BERT HOWE
  • Nationwide: (800) 482-1822    
    multi family housing building expert Seattle Washington housing building expert Seattle Washington custom homes building expert Seattle Washington high-rise construction building expert Seattle Washington industrial building building expert Seattle Washington production housing building expert Seattle Washington landscaping construction building expert Seattle Washington concrete tilt-up building expert Seattle Washington custom home building expert Seattle Washington Medical building building expert Seattle Washington retail construction building expert Seattle Washington institutional building building expert Seattle Washington casino resort building expert Seattle Washington office building building expert Seattle Washington mid-rise construction building expert Seattle Washington Subterranean parking building expert Seattle Washington low-income housing building expert Seattle Washington townhome construction building expert Seattle Washington parking structure building expert Seattle Washington hospital construction building expert Seattle Washington tract home building expert Seattle Washington structural steel construction building expert Seattle Washington
    Seattle Washington civil engineering expert witnessSeattle Washington roofing construction expertSeattle Washington construction claims expert witnessSeattle Washington construction expert witness public projectsSeattle Washington slope failure expert witnessSeattle Washington OSHA expert witness constructionSeattle Washington testifying construction expert witness
    Arrange No Cost Consultation
    Building Expert Builders Information
    Seattle, Washington

    Washington Builders Right To Repair Current Law Summary:

    Current Law Summary: (SB 5536) The legislature passed a contractor protection bill that reduces contractors' exposure to lawsuits to six years from 12, and gives builders seven "affirmative defenses" to counter defect complaints from homeowners. Claimant must provide notice no later than 45 days before filing action; within 21 days of notice of claim, "construction professional" must serve response; claimant must accept or reject inspection proposal or settlement offer within 30 days; within 14 days following inspection, construction pro must serve written offer to remedy/compromise/settle; claimant can reject all offers; statutes of limitations are tolled until 60 days after period of time during which filing of action is barred under section 3 of the act. This law applies to single-family dwellings and condos.


    Building Expert Contractors Licensing
    Guidelines Seattle Washington

    A license is required for plumbing, and electrical trades. Businesses must register with the Secretary of State.


    Building Expert Contractors Building Industry
    Association Directory
    MBuilders Association of King & Snohomish Counties
    Local # 4955
    335 116th Ave SE
    Bellevue, WA 98004

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of Kitsap County
    Local # 4944
    5251 Auto Ctr Way
    Bremerton, WA 98312

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of Spokane
    Local # 4966
    5813 E 4th Ave Ste 201
    Spokane, WA 99212

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of North Central
    Local # 4957
    PO Box 2065
    Wenatchee, WA 98801

    Seattle Washington Building Expert 10/ 10

    MBuilders Association of Pierce County
    Local # 4977
    PO Box 1913 Suite 301
    Tacoma, WA 98401

    Seattle Washington Building Expert 10/ 10

    North Peninsula Builders Association
    Local # 4927
    PO Box 748
    Port Angeles, WA 98362
    Seattle Washington Building Expert 10/ 10

    Jefferson County Home Builders Association
    Local # 4947
    PO Box 1399
    Port Hadlock, WA 98339

    Seattle Washington Building Expert 10/ 10


    Building Expert News and Information
    For Seattle Washington


    Mexico Settles With Contractors for Canceled Airport Terminal

    Congratulations to San Diego Partner Johnpaul Salem and Senior Associate Scott Hoy for Obtaining a Complete Defense Verdict!

    Remote Trials Can Control Prejudgment Risk

    Suppliers of Inherently Dangerous Raw Materials Remain Excluded from the Protections of the Component Parts Doctrine

    Candis Jones Named to Atlanta Magazine’s 2022 “Atlanta 500” List

    Gillotti v. Stewart (2017) 2017 WL 1488711 Rejects Liberty Mutual, Holding Once Again that the Right to Repair Act is the Exclusive Remedy for Construction Defect Claims

    Compliance with Building Code Included in Property Damage

    Anticipatory Repudiation of a Contract — The Prospective Breach

    Specific Performance of an Option Contract to Purchase Real Property is Barred Absent Agreement on All Material Terms

    A Lack of Sophistication With the Construction Contract Can Play Out In an Ugly Dispute

    Wow! A Mechanic’s Lien Bill That Helps Subcontractors and Suppliers

    Real Estate & Construction News Roundup (8/14/24) – Commercial Real Estate AI, Hotel Pipeline Growth, and Housing Market Improvements

    Georgia Passes Solar CUVA Bill

    Court Rejects Insurer's Argument That Two Triggers Required

    Another Colorado District Court Refuses to Apply HB 10-1394 Retroactively

    Colorado’s New Construction Defect Law Takes Effect in September: What You Need to Know

    What Happens When a Secured Creditor Files a Late Claim in an Equity Receivership?

    Defense Dept. IG: White House Email Stonewall Stalls Border Wall Contract Probe

    Construction Robots 2023

    BWB&O Attorneys are Selected to 2024 Southern California Super Lawyers Rising Stars

    Why 8 Out of 9 Californians Don't Buy Earthquake Insurance

    Broker Not Liable for Failure to Reveal Insurer's Insolvency After Policy Issued

    Cold Weather Causes Power Blackouts, Disruptions on Jobsites

    Hawaii Court of Appeals Affirms Broker's Liability for Failure to Renew Coverage

    Subcontractors Have Remedies, Even if “Pay-if-Paid” Provisions are Enforced

    When is a “Notice of Completion” on a California Private Works Construction Project Valid? Why Does It Matter for My Collection Rights?

    New Research Shows Engineering Firms' Impact on Economy, Continued Optimism on Business Climate

    Hundreds of Coronavirus Coverage Cases Await Determination on Consolidation

    Henderson Engineers Tests AI for Building Systems Design with Torch.AI

    Ruling Dealing with Constructive Changes, Constructive Suspension, and the Implied Covenant of Good Faith and Fair Dealing

    Pennsylvania Supreme Court Adopts New Rule in Breach-of-the-Consent-to-Settle-Clause Cases

    “For What It’s Worth”

    Toolbox Talk Series Recap - Undocumented Change Work

    Show Me the Money: The Good Faith Dispute Exception to Prompt Payment Penalties

    The Ever-Growing Thicket Of California Civil Code Section 2782

    Retainage: What Contractors Need to Know and Helpful Strategies

    Construction Defect Dispute Governed by Contract Disputes Act not yet Suited to being a "Suit"

    Denver Parking Garage Roof Collapses Crushing Vehicles

    Texas Supreme Court Declines to Waive Sovereign Immunity in Premises Defect Case

    Supreme Court Opens Door for Challenges to Older Federal Regulations

    Haight Welcomes Robert S. Rucci

    Partner Vik Nagpal is Recognized as a Top Lawyer of 2020

    DC Circuit Approves, with Some Misgivings, FERC’s Approval of the Atlantic Sunrise Natural Gas Pipeline Extension

    The Final Nail: Ongoing Repairs Do Not Toll the Statute of Repose

    ICC/ASHRAE/USGBC/IES Green Model Code Integrates Existing Standards

    A Retrospective As-Built Schedule Analysis Can Be Used to Support Delay

    Limitations on the Ability to Withdraw and De-Annex Property from a Common Interest Community

    Court Holds That Public Entity Can Unilaterally Replace Subcontractor Under California’s Subletting and Subcontracting Fair Practices Act

    SDNY Vacates Arbitration Award for Party-Arbitrator’s Nondisclosures

    Toolbox Talk Series Recap – Arbitration Motion Practice
    Corporate Profile

    SEATTLE WASHINGTON BUILDING EXPERT
    DIRECTORY AND CAPABILITIES

    The Seattle, Washington Building Expert Group at BHA, leverages from the experience gained through more than 7,000 construction related expert witness designations encompassing a wide spectrum of construction related disputes. Drawing from this considerable body of experience, BHA provides construction related trial support and expert services to Seattle's most recognized construction litigation practitioners, commercial general liability carriers, owners, construction practice groups, as well as a variety of state and local government agencies.

    Building Expert News & Info
    Seattle, Washington

    Comparing Contracts: A Review of the AIA 201 and ConsensusDocs - Part II

    March 28, 2018 —
    Part II of this three-part series compares and analyzes important contract sections in the AIA 201 (2007 and 2017 versions) and ConsensusDocs (2014 and 2017 versions), including Schedule/Time, Consequential Damages/LDs, Claims and Disputes/ADR. Part I covered Financial Assurances, Design Risk, Project Management and Contract Administration. Part III will cover Insurance and Indemnification and Payment. SCHEDULE/TIME Relevant Sections:
    • 2007 & 2017 A201: Section 3.10.1
    • 2014 & 2017 ConsensusDocs: Section 6.2
    AIA:
    • Section 3.10.1 of the 2007 A201 requires that the Contractor promptly after being awarded the Contract, prepare and submit a construction schedule providing for Work to be completed within the time limits required in the Contract Documents.
    • This schedule shall be revised at appropriate intervals.
    • The 2017 edition breaks down the schedule to contain date of commencement, interim milestone dates, date of substantial completion, apportionment of Work by trade or building system, and the time required for completion of each portion of the Work.
    • Under section 3.10.2 of the 2007 and 2017 versions, if the Contractor fails to provide a submittal schedule, the Contractor is not entitled to any additional compensation or a time extension based on the Owner’s or the Architect’s slow processing of submittals, regardless of how long they take.
    ConsensusDocs 200:
    • The 2017 Contract replaces the term Contract Time and instead requires a “Schedule of the Work…formatted in detailed precedence-style critical path method that (a) provides a graphic representation of all activities and events, including float values that will affect the critical path of the Work and (b) identifies dates that are critical to ensure timely and orderly completion of the Work.”
    • The Constructor must submit an initial schedule to the Owner only before, “first application for payment” and thereafter on a monthly basis. (Section 6.2.1).
    • The Owner is allowed to change the sequences provided in the schedule as long as it does not “unreasonably interfere with the Work.” (Section 6.2.2).
    Reprinted courtesy of Michael Sams , Kenney & Sams and Amanda Cox, Kenney & Sams Read the court decision
    Read the full story...
    Reprinted courtesy of

    Not Everything is a Pollutant: A Summary of Recent Cases Supporting a Common Sense and Narrow Interpretation of the CGL's Pollution Exclusion

    October 26, 2020 —
    Those of us who suffered through law school are familiar with the argument that there are fundamental rules applicable to contract interpretation and that a certain contract language interpretation would “swallow the rule.” However, insurance companies have long advocated for an interpretation of the CGL policy’s pollution exclusion that would “swallow the coverage” that the insureds thought they were purchasing. Insurers have successfully argued in several states that the pollution exclusion’s definition of “pollutant” should be read literally, and be applied to any “solid, liquid, gaseous, or thermal irritant or contaminant including smoke, vapor, soot, fumes, acids, alkalis, chemicals, and waste.” As anyone with children can attest to, the range of items and substances that can be considered an “irritant” is limitless. The logical extent of the insurer’s interpretation brings to mind the high school student who, for his science fair project, convinced his fellow students to ban “dihydrogen monoxide.”1 Citing evidence such as the fact that everyone who has ever died was found to have consumed “dihydrogen monoxide,” he convinced them of the dangers of . . . water. Similarly, an overly expansive reading of the definition of “pollutant” could lead to the absurd result of even applying it to ubiquitous harmless substances such as water. The pollution exclusion, therefore, has run amok in many states and has allowed insurers to avoid liability for otherwise covered claims. Fortunately, insureds in many states have successfully argued that the pollution exclusion is subject to a more limited interpretation based on several different theories. For example, some courts have agreed that the pollution exclusion, as initially introduced by the insurance industry, should be limited to instances of traditional environmental pollution. Others have held that the exclusion is ambiguous as to its interpretation. The reasonable expectations of the insureds do not support a broad reading of the defined term “pollutant.” Below, this article addresses a number of recent decisions that have adopted a pro policyholder interpretation of the pollution exclusion. As with most insurance coverage issues, choice of law clearly matters. Reprinted courtesy of Philip B. Wilusz, Saxe Doernberger & Vita and Jeffrey J. Vita, Saxe Doernberger & Vita Mr. Wilusz may be contacted at pbw@sdvlaw.com Mr. Vita may be contacted at jjv@sdvlaw.com Read the court decision
    Read the full story...
    Reprinted courtesy of

    Contract Terms Can Impact the Accrual Date For Florida’s Statute of Repose

    October 19, 2017 —
    When the validity of a construction defect claim depends on whether the claim is barred by the applicable state’s statute of repose, it is important to review the statute to identify when claims subject to the statute of repose accrue. In Busch v. Lennar Homes, LLC, 219 So.3d 93 (Fla. Ct. App. (5th Dist.) 2017), the Court of Appeals of Florida clarified the accrual date for the statute of repose in cases where the accrual date depends on a construction contract’s completion date. Pursuant to Busch, the date of full performance under the contract, not the building’s purchase closing date, is the date on which claims accrue. In Busch, Timothy Busch (Busch), pursuant to a Purchase and Sale Agreement, contracted to have Lennar Homes build him a house. Nearly ten years after closing on the home, Busch served Lennar Homes with a notice of construction defects, as required by Florida’s right-to-repair act. Shortly thereafter, but more than 10 years after the home’s closing date, Busch filed suit against Lennar Homes, alleging that there were multiple construction defects associated with the home. Lennar Homes, relying on Florida’s statute of repose, Fla. Stat. § 95.11(3)(c), filed a motion to dismiss Busch’s complaint. Read the court decision
    Read the full story...
    Reprinted courtesy of William L. Doerler, White and Williams LLP
    Mr. Doerler may be contacted at doerlerw@whiteandwilliams.com

    Measures Landlords and Property Managers Can Take in Response to a Reported COVID-19 Infection

    May 18, 2020 —
    Most landlords and property managers are now familiar with steps they should be taking to reduce the spread of COVID-19. But what if a tenant or employee has tested positive with COVID-19? Unfortunately, many landlords and property managers are grappling with this very question. While there’s some clarity as it pertains to evictions in the landlord-tenant context, other considerations like disinfection, required notices, and maintenance, are evolving or unclear. Here are steps landlords and property managers can take in response to an employee or tenant testing positive with COVID-19. Measures Landlords Can Take for Employees For workplaces, there is a large variety of guidelines and procedures that are generally available to review. The Centers for Disease Control and Prevention (CDC) has valuable guidance available online here and here. The Occupational and Safety Health Administration (OSHA) has valuable guidance available online here. In short, if there is an incident where one employee may have exposed others to COVID-19, here are five steps employers should take:
    1. Send the affected employee home and instruct them not to return to work until the criteria to discontinue home isolation are met in consultation with healthcare providers, and state and local health departments. Make sure to maintain all information about employee illnesses as a confidential medical record.
    2. Ask the affected employee whether they have had close contact with any other workers.
    Reprinted courtesy of J. Kyle Janecek, Newmeyer Dillion and Jason L. Morris, Newmeyer Dillion Mr. Janecek may be contacted at kyle.janecek@ndlf.com Mr. Morris may be contacted at jason.morris@ndlf.com Read the court decision
    Read the full story...
    Reprinted courtesy of

    Surety Bond Producers Keep Eye Out For Illegal Waivers

    July 01, 2019 —
    The surety bond industry regularly reminds state and local governments, politely, that public works in all states must involve surety bonds. That’s the law. And the National Association of Surety Bond Producers, the bond brokers and agents trade group, has been letting state and local officials know, in writing. Read the court decision
    Read the full story...
    Reprinted courtesy of Richard Korman, ENR
    Mr. Korman may be contacted at kormanr@enr.com

    Beyond the Statute: How the Colorado Court Upheld Modified Accrual in Construction Contracts

    November 13, 2023 —
    In a case of first impression, the First Division of the Colorado Court of Appeals recently reviewed whether parties may contractually alter the accrual time established by Colorado’s statute of limitations for construction defect actions, C.R.S. § 13-80-104, in South Conejos Sch. Dist. RE-10 v. Wold Architects, Inc., 2023 COA 85 (2023), decided on September 21, 2023. The Court held that sophisticated parties may contractually alter the accrual time standards, enlarging the accrual time as was the issue in this case. Notably, the Court’s decision was made in the context of commercial construction, not residential. The issue in South Conejos Sch. Dist. RE-10 arose from the construction of a school in Antonito, Colorado. Prior to construction, the South Conejos School District RE-10 (the “School District”) and Wold Architects, Inc. (“Wold”) entered a contract that provided: Unless a longer period is provided by law, any action against [Wold] brought to recover damages for deficiency in the design, planning, supervision, inspection, construction or observation of construction or for injury to person or property shall be brought within two years after the claim for relief arises and is discovered by [the District]; … “Discovered” as used herein means detection and knowledge by [the District] of the defect in the improvement that ultimately causes the injury, when such defect is of a substantial or significant nature. Read the court decision
    Read the full story...
    Reprinted courtesy of Hal Baker, Higgins, Hopkins, McLain & Roswell, LLC
    Mr. Baker may be contacted at baker@hhmrlaw.com

    LA Metro To Pay Kiewit $297.8M Settlement on Freeway Job

    December 08, 2016 —
    The Los Angeles County Metropolitan Transportation Authority (LA Metro) has reached an agreement with Kiewit Corp. and will pay the contractor $297.8 million for project change orders on the Interstate 405-Sepulveda Pass Widening Project, in Los Angeles. Read the court decision
    Read the full story...
    Reprinted courtesy of Greg Aragon, Engineering News-Record
    ENR may be contacted at ENR.com@bnpmedia.com

    North Miami Beach Rejects as Incomplete 2nd Engineering Inspection Report From Evacuated Condo

    July 25, 2021 —
    North Miami Beach has rejected a new engineering inspection report provided by the Crestview Towers condominium association, keeping about 300 evacuated residents from returning to their apartments and raising new questions about engineering inspection reports in the aftermath of the Champlain Towers South collapse. Reprinted courtesy of Richard Korman, Engineering News-Record Mr. Korman may be contacted at kormanr@enr.com Read the full story... Read the court decision
    Read the full story...
    Reprinted courtesy of