Wilke Fleury Secures Bid Protest Denial
March 16, 2020 —
Wilke Fleury LLPAfter the City of Vacaville, following a sealed bid process, awarded a significant well drilling contract to Roadrunner Drilling & Pump Company, second-place bidder Nor-Cal Pump and Well Drilling filed a protest with the City on January 30, claiming that Roadrunner’s bid failed to meet certain requirements of the proposed contract. Roadrunner hired Wilke Fleury to defend the bid protest. After Wilke Fleury partner Dan Baxter transmitted a letter to the City explaining why the disgruntled bidder’s protest was factually and legally unsupported, the City—a mere nine days after receiving Dan’s letter—rejected the bid protest, and maintained its award of the project to Roadrunner as the lowest responsive and responsible bidder.
Wilke Fleury LLP
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Hammer & Hand’s Top Ten Predictions for US High Performance Building in 2014
January 22, 2014 —
Beverley BevenFlorez-CDJ STAFFOn Hammer & Hand’s blog, Sam Hagerman, Skylar Swinford, and Dan Whitmore discuss how they expect US high performance building policy to evolve in 2014. The three consultants and builders have built “some of the most notable high performance green building projects around, including Karuna House,” “Pumpkin Ridge Passive House,” and the “Glasswood Commercial Passive House Retrofit,” according to the blog. Hagerman and Whitmore also have served on the Passive House Alliance US board. Predictions cover topics such as Net Zero Energy to Net Positive Energy buildings, renewable energy productions, building energy codes, CO2 heat pumps, and more.
Read the court decisionRead the full story...Reprinted courtesy of
Righting Past Wrongs Through Equitable Development
January 17, 2022 —
Bruce Buckley & Pam Radtke Russell - Engineering News-RecordStanding on a dead-end street in Spartanburg, S.C., Harold Mitchell can plainly see the history of injustice in his community. On one side lies the remains of his childhood home. On the other, a shuttered fertilizer plant that was operational when Mitchell was growing up. He distinctly recalls smells of ammonia and sulfur emanating through the neighborhood that “were so pervasive, you didn’t even think about it.” He remembers his father regularly cleaning white dust off their cars, and workers emerging from the plant gates “looking like the Pillsbury Doughboy” covered in fertilizer dust from head to toe. Sometimes, he’d walk with the plant’s night watchman, strolling alongside neon green sewage lagoons located not far from his bedroom window.
Reprinted courtesy of
Bruce Buckley, Engineering News-Record and
Pam Radtke Russell, Engineering News-Record
ENR may be contacted at enr@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
First Circuit Rejects Insurer’s “Insupportable” Duty-to-Cooperate Defense in Arson Coverage Suit
October 24, 2023 —
Geoffrey B. Fehling & Yaniel Abreu - Hunton Insurance Recovery BlogIn
Philadelphia Indemnity Insurance Co. v. BAS Holding Corp., the Court of Appeals for the First Circuit rejected an insurer’s “insupportable” defense that the insured company had breached its duty to cooperate by refusing the insurer’s request for an examination under oath of the company’s president. The decision is a reminder that, while examinations under oath can be effective tools to allow the insurer to properly investigate a claim, an insured’s duty to cooperate is not boundless and does not demand attendance at examinations that are not reasonably requested.
Background
BAS Holding involves the destruction of a landmark building in Boston by an arsonist. The owner, BAS Holding Corporation, submitted an insurance claim to its property insurer to recover insurance proceeds for the damage to the building. The insurer investigated the claim to determine whether the damage to the building was covered and issued a reservation of rights letter suggesting that the policy may not provide coverage for the fire. As part of its investigation, the insurer requested an examination under oath as a condition to coverage under the policy, which led to BAS presenting the property’s operations coordinator for an interview. Shortly after examining the operations coordinator, the insurer sought another examination of BAS’s president and owner, as well as five other employees. In response, BAS questioned whether the additional examinations were “reasonably required” and said that it would consider the requests if the insurer could explain why they were necessary.
Reprinted courtesy of
Geoffrey B. Fehling, Hunton Andrews Kurth and
Yaniel Abreu, Hunton Andrews Kurth
Mr. Fehling may be contacted at gfehling@HuntonAK.com
Mr. Abreu may be contacted at yabreu@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
Delays in Filing Lead to Dismissal in Moisture Intrusion Lawsuit
September 09, 2011 —
CDJ STAFFThe Alabama Court of Civil Appeals has upheld a summary judgment in the case of Franklin v. Mitchell. Walter Mitchell, doing business as Southern Classic Construction built a new home for the Franklins. The Franklins moved into the home in October 2001. In April 2006 they discovered sagging floors in both the bathroom and kitchen. They contacted Mitchell who suggested the flooring might be defective. The Franklins spent eight months attempting to contact the flooring manufacturer.
In March 2007, the Franklins had the home inspected. The sagging was determined to be due to a loss of strength in the decking because of condensation from the air conditioning system. Air returns were not properly sealed and drawing moisture into the structure. There was mold on the decking and floor joints.
When Mitchell was contacted by the Franklins, he told them his one-year warranty had expired but had the HVAC subcontractor, Southern Mechanical Heating & Air (owned by Mitchell’s father, Jim Mitchell), look at the situation. SMHA replaced and braced subfloors. Later, they entered the crawl space to tape ducts, seal the air return, and insulate the air vent housing. The Franklins were not satisfied with the repairs, as not all the ducts were taped, nor were the air vent housings insulated.
Franklin complained to Walter Mitchell who again cited his one-year warranty. Jim Mitchell said he would not report complaints to his insurer, stating that the repairs were unnecessary, that the work had been done correctly in the first place, and it was only done at the request of Walter Mitchell.
In February 2009, the Franklins sued Walker Mitchell. Mitchell denied the claims, citing in part the statute of limitations. Mitchell also filed complaints against three subcontractors, including his father’s firm. Mitchell received a summary judgment as the case started after Alabama’s six-year statute of limitations.
The appeals court rejected the Franklin’s argument that the claim of damage did not start until they were aware it was due to a construction defect. The court noted that as Walter Mitchell was licensed as a “residential home builder, the statute the Franklins cite did not apply, as it concerns architects, engineers, and licensed general contactors.”
Nor did they feel that Mitchells’ claim that his warranty had expired were sufficient to override the statute of limitations, quoting an earlier case, “Vague assurances do not amount to an affirmative inducement to delay filing suit.” Their claim of subsequent negligent repairs was rejected because Mitchell did not direct the specific actions taken by his father’s firm.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Replacing Coal Plants with Renewables Is Cheaper 80% of the Time
May 31, 2021 —
Leslie Kaufman - BloombergAbout 80% of U.S. coal plants are now more expensive to keep running than to swap out for new wind and solar capacity, according to a report from Energy Innovation, a non-partisan climate and energy think tank.
While renewables cost more than fossil energy for much of the last century, prices for new wind and solar have dropped so quickly in recent years that they were already cheaper than new coal. This report shows that the price differential holds true for a growing amount of existing coal, as well. “This is becoming true for more and more plants moving forward—and at an accelerating pace,” said Eric Gimon, a senior fellow with Energy Innovation and a co-author of the report.
Coal has been steadily declining as a fixture of the U.S. energy mix for more than a decade due to combined pressure from activists and market forces. The Sierra Club, which runs the Beyond Coal campaign aimed at eliminating coal power in the U.S., says that 339 plants have either been retired or are on their way to retirement since 2010, leaving just 191 still operating indefinitely. (Michael R. Bloomberg, the founder and majority owner of Bloomberg LP, the parent company of Bloomberg News, has committed $500 million to launch Beyond Carbon, a campaign aimed at closing the remaining coal-powered plants in the U.S. by 2030 and slowing the construction of new gas plants.)
Read the court decisionRead the full story...Reprinted courtesy of
Leslie Kaufman, Bloomberg
Real Estate & Construction News Round-Up (08/17/22) – Glass Ceilings, Floating Homes and the Inflation Reduction Act
September 12, 2022 —
Pillsbury's Construction & Real Estate Law Team - Gravel2Gavel Construction & Real Estate Law BlogThis week’s round-up features the construction industry’s latest happenings: the Inflation Reduction Act, women shattering the glass ceiling, eco-friendly floating homes, and more.
- The Inflation Reduction Act contains approximately $5 billion for programs to accelerate the construction industry’s shift toward green building materials. (Julie Strupp, Construction Dive)
- According to a new analysis from consultancy Rider Levett Bucknall, the speed of growth for construction costs has only gotten faster. (Erik Sherman, Globe St.)
- Record vacancies in the construction industry has created the opportunity for women to step into what’s previously been an all-male business. (Craig Torres & Maria Paula Mijares Torres, Bloomberg)
- A midlife crisis hits office buildings, with the late-30s/early-40s stable of office product accounting for about a third of the national market today. (Commercial Observer)
Read the court decisionRead the full story...Reprinted courtesy of
Pillsbury's Construction & Real Estate Law Team
Homeowner Has No Grounds to Avoid Mechanics Lien
September 01, 2011 —
CDJ STAFFThe California Court of Appeals has rejected a motion by a homeowner in a dispute with the contractor who built an extension to his home. In McCracken v. Pirvulete, Mr. McCracken filed a mechanics lien after Mr. Pirvulete failed to complete payment. The matter went to trial with a series of exhibits that showed “the contractual relationship was strained and the parties disagreed over performance and payment.” As a result of the trial, the court awarded Mr. McCracken, the contractor, $1,922.22.
Mr. Pirvulete appealed, contending that the court had not allowed his daughter to act as a translator, that the court had failed to give him sufficient time to present his case, that the mechanics lien should have been dismissed, and several other claims, all before a formal judgment was issued. After the court formalized its judgment and rejected the appeal, Mr. Pirvulete appealed again.
The appeals court found that Mr. Pirvulete did not provide an adequate record for review. The court dismissed Mr. Pirvulete’s claims. The court notes that Mr. Pirvulete claimed that a request for a discovery period was denied, however, he has provided neither the request nor the denial. The trial court has no record of either.
Nor was there a record of a request that Mr. Pirvulete’s daughter provide translation. The court notes, “so far as we can glean from the record provided, the Register of Actions states, ‘Trial to proceed without Romanian Interpreter for Defendant; Daughter present to interpret if needed.’” Additionally, the court found that “there has been no showing that his facility with the English language is or was impaired in any way or that there was any portion of any proceeding, which he did not understand.”
Further, the appeals court found there were no grounds for a new trial, despite Mr. Pirvulete’s filings. The court concluded, “The owner has failed to provide a record adequate for review of most, if not all, of the claims of error. Some issues are not cognizable because they relate to entirely separate proceedings, and not the trial below. To the limited extent that the claims are examinable, the owner has made no showing of error.” The court affirmed the judgment of the lower court against Mr. Pirvulete.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of