BERT HOWE
  • Nationwide: (800) 482-1822    
    Medical building building expert Cambridge Massachusetts institutional building building expert Cambridge Massachusetts industrial building building expert Cambridge Massachusetts multi family housing building expert Cambridge Massachusetts hospital construction building expert Cambridge Massachusetts concrete tilt-up building expert Cambridge Massachusetts Subterranean parking building expert Cambridge Massachusetts structural steel construction building expert Cambridge Massachusetts high-rise construction building expert Cambridge Massachusetts condominiums building expert Cambridge Massachusetts condominium building expert Cambridge Massachusetts production housing building expert Cambridge Massachusetts tract home building expert Cambridge Massachusetts landscaping construction building expert Cambridge Massachusetts housing building expert Cambridge Massachusetts office building building expert Cambridge Massachusetts low-income housing building expert Cambridge Massachusetts mid-rise construction building expert Cambridge Massachusetts retail construction building expert Cambridge Massachusetts parking structure building expert Cambridge Massachusetts townhome construction building expert Cambridge Massachusetts custom homes building expert Cambridge Massachusetts
    Cambridge Massachusetts building code expert witnessCambridge Massachusetts building code compliance expert witnessCambridge Massachusetts stucco expert witnessCambridge Massachusetts engineering expert witnessCambridge Massachusetts architecture expert witnessCambridge Massachusetts civil engineering expert witnessCambridge Massachusetts expert witness roofing
    Arrange No Cost Consultation
    Building Expert Builders Information
    Cambridge, Massachusetts

    Massachusetts Builders Right To Repair Current Law Summary:

    Current Law Summary: Case law precedent


    Building Expert Contractors Licensing
    Guidelines Cambridge Massachusetts

    No state license required for general contracting. Licensure required for plumbing and electrical trades. Companies selling home repair services must be registered with the state.


    Building Expert Contractors Building Industry
    Association Directory
    Builders Association of Central Massachusetts Inc
    Local # 2280
    51 Pullman Street
    Worcester, MA 01606

    Cambridge Massachusetts Building Expert 10/ 10

    Massachusetts Home Builders Association
    Local # 2200
    700 Congress St Suite 200
    Quincy, MA 02169

    Cambridge Massachusetts Building Expert 10/ 10

    Builders Association of Greater Boston
    Local # 2220
    700 Congress St. Suite 202
    Quincy, MA 02169

    Cambridge Massachusetts Building Expert 10/ 10

    North East Builders Assn of MA
    Local # 2255
    170 Main St Suite 205
    Tewksbury, MA 01876

    Cambridge Massachusetts Building Expert 10/ 10

    Home Builders and Remodelers Association of Western Mass
    Local # 2270
    240 Cadwell Dr
    Springfield, MA 01104

    Cambridge Massachusetts Building Expert 10/ 10

    Bristol-Norfolk Home Builders Association
    Local # 2211
    65 Neponset Ave Ste 3
    Foxboro, MA 02035

    Cambridge Massachusetts Building Expert 10/ 10

    Home Builders & Remodelers Association of Cape Cod
    Local # 2230
    9 New Venture Dr #7
    South Dennis, MA 02660

    Cambridge Massachusetts Building Expert 10/ 10


    Building Expert News and Information
    For Cambridge Massachusetts


    Housing Starts Rebound in U.S. as Inflation Eases: Economy

    Why Biden’s Infrastructure Plan Is a Green Jobs Plan

    Scientists Are Trying to Make California Forests More Fire Resilient

    Seeking the Urban Lifestyle in the Suburbs

    Latest Updates On The Coronavirus Pandemic

    Poor Pleading Leads to Loss of Claim for Trespass Due to Relation-Back Doctrine, Statute of Limitations

    Fourth Circuit Confirms Scope of “Witness Litigation Privilege”

    Safety Accusations Fly in Dispute Between New York Developer and Contractor

    BHA Sponsors the 9th Annual Construction Law Institute

    ASCE Statement on Hurricane Milton and Environmental Threats

    Summary Judgment Granted to Insurer for Hurricane Damage

    New Home Construction Booming in Texas

    California Supreme Court Hands Victory to Private Property Owners Over Public Use

    The Little Ice Age and Delay Claims

    Zero-Net Energy Homes Costly Everywhere but at the Electric Meter

    Legal Risks of Green Building

    Contractor’s Burden When It Comes to Delay

    Architect, Engineer, and Design Professional Liens in California: A Different Animal than the Mechanics’ Lien

    Understanding Insurance Disputes in Construction Defect Litigation: A Review of Acuity v. Kinsale

    COVID-19 Response: Executive Order 13999: Enhancement of COVID-19-Related Workplace Safety Requirements

    The Cheap and Easy Climate Fix That Can Cool the Planet Fast

    Los Angeles Considering Census of Seismically Unstable Buildings

    Working Safely With Silica: Health Hazards and OSHA Compliance

    Priority of Liability Insurance Coverage and Horizontal and Vertical Exhaustion

    Delaware “occurrence” and exclusions j(5) and j(6)

    Helsinki is Building a Digital Twin of the City

    Designer of World’s Tallest Building Wants to Turn Skyscrapers Into Batteries

    Bad Faith in the First Party Insurance Context

    Not Our Territory: 11th Circuit Dismisses Hurricane Damage Appraisal Order for Lack of Jurisdiction

    “It Just Didn’t Add Up!”

    DA’s Office Checking Workers Comp Compliance

    FEMA, Congress Eye Pre-Disaster Funding, Projects

    Courthouse Reporter Series - How to Avoid Having Your COVID-19 Expert Stricken

    First Circuit: No Coverage, No Duty to Investigate Alleged Loss Prior to Policy Period

    Practical Advice: Indemnification and Additional Insured Issues Revisited

    Discussion of History of Construction Defect Litigation in California

    Microsoft Said to Weigh Multibillion-Dollar Headquarters Revamp

    Spearin Doctrine as an Affirmative Defense

    Sensors for Smarter Construction – Interview with Laura Kassovic of MbientLab

    California Case Adds Difficulties for Contractors & Material Suppliers

    Key California Employment Law Cases: October 2018

    Amazon Can be Held Strictly Liable as a Product Seller in New Jersey

    Your Bad Faith Jury Instruction Against an Insurer is Important

    17 Snell & Wilmer Attorneys Ranked In The 2019 Legal Elite Edition Of Nevada Business Magazine

    Reconciling Prompt Payments and Withholding of Retention Payments

    Preparing the Next Generation of Skilled Construction Workers: AGC Workforce Development Plan

    Florida Governor Signs COVID-19 Liability Shield

    What Rich Millennials Want in a Luxury Home: 20,000 Square Feet

    Home Prices in 20 U.S. Cities Rose in June at a Slower Pace

    Appraisal May Include Cause of Loss Issues
    Corporate Profile

    CAMBRIDGE MASSACHUSETTS BUILDING EXPERT
    DIRECTORY AND CAPABILITIES

    Leveraging from more than 7,000 construction defect and claims related expert witness designations, the Cambridge, Massachusetts Building Expert Group provides a wide range of trial support and consulting services to Cambridge's most acknowledged construction practice groups, CGL carriers, builders, owners, and public agencies. Drawing from a diverse pool of construction and design professionals, BHA is able to simultaneously analyze complex claims from the perspective of design, engineering, cost, or standard of care.

    Building Expert News & Info
    Cambridge, Massachusetts

    Insured's Claim for Replacement Cost Denied

    December 02, 2015 —
    The Illinois Appellate Court affirmed the trial court's ruling that the insured was only entitled to the actual cost value of his loss, not the replacement cost. Lytle v. Country Mutual Ins. Co., 2015 Ill. App. LEXIS 756 (Sept. 30, 2015). The insured's home was built around 1903. On June 21, 2011, the insured discovered damage to his home because of a severe storm. He made a claim with his insurer, Country Mutual. The policy contained a depreciation holdback provision. The provision said the insurer would not pay more than the actual cash value until the actual repair or replacement was complete. If the insured elected to accept actual cash value, he would have one year from the date of the loss to repair or replace the damaged property and request the difference between the actual cash value and the replacement cost. Read the court decision
    Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii
    Mr. Eyerly may be contacted at te@hawaiilawyer.com

    State-Fed Fight Heats Up Over Building Private Nuclear Disposal Sites

    August 03, 2022 —
    The U.S. Nuclear Regulatory Commission and Interim Storage Partners, a joint venture that gained a federal license last year to build an interim storage facility for spent commercial nuclear fuel at a Texas site, have until Aug. 3 to answer a federal lawsuit claim by state officials that a new U.S. Supreme Court decision eliminates the federal agency’s licensing authority. Reprinted courtesy of Mary B. Powers, Engineering News-Record and Debra K. Rubin, Engineering News-Record Ms. Rubin may be contacted at rubind@enr.com Read the full story... Read the court decision
    Read the full story...
    Reprinted courtesy of

    Illinois Supreme Court Announces Time Standards for Closing Out Cases

    April 11, 2022 —
    (April 4, 2022) - Beginning July 1, 2022, Illinois trial courts will begin imposing new time standards for closing out pending cases. This change follows the Illinois Supreme Court’s March 25, 2022 announcement setting new time standards for case closure in trial courts. This announcement will apply to all cases filed in the State of Illinois on or after January 1, 2022. According to the recent announcement, the purpose of the new Time Standards Order (the Order) is to assist Illinois circuit courts with “meeting their fundamental obligation to resolve disputes fully, fairly, and promptly” by establishing a uniform, statewide expectation for parties, attorneys, and judges regarding the status of cases that will require each court to evaluate its actual performance compared to a statewide expectation. Read the court decision
    Read the full story...
    Reprinted courtesy of Zachary Shelton, Lewis Brisbois
    Mr. Shelton may be contacted at Zachary.Shelton@lewisbrisbois.com

    Changes and Extra Work – Is There a Limit?

    October 09, 2018 —
    Design and construction changes can be a challenge for everyone involved in a construction project. Designers and contractors endeavor to deliver a project that meets the owner’s needs, budget, and aesthetic considerations. As a project comes to fruition, the project frequently changes, and the parties must address and resolve the financial considerations of those changes and implement the changes at the project level. Often times the most critical aspect of a contractor’s financial success or failure of a construction project is its ability to manage changes. Contractors are sometimes faced with changes that are beyond the reasonable expectation of the original undertaking and have significant planning, scheduling, and cost implications that may not be considered or addressed in the contract’s changes clause. Changes of this magnitude may be considered “cardinal changes” and provide the contractor with recourse beyond restrictions imposed by the contract’s changes clause. But cardinal change is a risky basis for a contractor to refuse to perform additional or changed work. Even major changes can probably be more safely handled within the terms of the contract’s changes clause. Read the court decision
    Read the full story...
    Reprinted courtesy of Joseph R. Young, Smith Currie
    Mr. Young may be contacted at jryoung@smithcurrie.com

    Agile Project Management in the Construction Industry

    January 09, 2023 —
    The linear workflows used in the construction industry, such as the RIBA plan of work, have a history of starting when the previous phases end. The stages in these workflows are often distinct and sequential, and it might be difficult or expensive to go back after a stage is finished. Design reviews are required in this method, which is also known as the “Waterfall,” and they must be completed before moving on to the next level.  Cross-phase iterations are a rare symptom of problems, and the majority of design specifications will be locked early to prevent rework. Additionally, common planning and scheduling methods for the construction industry, like the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT), lack the ability to represent feedback and iteration in projects because they only permit one-way progression.  As a result, these processes have come under fire for being a linear paradigm that encourages a fragmented approach to project management, and the need for a more iterative procedure has increased. Read the court decision
    Read the full story...
    Reprinted courtesy of Mohammad Saki, AEC Business

    Who Would Face Liability For Oroville Dam Management: Brett Moore Authors Law360 Article

    February 23, 2017 —
    On February 12, 2017, the Butte County Sheriff ordered the evacuation of more than 180,000 people in the communities surrounding California’s Oroville Dam after officials spotted severe erosion in the dam’s emergency spillway. The Oroville Dam facilities are managed on by the Federal Energy Regulatory Commission, which licenses the project to California’s Department of Water Resources (DWR). In his Law360 article “Who Would Face Liability For Oroville Dam Management,” Attorney Brett Moore discusses the liability of the agencies involved in managing the Oroville facilities should the dam fail again. Read the court decision
    Read the full story...
    Reprinted courtesy of Brett G. Moore, Haight Brown & Bonesteel LLP
    Mr. Moore may be contacted at bmoore@hbblaw.com

    Motion for Summary Judgment Gets Pooped Upon

    December 16, 2023 —
    I’ve read some crappy motions over the years, some of which opposing counsel might even attribute to me, but I don’t think I’ve ever written about poop and motions. In Beebe v. Wonderful Pistachio & Almonds LLC, a summary judgment motion filed by a project owner sued by a construction worker for personal injuries caused by bird poop, which in turn caused a nasty fungal infection which spread to his brain, resulted in a not-so-wonderful ending for Wonderful. Read the court decision
    Read the full story...
    Reprinted courtesy of Garret Murai, Nomos LLP
    Mr. Murai may be contacted at gmurai@nomosllp.com

    CDJ’s #9 Topic of the Year: Nevada Supreme Court Denies Class Action Status in Construction Defect Case

    December 31, 2014 —
    According to Sean Whaley of the Las Vegas Review-Journal, “The Nevada Supreme Court has rejected a request for class action status for claims of damaged stucco from faulty construction by Del Webb Communities involving nearly 1,000 Sun City Summerlin residents.” However, “the court upheld the award of damages to 71 homeowners following a jury trial in Clark County District Court in 2008.” Whaley reported that this construction defect case was touted as the largest in Nevada history. Read the court decision
    Read the full story...
    Reprinted courtesy of