South Carolina Clarifies the Accrual Date for Its Statute of Repose
March 18, 2019 —
William L. Doerler - The Subrogation StrategistIn Lawrence v. General Panel Corp., 2019 S.C. LEXIS 1, No. 27856 (S.C. Jan. 1, 2019), the Supreme Court of South Carolina answered a certified question related to South Carolina’s statute of repose, S.C. Code § 15-3-640,[1] to wit, whether the date of “substantial completion of the improvement” is always measured from the date on which the certificate of occupancy is issued. The court held that a 2005 amendment to § 15-3-640 did not change South Carolina law with respect to the date of substantial completion. Thus, under the revised version of § 15-3-640, “the statute of repose begins to run at the latest on the date of the certificate of occupancy, even if there is ongoing work on any particular part of the project.” A brief review of prior case law may assist with understanding the court’s ruling in Lawrence.
In Ocean Winds Corp. of Johns Island v. Lane, 556 S.E.2d 377 (S.C. 2001), the Supreme Court of South Carolina addressed the question of whether § 15-3-640 ran from substantial completion of the installation of the windows at issue or on substantial completion of the building as a whole. Citing § 15-3-630(b),[2] the court found that the windows “were ‘a specified area or portion’ of the larger condominium project” and, upon their incorporation into the larger project they could be used for the purpose for which they were intended. Thus, the court held that “the statute of repose began running when installation of the windows was complete.”
Read the court decisionRead the full story...Reprinted courtesy of
William L. Doerler, White and WilliamsMr. Doerler may be contacted at
doerlerw@whiteandwilliams.com
Drone Use On Construction Projects
June 05, 2023 —
Brent N. Mackay - ConsensusDocsThe use of drones, or small unmanned aircraft systems (“UAS”), has become common throughout the construction industry in all phases of construction, including pre-construction, progress of the work, project closeout, and maintenance. This article examines the federal regulations related to drone use, as well as considerations for construction professionals related to state and local laws, project location, and weather issues.
Federal Regulations
Regardless of the state in which the project is located, companies and persons operating commercial drones must observe regulations promulgated by the Federal Aviation Administration (“FAA”), which has the exclusive authority to regulate aviation safety, airspace navigation, and air traffic control.
Reprinted courtesy of
Brent N. Mackay, Watt, Tieder, Hoffar, & Fitzgerald, LLP (ConsensusDocs)
Mr. Mackay may be contacted at bmackay@watttieder.com
Read the court decisionRead the full story...Reprinted courtesy of
Pennsylvania Supreme Court Denies Review of Pro-Policy Decision
October 22, 2014 —
Beverley BevenFlorez-CDJ STAFFAccording to McCarter & English, LLP, “product manufacturers relied on commercial general liability policies to defend and indemnify them for product liability claims,” however, in result of the Pennsylvania Supreme Court’s decision in Kvaerner Metals Division of Kvaerner U.S., Inc. v. Commercial Union Ins. Co., 908 A.2d 888 (Pa. 2006), “[i]nsurers began denying coverage to Pennsylvania companies – and companies around the country – arguing that a design or manufacturing defect was not an ‘accident.’” McCarter & English, LLP reported that “the tide has begun to turn, and product manufacturers may once again be reliably protected by from product liability claims.”
Read the court decisionRead the full story...Reprinted courtesy of
Lakewood Introduced City Ordinance to Battle Colorado’s CD Law
September 24, 2014 —
Beverley BevenFlorez-CDJ STAFFAccording to The Denver Post, the Lakewood City Council “introduced an ordinance that would make it more difficult for homeowners associations to sue developers for construction defects and give builders more opportunity to fix problems before litigation begins.” A hearing and final vote is scheduled for October 13th.
"If there are defects, we want to get them fixed rather than dragging this through the courts for years," Lakewood Mayor Bob Murphy told The Denver Post. Murphy believes the ordinance will bring “more diverse housing options to Lakewood, especially around stations along the Regional Transportation District’s West Rail Line.” Lakewood’s City Planner Travis Parker also declared that the defects law is to blame for the lack of condos in the area.
However, some believe that “Lakewood is overstepping its bounds as a home-rule city,” according to The Denver Post. "What they're trying to do is use an ordinance to circumvent state law in order to make it impossible for homeowners to seek redress against builders for defects," Molly Foley-Healy an attorney who serves as legislative liaison for the Community Associations Institute's Legislative Action Committee told the Post. “Mayor Murphy needs to incentivize quality construction in Lakewood instead.”
Read the court decisionRead the full story...Reprinted courtesy of
Unfortunate Event Test Leads to Three Occurrences
December 02, 2015 —
Tred R. Eyerly – Insurance Law HawaiiThe Second Circuit affirmed the finding of three occurrences in a highway accident after applying the unfortunate event test. Nat'l Liability & Fire Ins. Co. v. Itzkowitz, 2015 U.S. App. LEXIS 16387 (2nd Cir. Sept. 15, 2015).
A dump box attached to a dump truck struck and damaged an overpass. The dump box then separated from the truck and landed in the right lane of the highway. Some thirty seconds to five minutes later, the Itzkowitz vehicle struck the detached dump box. Then, at some point between a few seconds and twenty minutes later, the Hershkowitz (second) vehicle struck the dump box.
The insurer for the dump truck owner, National, argued there was one accident, or at most two separate accidents, under the policy. The district court found there were three occurrences and National appealed.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Language California Construction Direct Contractors Must Add to Subcontracts Beginning on January 1, 2022, Per Senate Bill 727
December 20, 2021 —
William L. Porter - Porter Law GroupSenate Bill No. 727, Imposing Liability on Contractors for Wage Claims of Subcontractor Employees:
California Senate Bill 727 was approved by the Governor on September 27, 2021. The new Act amended Labor Code Section 218.7 and added a new section 218.8 to the Labor Code. Both Labor Code sections impose on “direct contractors” in the construction industry (defined by Civil Code 8018 as “a contractor that has a direct contractual relationship with an owner”) liability for the wage violations of their subcontractors and sub-subcontractors at any tier when working on California private construction projects.
Specifically, new Section 218.8 expands the liability of direct contractors for wage claims of the employees of subordinate subcontractors on projects for contracts executed beginning on January 1, 2022. The liability of the direct contractor under Labor Code 218.8 will include “any debt owed to a wage claimant or third party on the wage claimant’s behalf, incurred by a subcontractor at any tier acting under, by, or for the direct contractor.” Specifically included as listed liabilities of the direct contractor are: “any unpaid wage, fringe or other benefit payment or contribution, penalties or liquidated damages, and interest owed by the subcontractor on account of the performance of the labor.”
Read the court decisionRead the full story...Reprinted courtesy of
William L. Porter, Porter Law GroupMr. Porter may be contacted at
bporter@porterlaw.com
Meet Daniel Hall, Assistant Professor at TU Delft
January 17, 2023 —
Aarni Heiskanen - AEC BusinessWe sat down with
Daniel M. Hall, an assistant professor at
TU Delft, to discuss ways of achieving circularity in the built environment. Daniel will be a keynote speaker at WDBE in September 2023, where he’ll talk more about future circular cities.
Daniel is internationally known for his research on construction management and construction informatics. He did his Ph.D. at Stanford and worked for almost five years as an Assistant Professor of Innovative and Industrial Construction at ETH Zurich. In September 2022, he moved to the Netherlands.
The Delft University of Technology, Daniel’s new home base, strongly emphasizes the circular economy and circularity and has a long history of excellent teaching and research. It provides an inspiring environment for innovating the future.
Why we need to improve circularity in cities
“We cannot keep building the way we’ve been building. We don’t have enough resources; we don’t have enough materials,” Daniel asserts. “Obviously, we have questions around carbon impact. Around 40 percent of all CO2 emissions come from a combination of building operations and building materials.”
Read the court decisionRead the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
How Technology Reduces the Risk of Façade Defects
March 20, 2023 —
Ori Aphek - Construction ExecutiveThe shell of the building is an onlooker’s first impression and crafts the architectural aesthetic, but it also plays a crucial role in enabling energy efficiency and protecting against the elements. Because façades are in direct contact with the elements, issues with water intrusion are the most common problem and the costliest to remedy, with anywhere from 30% to 70% of lawsuits related to water intrusion, half of it through the façade. Additionally, improperly installed façades pose significant safety risks because unsecured parts can fall and hit people below.
All these factors contribute to the façade being one of the most complex and costly aspects of a building to construct and inspect, making up 205 of the total project cost. Installing these systems correctly the first time is the most effective way to mitigate these threats. Teams should utilize data-informed technology that ensures plan adherence, reducing risk and avoiding errors during installation.
The Challenges of Façade Installation
Façade installation and subsequent inspection are inherently challenging, particularly for high-rise buildings. When performing post-installation verification manually, inspectors must review every element, joint by joint, window by window, stone by stone and brick by brick, which can take months to complete. Inspections of the entire building system are limited by this process, as inspectors can only access one portion of the building façade at a time and often have to inspect from indoors, on balconies or at the ground level, which doesn’t paint a complete picture. As a result, teams typically only perform spot checks on the façade and are rarely inspected to their fullest. This leaves many installation errors and defects, which serve as ticking bombs for future water intrusion or safety hazards.
Reprinted courtesy of
Ori Aphek, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of