Property Damage to Non-Defective Work Is Covered
February 18, 2015 —
Tred R. Eyerly – Insurance Law HawaiiThe New Hampshire Supreme Court found some of the property damage evolving from the insured's portion of the work was covered under its liability policy. Cogswell Farm Condo. Ass'n v. Tower Group, Inc., 2015 N.H. LEXIS 3 (N.H. Jan. 13, 2015).
Lemery Building Company, Inc. constructed and developed 24 residential condominium units. After units were sold, the Cogswell Farm Condominium Association sued Lemery, asserting that the "weather barrier" components of the units were defectively constructed and resulted in damage to the units due to water leaks. Cogswell then sued its insurer, Tower Group, Inc., seeking a declaratory judgment that its claims against Lemery were covered.
The trial court eventually determined that exclusions J (1) and J (6) both applied to exclude coverage. Exclusion J (1) excluded coverage for "property damage" to property that Lemery "owns, rents, or occupies." Exclusion J (6) excluded coverage for property damage to "[t] hat particular part of any property that must be restored, repaired or replaced because [Lemery's] work was incorrectly performed on it."
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Understanding the Details: Suing Architects and Engineers Can Get Technical
November 02, 2017 —
Steven M. Cvitanovic & Stephen M. Tye - Haight Brown & Bonesteel LLPBefore suing an architect or engineer for professional negligence, a plaintiff must obtain a “certificate of merit” (“Certificate”) under Code of Civil Procedure section 411.35. Boiled down to the basics, the Certificate declares that the attorney consulted with and received an opinion from an expert that a reasonable and meritorious case exists against said design professional. The Certificate must be filed before serving the complaint on any defendant, but can be filed within 60 days under certain circumstances. This rule was recently analyzed against another long-standing rule in California, known as the “relation-back doctrine.” Under the relation-back doctrine, a court will deem a later-filed pleading, such as an amended complaint, to be deemed filed at the time of an earlier complaint.
In Curtis Engineering Corp. v. Superior Court of San Diego County, No. D072046, (Cal. Ct. App. 10/23/17), the Fourth Appellate Court considered the interplay between section 411.35 and the relation-back doctrine, holding that a Certificate filed more than 60 days after filing the original pleading does not relate back to the filing of the original pleading.
Reprinted courtesy of
Steven Cvitanovic, Haight Brown & Bonesteel LLP and
Stephen Tye, Haight Brown & Bonesteel LLP
Mr. Cvitanovic may be contacted at scvitanovic@hbblaw.com
Mr. Tye may be contacted at stye@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
The Vallagio HOA Appeals the Decision from the Colorado Court of Appeals
August 04, 2015 —
David M. McLain – Colorado Construction LitigationAs highlighted in our most recent post, the Colorado Court of Appeals’ Vallagio decision upheld a declaration provision that prohibited the amendment of a mandatory arbitration clause without the consent of the developer/declarant. Vallagio at Inverness Residential Condominium Association, Inc. v. Metropolitan Homes, Inc., et al., 2015COA65 (Colo. App. May 7, 2015). This case protects a developer/declarant’s ability to arbitrate construction defect claims with a well-crafted declaration that requires declarant consent in order to amend the mandatory arbitration provisions for construction defect actions.
However, the Vallagio ruling still hangs in the balance while the Colorado Supreme Court considers the condominium association’s petition for certiorari review, filed June 18, 2015. In its petition, the association argues that the declarant consent requirement violates public policy and four separate sections of the Colorado Common Interest Act (“CCIOA”).
For instance, the association argued in the courts below that a declarant consent requirement violates section 217 of CCIOA, which governs unit owners’ voting percentage requirements and provides that declarations may not require more than 67% affirmative vote for amendments. The Court of Appeals rejected this argument, reasoning that other provisions of section 217 contemplate consent requirements by parties other than unit owners, such as first mortgagees.
Read the court decisionRead the full story...Reprinted courtesy of
David M. McLain, Higgins, Hopkins, McLain & Roswell, LLCMr. McLain may be contacted at
mclain@hhmrlaw.com
No Coverage Under Ensuing Loss Provision
September 09, 2011 —
Tred R. Eyerly - Insurance Law HawaiiThe cost of removing and replacing cracked flanges to prevent future leakage was not covered as an ensuing loss under a builder’s risk policy in RK Mechanical, Inc. v. Travelers Prop. Casualty Co. of Am., 2011 U.S. Dist. LEXIS 83958 (D. Colo. Aug. 1, 2011).
The insured, RK Mechanical Inc., was a subcontractor hired to install plumbing for a residential construction project. RK was an additional insured on the general contractor’s policy with Travelers. RK installed approximately 170 CPVC flanges on the project. Subsequently, two of the flanges cracked, allowing water to overflow and causing water damage to the project. Travelers was notified of the flange failure and resulting water damage.
RK subsequently removed and replaced the two cracked flanges and began water remediation. Travelers paid for the cost of the water damage due to the cracked flanges.
RK then examined all of the flanges installed in the project and discovered many were cracked and/or showed signs of potential failure. RK removed and replaced the cracked flanges. RK tendered a claim and demand for indemnity to Travelers for these repair costs. Travelers denied the claim. RK then sued for breach of contract and declaratory relief. The parties filed cross motions for summary judgment.
Read the full story…
Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com
Read the court decisionRead the full story...Reprinted courtesy of
Contractors: Revisit your Force Majeure Provisions to Account for Hurricanes
September 20, 2017 —
David Adelstein - Florida Construction Legal UpdatesWe now know and can appreciate the threat of hurricanes. Not that we did not appreciate the reality of hurricanes–of course we did–but Hurricane Harvey and Hurricane Irma created the type of actual devastation we fear because they hit close to home. The fear came to life, creating panic, anxiety, and uncertainty. It is hard to plan for a force majeure event such as a hurricane because of the capriciousness of Mother Nature. But, we need to do so from this point forward. No exception! And, I mean no exception!!
A force majeure event is an uncontrollable event that cannot be anticipated with any degree of definitiveness. The force majeure event will excusably delay or hinder performance obligations under a contract. One type of force majeure event is a hurricane—an uncontrollable and unforeseen act of Mother Nature.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Florida Construction Legal UpdatesMr. Adelstein may be contacted at
dadelstein@gmail.com
Real Estate & Construction News Roundup (5/29/24) – Megaprojects on the Rise, Agency Guidance for CRE, and an Upbeat Forecast for Commercial Real Estate Investment
June 21, 2024 —
Pillsbury's Construction & Real Estate Law Team - Gravel2Gavel Construction & Real Estate Law BlogIn our latest roundup, summer travelers seek alternative lodging options, purpose-built wellness real estate investments grow, bonds backed by CRE debt hit are hit with losses, and more!
- Across all property types, purpose-built wellness real estate investment has grown dramatically in recent years, including properties with wellness features as a focus. (Mary Salmonsen, Multifamily Dive)
- The travelers on the road this summer will have different demographics, budgets and reasons for travel and different preferences on accommodations, with more travelers opting for alternative housing options. (Noelle Mateer, Hotel Dive)
- Megaprojects are on the rise, with massive projects, from rail tunnels to computer chip factories, having myriad stakeholders and lengthy timelines that span political administrations. (Julie Strupp, Construction Dive)
Read the court decisionRead the full story...Reprinted courtesy of
Pillsbury's Construction & Real Estate Law Team
Congratulations to Woodland Hills Partner Patrick Au and Senior Associate Ava Vahdat on Their Successful Motion for Summary Judgment!
February 14, 2023 —
Dolores Montoya - Bremer Whyte Brown & O'Meara LLPCongratulations to Woodland Hills Partner Patrick Au and Senior Associate Ava Vahdat on their successful Motion for Summary Judgment in Los Angeles Superior Court!
BWB&O’s client was a concrete contractor hired by a government entity for a limited sidewalk repair project many years ago. The Plaintiff, who was confined to a wheelchair, filed suit against BWB&O’s client alleging Negligence and Premises Liability after an alleged fall injury on a public sidewalk. Plaintiff’s primary alleged theory of liability against BWB&O’s client was that it either worked on or was supposed to work on that subject sidewalk and in doing so, or failure to do so, caused Plaintiff’s fall and subsequent alleged injuries/damages. Plaintiff claimed in excess of $1 million in damages.
After extensive discovery, Mr. Au and Ms. Vahdat gathered enough evidence to prove that BWB&O’s client neither worked on the subject area nor was required to do so. Accordingly, they prepared a successful Motion for Summary Judgment on the basis that no duty was owed to Plaintiff thereby refuting the negligence cause of action. The dispositive motion also proved that the subject sidewalk was not owned, controlled, or maintained by BWB&O’s client thereby negating the premises liability cause of action.
Read the court decisionRead the full story...Reprinted courtesy of
Dolores Montoya, Bremer Whyte Brown & O'Meara LLP
Need and Prejudice: An Eleventh-Hour Trial Continuance Where A Key Witness Is Unexpectedly Unavailable
July 10, 2018 —
Angela S. Haskins & Allegra Perez - Haight Brown & Bonesteel LLPIn Padda v. Superior Court (GI Excellence), No. E070522, the Court of Appeal, Fourth Appellate District, Division Two, recently held that a trial court abused its discretion in denying Defendants/Cross-Complainants’ request for a trial continuance where their key expert witness suddenly became ill twelve days before trial and before his deposition had been taken.
Reprinted courtesy of
Angela S. Haskins, Haight Brown & Bonesteel LLP and
Allegra Perez, Haight Brown & Bonesteel LLP
Ms. Haskins may be contacted at ahaskins@hbblaw.com
Ms. Perez may be contacted at aperez@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of