One Colorado Court Allows Negligence Claim by General Contractor Against Subcontractor
December 20, 2012 —
HEATHER ANDERSON , HIGGINS, HOPKINS, MCLAIN & ROSWELLJudge Paul King of the Douglas County District Court recently confirmed that subcontractors in residential construction owe an independent duty, separate and apart from any contractual duties, to act without negligence in the construction of a home in Colorado. See Order, dated September 7, 2010,
Sunoo v. Hickory Homes, Inc. et al., Case No. 2007CV1866; see also
Cosmopolitan Homes, Inc. v. Weller, 663 P.2d 1041 (Colo. 1983);
A.C. Excavating v. Yacht Club II Homeowners Ass’n, Inc., 114 P.3d 862 (Colo. 2005). He also verified that the holding in the
B.R.W. Inc. v. Dufficy & Sons, Inc., 99 P.3d 66 (Colo. 2004)[1] case does not prohibit general contractors, such as Hickory Homes, from enforcing a subcontractor’s independent duty to act without negligence in the construction of a home.
Read the court decisionRead the full story...Reprinted courtesy of
Heather Anderson, Higgins, Hopkins, McLain & Roswell, LLC.Ms. Anderson can be contacted at
anderson@hhmrlaw.com
New Hampshire Applies Crete/Sutton Doctrine to Bar Subrogation Against College Dormitory Residents
May 17, 2021 —
Kyle Rice - The Subrogation SpecialistPursuant to the Sutton Doctrine, first announced in Sutton v. Jondahl, 532 P.2d 478 (Okla. Ct. App. 1975), some jurisdictions consider a tenant a coinsured of its landlord absent an express agreement to the contrary. In Ro v. Factory Mut. Ins. Co., No. 2019-0620, 2021 N.H. LEXIS 34 (Mar. 10, 2021), the Supreme Court of New Hampshire held that the Sutton Doctrine, adopted by New Hampshire in Cambridge Mut. Fire Ins. Co. v. Crete, 846 A.2d 521 (N.H. 2004), extends to resident students in a college dormitory. Thus, absent specific language to the contrary, a student is an implied coinsured under the fire insurance policy issued for his or her dormitory.
In 2016, two students at Dartmouth College, Daniel Ro and Sebastian Lim, set up a charcoal grill on a platform outside of a fourth-floor window in the Morton Hall dormitory. The grill started a fire on the platform that ultimately spread to the roof of the dormitory. During fire suppression efforts, all four floors of the dormitory sustained significant water damage. Following the loss, the building’s insurer, Factory Mutual Insurance Company (Insurer), paid $4,544,313.55 to the Trustees of Dartmouth College for the damages.
Read the court decisionRead the full story...Reprinted courtesy of
Kyle Rice, White and WilliamsMr. Rice may be contacted at
ricek@whiteandwilliams.com
Lost Rental Income not a Construction Defect
November 27, 2013 —
CDJ STAFFA judge in Colorado has ruled that although the homeowner’s policy excluded construction defects from coverage, lost rental income and the cost of deck repair involved in fixing a defective drainage system were.
Read the court decisionRead the full story...Reprinted courtesy of
Paycheck Protection Flexibility Act Of 2020: What You Need to Know
July 20, 2020 —
Amy R. Patton & Rana Ayazi - Payne & FearsOn June 5, 2020, President Trump signed into legislation the bipartisan bill titled the Paycheck Protection Program Flexibility Act of 2020 (PPPFA). The PPPFA modifies the Paycheck Protection Program, which was first introduced under the Coronavirus Aid, Relief, and Economic Security Act (CARES Act). The modifications provide borrowers more control over the use of funds and make it easier to obtain forgiveness. The following is a summary of the key changes.
1. Extended Maturity Date From 2 Years to 5 Years
Under the CARES Act, the minimum maturity date for loan amounts after the forgiveness period was not defined. The Small Business Administration (SBA) then released an Interim Final Rule clarifying that the minimum maturity date was two years. The PPPFA has extended the term to five years: “The covered loan shall have a minimum maturity of 5 years and a maximum maturity of 10 years from the date on which the borrower applies for loan forgiveness under that section.”
2. Extension of Covered Period From Eight Weeks to a Maximum of 24 Weeks
Under the CARES Act, the covered period of the loan (i.e., the time period in which you may spend the loan funds) was February 15, 2020 to June 30, 2020, an eight-week period. The PPPFA extended the covered period to 24 weeks from the origination date of the loan, or December 31, 2020, whichever is earlier.
Reprinted courtesy of
Amy R. Patton, Payne & Fears and
Rana Ayazi, Payne & Fears
Ms. Patton may be contacted at arp@paynefears.com
Ms. Ayazi may be contacted at ra@paynefears.com
Read the court decisionRead the full story...Reprinted courtesy of
OSHA’s Multi-Employer Citation Policy: What Employers on Construction Sites Need to Know
September 09, 2019 —
Phillip C. Bauknight - Construction ExecutiveMulti-employer worksites are a frequent occurrence in the construction industry as employees from various companies often occupy the same site while a project is being completed. While the need for employees from different companies may be necessary to perform the various tasks required by a project, the presence of multiple employers, and their employees, on the same worksite can result in an increased risk of safety hazards.
Companies performing construction work should be, and generally are, aware of OSHA’s ability to issue citations for workplace safety violations. What many companies may not know, however, is that OSHA’s ability to cite employers is not limited to workplace conditions that are unsafe only to that employer’s direct employees. Rather, OSHA also has the ability to cite an employer, and often does issue such citations, for conditions that could result in injury or death to another company’s employees.
The policy which provides OSHA with this citation ability is CPL 02-00-124 and is called the Multi-Employer Citation Policy (the “Policy”). Under the language of the Policy, OSHA has the ability to cite multiple employers for violations of the Occupational Safety and Health Act for the same hazardous workplace condition. Critically, responsibilities under the Policy do not depend on the employer’s job title but are determined by the employer’s role.
Reprinted courtesy of
Phillip C. Bauknight, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Mr. Bauknight may be contacted at
pbauknight@fisherphillips.com
EPA Issues Interpretive Statement on Application of NPDES Permit System to Releases of Pollutants to Groundwater
May 27, 2019 —
Anthony B. Cavender - Gravel2GavelOn Tuesday, April 23, 2019, in a development of interest to practically anyone who operates a plant or business, EPA published its Interpretive Statement in the Federal Register. (See 84 FR 16810 (April 23, 2019).) After considering the thousands of comments it received in response to a February 20, 2018, Federal Register notice, EPA has concluded that “the Clean Water Act (CWA) is best read as excluding all releases of pollutants from a point source to groundwater from a point source from NPDES program coverage, regardless of a hydrological connection between the groundwater and jurisdictional surface water.”
Acknowledging that its past public statements have not been especially consistent or unambiguous on this important matter, EPA states that this interpretation “is the best, if not the only reading of the CWA, is more consistent with Congress’ intent than other interpretations of the Act, and best addresses the question of NPDES permit program applicability for pollutant releases to groundwater within the authority of the CWA.” Indeed, the absence of “a dedicated statement on the best reading of the CWA has generated confusion in the courts, and uncertainly for EPA regional offices and states implementing the NPDES program, regulated entities, and the public.” The recent and contrary interpretations of this issue by the Ninth Circuit (Hawaii Wildlife Fund v. County of Maui, 886 F.3d 737) and the Fourth Circuit (Upstate Forever v. Kinder Morgan Energy Partners, LP, 887 F.3d 637) will be reviewed by the U.S. Supreme Court, which will now have the benefit of the agency’s official position. In addition, EPA discloses that it will be soliciting additional public “input” on how it can best provide the regulated community with “further clarity and regulatory certainly”; these comments will be due within 45 days (June 7, 2019).
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com
Agile Project Management in the Construction Industry
January 09, 2023 —
Mohammad Saki - AEC BusinessThe linear workflows used in the construction industry, such as the RIBA plan of work, have a history of starting when the previous phases end. The stages in these workflows are often distinct and sequential, and it might be difficult or expensive to go back after a stage is finished. Design reviews are required in this method, which is also known as the “Waterfall,” and they must be completed before moving on to the next level.
Cross-phase iterations are a rare symptom of problems, and the majority of design specifications will be locked early to prevent rework. Additionally, common planning and scheduling methods for the construction industry, like the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT), lack the ability to represent feedback and iteration in projects because they only permit one-way progression.
As a result, these processes have come under fire for being a linear paradigm that encourages a fragmented approach to project management, and the need for a more iterative procedure has increased.
Read the court decisionRead the full story...Reprinted courtesy of
Mohammad Saki, AEC Business
Prefabrication Contract Considerations
March 08, 2021 —
David Adelstein - Florida Construction Legal UpdatesPrefabrication (also referred to as modular construction in instances), is a form of offsite construction where certain construction activities occur at an offsite manufacturing facility or location. Construction components or units are preassembled (prefabricated) at this offsite location prior to being delivered to the project site and then integrated into the project.
When preparing a prefabrication contract (including a prefabrication subcontract), there are a number of complex considerations that need to be weighed, and these considerations are bullet-pointed below. The purpose of these bullet-points is to give you considerations to discuss and vet when preparing, negotiating, and agreeing to a prefabrication contract or subcontract.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at