Don’t Kick the Claim Until the End of the Project: Timely Give Notice and Preserve Your Claims on Construction Projects
December 10, 2015 —
Christopher G. Hill – Construction Law MusingsFor this week’s Guest Post Friday, we welcome
Tara L. Chadbourn. Tara is an attorney with
ReavesColey PLLC in Chesapeake, VA, where she concentrates her practice on construction law, litigation and commercial litigation. Tara counsels owners, contractors, subcontractors and materials suppliers in various government and commercial construction matters. Tara can be reached at tara.chadbourn@reavescoley.com.
You may have experienced and have certainly heard of the scenario in which a contractor waits to address a claim as part of project closeout, only to realize the applicable deadline has already passed. While there may have been discussions about claims during the course of the project, contractors cannot rely upon oral conversations about outstanding claims. Instead, contractors must be vigilant in satisfying notice requirements and preserving claims. While entitlement must still be proven, a contractor’s chances of recovery increase greatly if the contractor abides by notice requirements and consciously preserves claims in the following ways.
Contractors Must Acquaint Themselves with Contractual Notice Provisions:
Many prime and subcontract agreements contain stringent notice provisions that require the contractor to give notice within a certain time period or else the claim is expressly waived. The deadline for notice is often only a few days after the occurrence giving rise to the claim or the contractor becoming aware of the claim. To avoid waiver, contractors must carefully review their contracts for provisions requiring notice of a claims for adjustment for a variety of situations to include unforeseen site conditions, trade sequencing changes, project delay or scope of work changes.
Read the court decisionRead the full story...Reprinted courtesy of
Christopher G. Hill, Law Office of Christopher G. Hill, PCMr. Hill may be contacted at
chrisghill@constructionlawva.com
Construction Defects in Roof May Close School
October 21, 2013 —
CDJ STAFFA school in Wales may have to close due to roof leaks. The school was opened six years ago, but since then the leaks at Ysgol Ffynnonbedr are “leading to the deterioration of the structure and fabric of the school.” The Lampeter city council have budgeted £35,000 (about $56,000) for repairs to the roof.
The leaks have already rendered some of the electrical systems and teaching areas unusable. The city council had been in discussion with the builders, Cowlin Construction, when that firm was bought by Balfour Beatty. Balfour Beatty did not comment to the Cambrian Times about resolving the construction defects.
Read the court decisionRead the full story...Reprinted courtesy of
NYC Hires Engineer LERA for Parking Garage Collapse Probe
January 29, 2024 —
James Leggate - Engineering News-RecordThe investigation into the collapse of a Lower Manhattan parking garage last April is still underway. A Jan. 2 notice published in The City Record identified LERA Consulting Structural Engineers RLLP as the engineering firm assisting with the probe.
Reprinted courtesy of
James Leggate, Engineering News-Record
Mr. Leggate may be contacted at leggatej@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Where There's Smoke...California's New Emergency Wildfire Smoke Protection Regulation And What Employers Are Required To Do
August 26, 2019 —
Michael Studenka – Newmeyer DillionCalifornia employers need to pay heed to the recently announced California Division of Occupational Safety and Health Standards Board (Cal/OSHA) emergency regulation related to their duty to protect employees from the potential harm caused by wildfire smoke. As of July 29, 2019, employers are required to actively monitor their local Air Quality Index (AQI) and take steps to protect their employees from the harmful particulate matter contained within wildfire smoke.
Which Workplaces Are Impacted?
The regulation applies to all workplaces exposed to wildfire smoke with an AQI level of 151 or greater (ranging from "unhealthy" to "hazardous"). "Exposed" workplaces are those that are not in enclosed buildings, structures, or vehicles with mechanical ventilation and the ability to close all windows and doors. Outdoor occupations including construction, agriculture, landscaping, maintenance, commercial delivery, and others that expose the worker to the outside air for more than one hour will be the most impacted by this new regulation, although firefighters engaged in fighting wildfires are expressly exempt from the statute.
What If I Have A Potentially Exposed Workplace?
Employers with outdoor workplaces that are exposed to wildfire smoke are required to monitor the AQI before each shift, and "periodically throughout the day," all to ensure that the Air Quality Index for PM2.5 (particulate matter with an aerodynamic diameter of 2.5 micrometers or smaller) remains below 151. This can be done by visiting certain governmental websites, including U.S. Environmental Protection Agency's AirNow website (www.airnow.gov), which allow for regular email alerts to be issued to the employer. An employer with a potentially exposed workplace must also set up a communication system capable of communicating to all affected employees (in a language readily understood) the status of wildfire smoke hazards. The communication system must also provide the employees a process to inform the employer of worsening air quality and/or any adverse symptoms that they may be experiencing (e.g., asthma or chest pain).
Finally, employers are required to add to their Injury and Illness Protection Program (IIPP) the provision of effective training and instruction (i.e., approximately 15 minutes) regarding:
- the health effects of wildfire smoke;
- the right to obtain medical treatment without fear of reprisal;
- how employees can obtain the current AQI for PM2.5;
- the requirements of this regulation;
- the employer's communication system regarding wildfire smoke;
- the employer's methods for protecting employees from wildfire smoke;
- the importance, limitations, and benefits of using a respirator when exposed to wildfire smoke; and
- the proper use and maintenance of respirators.
The Required Provision of Respiratory Protective Equipment
Employers with exposed workplaces are required to provide effective NIOSH-approved respirators (e.g., N95 filtering facepiece respirators) when AQI for PM2.5 levels are 151-200 (unhealthy), 201-300 (very unhealthy), or 301-500 (hazardous). The N95 respirator typically costs less than a dollar per mask and can be easily purchased online. Employers are also required to clean, store, and maintain these respirators for times of need. Employees are free to decide whether to use a respirator when the AQI for PM2.5 level is between 151-500, although employers must be prepared to offer the equipment at an AQI level of 151 or higher. Use of the respirator by an employee exposed to an AQI for PM2.5 level that exceeds 500, however, is required by law.
What Should Potentially Exposed Employers Do Now?
Employers should immediately begin supplementing their IIPP platforms to include this regulation's prescribed training regarding wildfire smoke. Companies should also develop an adequate monitoring and communication plan regarding wildfire smoke hazards and effectively train their supervisors on the same. Finally, acquiring an adequate supply of N95 filtering respirators now will help ensure that employers are prepared for the next wildfire.
Michael Studenka is a partner in Newmeyer Dillion's Labor & Employment practice group. His practice focuses on the life cycle of Employment law. Mike advises and trains companies on proactive measures to keep them protected and in compliance, and leverages his significant trial experience when faced with litigation. You can reach out to him at michael.studenka@ndlf.com.
Read the court decisionRead the full story...Reprinted courtesy of
A Duty to Design and Maintain Reasonably Safe Roadways Extends to All Persons. (WA)
February 25, 2014 —
Natasha Khachatourians – Scheer & Zehnder LLP Liability NewsletterCase: Lowman v. Wilbur, et al., 178 Wn.2d 165, 309 P.3d 3.87 (2013).
Issue: If a passenger’s injuries are in fact caused by the placement of a utility pole too close to a roadway, can the injuries be deemed too remote for purposes of legal causation? NO.
Facts: Plaintiff was a passenger in a vehicle that lost control and collided with a utility pole that was 4.47 feet from the edge of the roadway. The vehicle’s driver was under the influence of alcohol. Plaintiff sued the driver as well as the utility company and Skagit County for negligence. The trial court granted the utility company and Skagit County’s summary judgment motion, finding that the negligent placement of the utility pole was not a legal cause of plaintiff’s injuries.
The issue before the Supreme Court was whether a negligently placed utility pole could be the legal cause of a resulting injury.
Read the court decisionRead the full story...Reprinted courtesy of
Natasha Khachatourians, Scheer & Zehnder LLP Ms. Khachatourians may be contacted at
natashak@scheerlaw.com
Balfour in Talks With Carillion About $5 Billion Merger
July 30, 2014 —
Simon Thiel and Alex Webb – BloombergBalfour Beatty Plc (BBY), the U.K. construction company whose chief quit in May after predicting a profit drop, is in merger talks with rival Carillion Plc (CLLN) to form the country’s biggest builder with a market valuation of about 3 billion pounds ($5 billion).
A deal would create a market-leading service and construction business able to serve more clients and cut costs, the builders said in a statement yesterday, adding that they’re trying to develop a strategy and business plan. Balfour and Carillion surged as much as 13 percent and 14 percent respectively in London trading today.
Balfour, based in London, has struggled since the global recession, with a lack of building work in the U.K. and the cancellation of projects across Australia, where the company cut hundreds of jobs last year. A merged company would benefit from Carillion’s booming services business as the Wolverhampton, England-based builder expands its maintenance offerings for the rail, oil and telecommunication industries.
Mr. Thiel may be contacted at sthiel1@bloomberg.net; Mr. Webb may be contacted at awebb25@bloomberg.net
Read the court decisionRead the full story...Reprinted courtesy of
Simon Thiel and Alex Webb, Bloomberg
Unpunished Racist Taunts: A Pennsylvania Harassment Case With No True 'Winner'
December 04, 2023 —
Richard Korman - Engineering News-RecordThe taunts started in the first days of Andre Pryce’s new job, camouflaged as joking. During the nine months of 2019 spent working as a drill rig hand, mostly in the woods in western Pennsylvania, for a contractor that also performs much construction-related drilling, he said coworkers filled his ears with racist insults.
Reprinted courtesy of
Richard Korman, Engineering News-Record
Mr. Korman may be contacted at kormanr@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
The Leaning Tower of San Francisco
January 24, 2018 —
Dave Suggs - CDJ STAFFThe Millennium Tower located at 301 Mission Street in San Francisco, California opened in 2009 and is fifty-eight stories high. It is comprised of expensive apartments with price tags in the millions. “Yet for all its curb appeal, the building has, quite literally one fundamental problem: it’s sinking into mud and tilting towards its neighbors” reports John Wetheim of CBS News in the
60 Minutes segment about the condition of the tower “San Francisco’s Leaning Tower of Lawsuits.”
In the Tower’s basement along columns that protrude from the foundation of the building there are stress gauges lining the walls illustrating cracks with slow growth which is cause for concern. The tower is tilting a total of 14 inches toward the northwest and has sunk 17 inches so far. Petar Marinkovic, an engineer for the European Space Agency estimates that the tower is sinking 1.5 to 2 inches per year.
Jerry Cauthen, a local engineer, weighs in on what he believes is the cause of the sinking and leaning; it was built from concrete instead of steel. “Concrete is often cheaper. And it’s just as good, but it is a lot heavier. And so you got to design your foundation and your sub-surface to support that higher weight.” A local geotechnical engineer, Larry Karp agrees stating that the foundation of a building of this size and weight should be on solid rock (bedrock). The Millennium Tower is sitting on layers debris from the 1906 earthquake, a gold rush landfill, as well as clay, mud, and sand.
There over 20 parties involved in the Millennium Tower lawsuits so far. Solutions to “fix” the tower’s issues range from removing 20 stories from the top of the building to perpetually freezing the ground beneath the building. There are also ongoing mediation talks to determine the feasibility of drilling down to bedrock under a building where a thousand residents are still upstairs.
Read the court decisionRead the full story...Reprinted courtesy of