Minnesota Civil Engineers Give the State's Infrastructure a "C" Grade for the Second Time
May 02, 2022 —
American Society of Civil EngineersSAINT PAUL, Mn. — The Minnesota Section of the
American Society of Civil Engineers (ASCE) today released preliminary findings from the 2022
Report Card for Minnesota's Infrastructure, with 10 categories of infrastructure receiving an overall grade of a 'C', meaning Minnesota's infrastructure is in mediocre condition. Minnesota has taken steps to make its infrastructure network more sustainable to withstand increasingly severe weather, but additional steps must be taken as the state's infrastructure is aging. Funding has been limited for systems throughout the state, particularly for surface transportation networks, and local and state funding must be increased to bring these critical systems up to speed. Civil engineers graded aviation (B), bridges (C), dams (C), drinking water (C-), energy (C), parks (B-), ports (C-), roads (D+), transit (C-) and wastewater (C).
"The ASCE report card serves as an important benchmark for where our infrastructure currently stands and lays out how we can make improvements," said Sen. Sandy Pappas, DFL-St. Paul. "Knowing that these systems play such a crucial role in economic progress and the safety of Minnesotan families, we have made infrastructure a topline issue and must continue to do so to secure a prosperous future here in Minnesota."
ABOUT THE AMERICAN SOCIETY OF CIVIL ENGINEERS
Founded in 1852, the American Society of Civil Engineers represents more than 150,000 civil engineers worldwide and is America's oldest national engineering society. ASCE works to raise awareness of the need to maintain and modernize the nation's infrastructure using sustainable and resilient practices, advocates for increasing and optimizing investment in infrastructure, and improve engineering knowledge and competency. For more information, visit www.asce.org or www.infrastructurereportcard.org and follow us on Twitter, @ASCETweets and @ASCEGovRel.
Read the court decisionRead the full story...Reprinted courtesy of
There’s the 5 Second Rule, But Have You Heard of the 5 Year Rule?
April 23, 2024 —
Garret Murai - California Construction Law BlogThey’re called deadlines for a reason. Usually, because something really bad could happen if you fail to meet the deadline.
For those in the construction industry, you probably aware of the “deadline” to bring a claim for latent defects (10 years from substantial completion); the deadline to file suit to foreclose on a mechanics lien (90 days from the date of recording the mechanics lien), and the deadline for serving a preliminary notice (generally, 20 days from the date labor and/or materials are first furnished).
Well, here’s another deadline: Under Code of Civil Procedure section 585.310, you have 5 years after a complaint is filed to bring a case to trial, absent the court granting relief. I could leave it at that, but in the next case, Oswald v. Landmark Builders, Inc., 97 Cal.App.5th 240 (2023), was too interesting to pass up.
The Oswald Case
On June 28, 2016, homeowners Jack Oswald and Anne Seley sued their general contractor and its subcontractors alleging construction defects at their home. Answers and cross-complaints were filed and on February 2017 the trial court determined the case to be complex and appointed a discovery master. A discovery master, for those who may be unfamiliar, is usually a retired judge or third-party lawyer appointed by a court to oversee discovery in a case such as written discovery, depositions, site inspections, etc.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
Utility Contractor Held Responsible for Damaged Underground Electrical Line
October 11, 2017 —
Brett M. Hill - Ahlers & Cressman, PLLCThe Washington State Court of Appeals recently addressed an excavation contractor’s responsibilities under the Underground Utilities Damage Prevention Act (UUDPA), RCW 19.122. That statute was enacted in 2011 and imposed certain statutory duties on parties involved with projects requiring excavation.
In this case, Titan Earthworks, LLC contracted with the City of Federal Way to perform certain street improvements including installation of a new traffic signal. During the process of excavating for the traffic signal, Titan drilled into an energized underground Puget Sound Energy power line. PSE sought damages from Titan and Titan sued the City of Federal Way.
Read the court decisionRead the full story...Reprinted courtesy of
Brett M. Hill, Ahlers & Cressman, PLLCMr. Hill may be contacted at
bhill@ac-lawyers.com
Nevada State Senator Says HOA Scandal Shows Need for Construction Defect Reform
November 13, 2013 —
CDJ STAFFA Nevada State Senator sees the ongoing HOA scandal as a sign that the state’s construction defect laws need to be revised. State Senator Mike Schneider says that the law “is flawed and actually makes it too easy to do what these folks have done.” What these folks have done has, of course, lead to a number of indictments and guilty pleas in federal court.
One problem that Senator Schneider points to in current Nevada construction defect law is that homeowner attorneys get 40% of any settlement, sometimes leaving homeowners without sufficient funds to repair the defects. “It’s gotten out of hand. We pay some outrageous costs and fees in this cases.”
Read the court decisionRead the full story...Reprinted courtesy of
South Adams County Water and Sanitation District Takes Proactive Step to Treat PFAS, Safeguard Water Supplies
November 28, 2022 —
Cameron McWilliam – Brown and CaldwellDENVER, Colo., Nov. 15, 2022 — The South Adams Country Water and Sanitation District (District) is enhancing its water treatment process to meet EPA Health Advisory Levels (HALs) for per- and polyfluoroalkyl substances (PFAS) in drinking water supplies.
Deemed “forever chemicals,” PFAS is a group of human-made chemicals used in many applications, including stain- and water-resistant fabrics and carpeting, cleaning products, paints, and firefighting foams. PFAS are resistant to grease, oil, water, and heat and may enter water supplies from landfills, the use of firefighting foam (e.g., at airports, fire training facilities, petroleum fires, etc.), industrial sites, and wastewater treatment plant discharge.
The District’s water supply, serving over 67,000 residents in Commerce City and parts of unincorporated Adams County, comes primarily from 13 groundwater supply wells. As it continues to meet all federal and state drinking water requirements, the District has been proactively pursuing PFAS reduction strategies since it first discovered a low-level presence in its water supply through voluntary testing in 2018. Upon discovery, the District stopped drawing from its most impacted wells and has been purchasing additional treated water to blend into its supply to reduce PFAS levels along with optimizing use of their existing granular activated carbon treatment system.
“Ever since the District first began voluntarily testing for PFAS, we have been monitoring for these compounds and working to reduce their impact on our customers,” said District Manager Abel Moreno. “The EPA has moved the goalposts, and we are taking steps to reduce the presence of PFAS even further. We are committed to finding long-term, sustainable solutions to offer our community high-quality drinking water.”
To tackle the challenge, the District has hired leading environmental and construction services firm Brown and Caldwell to design a new 18 million gallons per day (MGD) ion exchange (IX) process at its Klein Water Treatment Facility. IX treatment is currently the most effective technology in removing PFAS/PFOA, consisting of a highly porous resin that acts as a powerful magnet to adsorb and hold onto the substances. The new system at the Klein facility will consist of seven IX treatment trains, a 375,000-gallon equalization tank, and six vertical turbine pumps to feed the IX trains from the District’s 13 groundwater supply wells.
Furthermore, nine 5-micron cartridge filters will be installed to remove particulate matter in the water before reaching the IX trains, thus increasing the efficacy of the treatment process.
Scheduled for completion by the end of 2026, the new IX treatment facility will provide a peak combined capacity of 26 MGD.
About South Adams County Water and Sanitation District
The South Adams County Water and Sanitation District is a special district providing water and sanitary sewer service to over 67,000 residents in Commerce City and parts of unincorporated Adams County. For more information about the District, please visit www.sacwsd.org
About Brown and Caldwell
Headquartered in Walnut Creek, California., Brown and Caldwell is a full-service environmental engineering and construction services firm with 52 offices and 1,800 professionals across North America and the Pacific. For 75 years, our creative solutions have helped municipalities, private industry, and government agencies successfully overcome their most challenging water and environmental obstacles. As an employee-owned company, Brown and Caldwell is passionate about exceeding our clients’ expectations and making a difference for our employees, our communities, and our environment. For more information, visit www.brownandcaldwell.com
Read the court decisionRead the full story...Reprinted courtesy of
Professor Stempel's Excpert Testimony for Insurer Excluded
October 07, 2019 —
Tred R. Eyerly - Insurance Law HawaiiThe court denied Daubert motions for several experts with the exception of Professor Stempel's expert testimony opining that the insurer did not act in bad faith Adell Plastics, Inc. v. Mt. Hawley Ins. Co., 2019 U.S. Dist. LEXIS 102942 (D. Md. June 19, 2019).
A fire demolished several buildings at Adell's facility. Adell was insured under a commercial property policy issued by Mt. Hawley. Mt. Hawley sued Adell, seeking a declaration that it owed no coverage, and requesting recoupment of a substantial advance payment. Adell filed a counterclaim, alleging that Mt. Hawley had breached the policy and had acted with a lack of good faith. Before the court were several pretrial motions, including motions to exclude testimony of eight expert witnesses.
The court denied Adell's motion to exclude several experts to be called by Mt. Hawley. The accountant's testimony was relevant. Adell had to prove damages on its breach of contract claim, and the accountant's testimony would aid the jury in evaluating Adell's documentation and calculating documented damages. Mt. Hawley's fire safety expert investigated the Adell fire. Mt. Hawley had shown that his expert opinion would be sufficiently reliable for admissibility. Further, three fire protection engineers offered by Mt. Hawley and two fire protection engineers to be called by Adell were allowed to testify. Each expert based his investigation and conclusions on the standards of fire investigation as set out in the NEPA Guide for Fire and Explosion Investigations. This was a fire insurance case, and fire protection engineers would be allowed to testify and illuminate the circumstances of the fire.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Denial of Motion to Dissolve Lis Pendens Does Not Automatically Create Basis for Certiorari Relief
November 16, 2023 —
David Adelstein - Florida Construction Legal UpdatesA recent appellate decision out of Florida’s Sixth District Court of Appeal holds that a trial court’s denial of motion to dissolve a lis pendens does NOT automatically give a basis for a petition for a writ of certiorari. Generalized allegations of “irreparable harm” to support the basis for the petition for writ of certiorari are insufficient. Rather, the party moving for the petition MUST clearly demonstrate the irreparable harm; otherwise, the petition for writ of certiorari will fail.
A lis pendens has legal significance. It is a recorded document that notifies the world that there is a pending lawsuit dealing with the real property at issue. This is important because who wants to buy a piece of property that is subject to litigation – that would be a risky transaction!
In CPPB, LLC v. Taurus Apopka City Center, LLC, 48 Fla.L.Weekly D1837a (Fla. 6th DCA 2023), a dispute arose as to a real estate transaction. The owner sold a parcel to a buyer. The owner also owned three adjacent parcels. As part of the transaction, the buyer agreed to perform certain improvements to all of the parcels including those adjacent parcels owned by the owner. The owner deposited funds in escrow for purposes of its share of the improvements. A payment dispute arose regarding the improvements and the buyer sued the seller. The seller filed a counterclaim to rescind the transaction along with a recorded lis pendens on the parcel purchased by the buyer. The buyer moved to dissolve the lis pendens which the trial court denied. This prompted the appeal – a petition for a write of certiorari based on the trial court’s denial of the motion to dissolve the lis pendens.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Hurricane Warning: Florida and Southeastern US Companies – It is Time to Activate Your Hurricane Preparedness Plan and Review Key Insurance Deadlines
November 01, 2022 —
Andrea DeField, Walter J. Andrews, Michael S. Levine, Lawrence J. Bracken II & Cary D. Steklof - Hunton Insurance Recovery BlogHurricane Ian is rapidly approaching the west coast of Florida and is expected to make landfall as a Category 4 hurricane near the Tampa area within the coming days. While the exact track is still being determined, there is a chance the storm may also impact insureds in Georgia and South Carolina. Now is the time to activate your disaster plan and ensure that you have your relevant insurance policies in your possession and that you review them for critical deadlines.
We put together an
alert here with tips to help you and your business mitigate potential storm loss and maximize coverage.
Reprinted courtesy of
Andrea DeField, Hunton Andrews Kurth,
Walter J. Andrews, Hunton Andrews Kurth,
Michael S. Levine, Hunton Andrews Kurth,
Lawrence J. Bracken II, Hunton Andrews Kurth and
Cary D. Steklof, Hunton Andrews Kurth
Ms. DeField may be contacted at adefield@HuntonAK.com
Mr. Andrews may be contacted at wandrews@HuntonAK.com
Mr. Levine may be contacted at mlevine@HuntonAK.com
Mr. Bracken may be contacted at lbracken@HuntonAK.com
Mr. Steklof may be contacted at csteklof@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of