackermans also noted that not all of the window installations were defective, however, the courts found that the Daytons ought not to have mismatched windows.
Unfortunately for the Daytons, the window repair was done incorrectly and the windows were now too small for the openings. The firm that did the repair discounted the windows and Daytons concealed the problem with plantation shutters, totalling $400 less than the original lowest estimate. However, the appeals court noted that it was here that the trial court made their computation error. Correcting this, the appeals court assessed the Ackermans $12,016.20 instead of $13,016.20.
Finally, the Ackerman’s expert was excluded as he had changed his testimony between deposition and trial. The trial reviewed the expert’s testimony and had it been admissible, it would not have changed the ruling.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Part II: Key Provisions of School Facility Construction & Design Contracts
July 21, 2018 —
David R. Cook - Autry, Hall & Cook, LLPIn
Part I of this article, published in late April, we discussed the performance risk and time risk involved with construction and design contracts, and in Part II, we will cover cost risk and political risk.
Cost Risk
School budgets are limited for many reasons, and the construction budget is no exception. As a result, contracts should guard against unwarranted cost increases and claims. In the absence of a written change order signed by the appropriate officer, the contract should absolutely prohibit additional compensation for changes in the work. It should forbid claims for all events except those within the school authority’s sole control. Even for permitted claims, the contractor must provide written notice so that the authority might alleviate the problem and control its costs. To encourage the contractor to limit costs and claims, the contract could include a shared-savings clause, which grants an incentive payment for completion within the budget.
Read the court decisionRead the full story...Reprinted courtesy of
David R. Cook, Autry, Hall & Cook, LLPMr. Cook may be contacted at
cook@ahclaw.com
OSHA Finalizes PPE Fitting Requirement for Construction Workers
December 31, 2024 —
Jonathan H. Schaefer - Construction Law ZoneOn December 11, 2024, the Occupational Safety and Health Administration (OSHA) announced it finalized a revision to the personal protective equipment (PPE) standard for the construction industry. The
final rule adds specific language to the existing standard requiring employers to provide properly fitting PPE for construction industry workers. This change aligns the construction industry with the standards in place for the general industry.
According to OSHA, many types of PPE must properly fit workers. Improperly sized PPE can ineffectively protect workers, creating new hazards for them, such as oversized gloves or protective clothing being caught in machinery and discouraging use because of discomfort or poor fit. OSHA stated that the longstanding issue with improperly fitting PPE particularly impacted women, as well as physically smaller or larger workers.
Read the court decisionRead the full story...Reprinted courtesy of
Jonathan H. Schaefer, Robinson+ColeMr. Schaefer may be contacted at
jschaefer@rc.com
Ways of Evaluating Property Damage Claims in Various Contexts
February 18, 2020 —
Bremer Whyte Brown & O'Meara LLPPotential damages in a lawsuit may come in many forms depending on the facts of the case. Common damages include medical expenses, loss of earnings, property loss, physical pain, and mental suffering. Of the many damages Plaintiffs may claim, one of the most prevalent and recognizable is property damage. This article briefly discusses these types of damages which fall under two major categories – Real Property and Personal Property.
Broadly speaking, “real property” means land, and “personal property” refers to all other objects or rights that may be owned. Ballentine’s Law Dictionary defines “real property” as: “Such things as are permanent, fixed, and immovable; lands, tenements, and hereditaments of all kinds, which are not annexed to the person or cannot be moved from the place in which they subsist. . . .” (Ballentine’s Law Dict. (3d ed. 2010).) “Personal property” is defined as: “Money, goods, and movable chattels . . . . All objects and rights which are capable of ownership
except freehold estates in land, and incorporeal hereditaments issuing thereout, or exercisable within the same.” (Id. (emphasis added).)
Real Property
Real property may be damaged or “harmed” through trespass, permanent nuisance, or other tortious conduct. The general rule is that Plaintiffs may recover the lesser of the two following losses: (1) the decrease in the real property’s fair market value; or (2) the cost to repair the damage and restore the real property to its pre-trespass condition plus the value of any lost use. (Kelly v. CB&I Constructors, Inc.) However, an exception to this general rule may be made if a Plaintiff has a personal reason to restore the real property to its former condition, sometimes called the “personal reason” exception. In such cases, a Plaintiff may recover the restoration costs even if the costs are greater than the decrease in the real property’s value, though the restoration cost must still be “reasonable” in light of the value of the real property before the injury and the actual damage sustained.
Read the court decisionRead the full story...Reprinted courtesy of
Bremer Whyte Brown & O'Meara LLP
Release Of “Unknown” Claim Does Not Bar Release Of “Unaccrued” Claim: Fair Or Unfair?
July 15, 2019 —
David Adelstein - Florida Construction Legal UpdatesA general release of “unknown” claims through the effective date of the release does NOT bar “unaccrued” claims. This is especially important when it comes to fraud claims where the facts giving rise to the fraud may have occurred prior to the effective date in the release, but a party did not learn of the fraud until well after the effective date in the release. A recent opinion maintained that a general release that bars unknown claims does NOT mean a fraud claim will be barred since the last element to prove a fraud had not occurred, and thus, the fraud claim had not accrued until after the effective date in the release. See Falsetto v. Liss, Fla. L. Weekly D1340D (Fla. 3d DCA 2019) (“The 2014 [Settlement] Agreement’s plain language released the parties only from “known or unknown” claims, not future or unaccrued claims. Because there is a genuine issue of material fact as to whether the fraud claim had accrued — that is, whether Falsetto [party to Settlement Agreement] knew or through the exercise of due diligence should have known about the alleged fraud at the time the 2014 Agreement was executed — the trial court erred in granting summary judgment on those fraud claims.”).
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Engineers Found ‘Hundreds’ of Cracks in California Bridge
January 24, 2014 —
James Nash – Bloomberg NewsEngineers spotted “hundreds” of cracks in welds on parts produced for the San Francisco-Oakland Bay Bridge in 2008 and were encouraged to stay quiet rather than delay the $6.4 billion project, according to a California Senate committee report.
James Merrill, then a senior engineer with a quality assurance company known as Mactec, told Senate investigators that his complaints about work done at Shanghai Zhenhua Heavy Industry Co. Ltd. (900947), known as ZPMC, were rebuffed by managers of the California Department of Transportation as “too rigorous,” according to the report released yesterday.
Read the court decisionRead the full story...Reprinted courtesy of
James Nash, Bloomberg NewsMr. Nash may be contacted at
jnash24@bloomberg.net
PFAS: From Happy Mistake to Ubiquity to Toxic Liability (But is there coverage?)
March 14, 2022 —
Michael S. Levine & Rachel E. Hudgins - Hunton Andrews KurthIn 1938, a DuPont chemist’s experiment yielded not—as he first thought—a lumpen, waxy mistake, but a new chemical with remarkable properties: heat-resistance, chemical stability, and low surface friction. Decades of continuing experimentation yielded a class of chemicals with the capacity to make non-stick, water-resistant coatings. In time, these chemicals, per- and polyfluoroalkyl substances (PFASs), would become a major component in thousands of consumer goods: food packaging, non-stick cookware, waterproof clothing, paint, stain-resistant carpets and furniture, and firefighting foams. The discovery of the toxicity of these remarkable chemicals lagged behind the widespread adoption, but eventually yielded a moniker that reflected PFAS’s stability and longevity: “Forever Chemicals.”
In October 2021, the Biden administration announced
a plan to address, among other concerns, PFAS’s migration to drinking water sources. EPA Administrator Michael S. Regan debuted the plan in Raleigh, North Carolina alongside Governor Roy Cooper.
Reprinted courtesy of
Michael S. Levine, Hunton Andrews Kurth and
Rachel E. Hudgins, Hunton Andrews Kurth
Mr. Levine may be contacted at mlevine@HuntonAK.com
Ms. Hudgins may be contacted at rhudgins@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
Another Smart Home Innovation: Remote HVAC Diagnostics
June 17, 2015 —
Beverley BevenFlorez-CDJ STAFFBuilder magazine reported that “smart home technology manufacturer Nexia Home Intelligence now offers monitoring of a home’s HVAC system even when owners are away. If an issue arises, it can be fixed quickly, sometimes without a service call, the company says.”
The service is available “with Trane and American Standard Wi-Fi-enabled thermostats” and requires a free Nexia account. System alerts are automatically transmitted to the dealer.
Read the court decisionRead the full story...Reprinted courtesy of