No Coverage for Hurricane Sandy Damage
August 02, 2017 —
Tred R. Eyerly - Insurance Law HawaiiThe magistrate recommended that summary judgment be entered in favor of the insurer, thereby eliminating coverage for property damage incurred during Hurricane Sandy. Madelaine Chocolate Novelties, Inc. v. Great Northern Ins. Co., 2017 U.S. Dist. LEXIS 103015 (E.D. N.Y. June 30, 2017).
Madelaine Chocolate owned a facility three blocks form the Atlantic Ocean and one block from the Jamaica Bay section of Long Island Sound. Hurricane Sandy arrived October 29, 2012. Madeline Chocolate's facility sustained significant damage to its inventory, production machinery and premises, as storm surge from both bodies of water hit the property. Operations ceased during the 2012 holiday season and beyond, resulting in millions of dollars in lost income.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly - Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Federal District Court Addresses Material Misrepresentation in First Party Property Damage Claim
August 26, 2024 —
James M. Eastham - Traub LiebermanIn Pittsfield Dev. LLC v. Travelers Indem. Co., 2024 U.S. Dist. LEXIS 117530 (N.D. Ill. July 3, 2024), the United States District Court for the Northern District of Illinois addressed an alleged material misrepresentation by an insured during the course of the adjustment of a water loss claim at an insured property. Subsequent to a pipe burst event which caused damage to a number of the floors in the insured building, the insured submitted a claim to Travelers and also submitted, with the assistance of a retained public adjuster, a damage estimate of the damages at the property. Included within the estimate submitted by the insured was a line item for "Lead Paint & Asbestos Removal" with a corresponding dollar amount of $1,140,000. It was this line item which formed the basis of Travelers' claim of misrepresentation.
At his deposition, the public adjuster testified that the $1,140,000 figure was an oral estimate received over the phone from an asbestos remediation company. Travelers disputed the testimony and contended that no such estimate was ever provided. For support, Travelers pointed to deposition testimony from a remediation company employee that while rough estimates were occasionally given verbally, the largest over the phone estimate she could recall was in the $20,000-$25,000 range. It was also disputed that the company would ever provide an oral quote of that magnitude sight unseen, especially since the largest project the remediation company had ever completed was less than $250,000.
Read the court decisionRead the full story...Reprinted courtesy of
James M. Eastham, Traub LiebermanMr. Eastham may be contacted at
jeastham@tlsslaw.com
Eighth Circuit Remands to Determine Applicability of Collapse Exclusion
January 06, 2012 —
Tred R. Eyerly - Insurance Law HawaiiThe Eighth Circuit determined a jury instruction regarding the applicability of the "all-risk" policy’s exclusion for "collapse" was inadequate. See KAAPA Ethanol, LLC v. Affiliated FM Ins. Co., 2011 U.S. App. LEXIS 22158 (8th Cir. Nov. 3, 2011).
KAAPA had nine large, cylindrical, stainless steel tanks fabricated at its location. Soon after operations began in 2003, some of the tanks experienced unusual movement and began to shift. A geotechnical engineer found "silty clay" had been used for infill instead of compacted granular fill called for in engineering drawings. A year long plan to repair all nine tanks was implemented.
Affiliated’s "all-risk" policy excluded damage caused by faulty workmanship. It also excluded damage caused by settling or cracking. The settling exclusion went on to provide, "This exclusion will not apply to loss or damage resulting from collapse of: a building or structure; or material part of a building or structure." Affiliated denied coverage because of the faulty workmanship and settling exclusions.
Read the full story…
Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com
Read the court decisionRead the full story...Reprinted courtesy of
New Jersey Firm’s Fee Action Tossed for not Filing Substitution of Counsel
August 13, 2014 —
Beverley BevenFlorez-CDJ STAFFEven though their client had terminated their services by email, a “New Jersey appeals court has tossed out a firm’s fee action” finding that the firm had “remained counsel of record because it did not file a substitution of counsel until almost a year later,” the New Jersey Law Journal reported.
In Arturi, D’Argenio, Guagliardi & Meliti v. Sadej, Jesse and Carla Sadej had retained the firm, Arturi, D’Argenio, Guagliardi & Meliti, “to defend them in the underlying land use litigation brought in 2002 by the borough of Seaside Park, N.J.” The case had been dismissed, but was reinstated in 2009 by an appeals court.
At that time, Arturi D’Argenio told the Sadejs that they would need to sign a new retainer agreement in order to continue representation. On July 18, 2010, the Sadejs emailed the firm stating that they were “officially terminated,” according to the opinion as quoted by the New Jersey Law Journal.
The firm sued the Sadejs “for about $100,000 in fees it was allegedly owed from the Seaside Park case and other matters on behalf of Jesse Sadej.” However, a substitution of attorney wasn’t filed until months later.
The case went to the appeals court, which stated that the firm should have withdrawn immediately after receiving the email notification from their client: “Because it failed to do so, it remained counsel of record and therefore was precluded from initiating the collection action at that point,” the judges said, as quoted by the New Jersey Law Journal.
Read the court decisionRead the full story...Reprinted courtesy of
Work without Permits may lead to Problems Later
September 10, 2014 —
Beverley BevenFlorez-CDJ STAFFAccording to the Los Angeles Register, “Southern California homeowners often have repairs or improvements done to their property without getting the required building permits,” which sometimes, may be fine, but other times it leads to disastrous problems.
The Register used an example of a San Clemente couple who had issues selling their home when a building inspector found that weep screeds were covered up by a cement deck installed by a contractor. The contractor also failed to get building permits for the work that was done. The buyer stated that repairs needed to be done prior to the sale.
According to Mac MacKenzie, an agent at Coldwell Banker in Irvine, the situation is not uncommon: “We’ve had (permit problems) kill deals before, and we’ve had them almost kill deals. If it’s serious enough, it can stop a transaction from closing.”
Permits are generally required “for any alteration, major repairs or new construction,” according to the Register, while they are not necessary “for minor repairs, such as fixing leaky pipes, painting, new carpeting or new kitchen countertops.”
Read the court decisionRead the full story...Reprinted courtesy of
After 60 Years, I-95 Is Complete
September 10, 2018 —
Riley Griffin - BloombergAcross the U.S., public infrastructure is crumbling because of legislative gridlock and chronic underfunding. Roads are overcrowded, bridges are well past their expiration date, and transit systems regularly face unprecedented delays. But there will be one thing to celebrate as you seethe in beach traffic this weekend—a small, strange gap in I-95 is being filled.
Come September, one of the most audacious public infrastructure projects in U.S. history will be completed after more than six decades of work. Interstate 95 was the crown jewel of the American highway system championed by President Dwight Eisenhower, and yet the plan for an artery stretching the length of the East Coast almost didn’t happen—because of local lawmakers and land-owners in Mercer County, New Jersey.
Read the court decisionRead the full story...Reprinted courtesy of
Riley Griffin, Bloomberg
What Every Project Participant Needs to Know About Delay Claims
August 05, 2024 —
Andrew G. Vicknair - The Dispute ResolverA “delay” on a construction project is defined as the stretching out of the time for completion of certain key milestone scopes of work which can impact the completion date of an entire project, due to some circumstances or events that were not reasonably anticipated when the project began. 2 Construction Law ¶ 6.01 (Matthew Bender, 2024). While delays can be caused by any number of events, the most common are defective plans and specifications; design changes; severe weather and other, similar unforeseeable events; unforeseen or differing site conditions; unavailability of materials or labor; labor inefficiencies or stoppages; contractor negligence; and owner influences, including construction changes or outright interference by the owner or its agents. If the project schedule is not recovered following a delay, then the project schedule will likely be extended, resulting in an increase in the contractor’s costs of performance. A contractor that has experienced a delay on a project can take certain actions to pursue recovery of any damages the contractor may have incurred. However, to do so it is important to understand the different types of delays and the methods for establishing the delays.
I. Types of Delays
Delays may be categorized as (1) critical versus non-critical delays, (2) excusable versus non-excusable delays, and (3) compensable versus non-compensable delays. A critical delay is a delay that affects the project completion date and delays the entire project. In essence, a critical delay is one that will extend the critical path of a project. A non-critical delay is a delay that has no effect on the project’s critical path. Courts have recognized that delays to work not on the critical path will generally not delay the completion of a project. G.M. Shupe, Inc. v U.S., 5 Cl. Ct. 662, 728 (1984). Such a non-critical delay may affect the completion of certain activities, but does not affect the completion date of the entire project. In order for a delay to provide the basis for a claim for additional time or money, the delay must impact critical path activities on the project schedule.
Read the court decisionRead the full story...Reprinted courtesy of
Andrew G. Vicknair, D'Arcy Vicknair, LLCMr. Vicknair may be contacted at
agv@darcyvicknair.com
Builder Waits too Long to Dispute Contract in Construction Defect Claim
May 10, 2012 —
CDJ STAFFThe Louisiana Court of Appeals has affirmed the lower court’s judgment in the case of Richard v. Alleman. The Richards initiated this lawsuit under Louisiana’s New Home Warranty Act, claiming that they had entered into a construction contract with Mr. Alleman and that they quickly found that his materials and methods had been substandard. They sued for the cost of repairing the home and filing the lawsuit. Mr. Alleman countersued, claiming the Richards failed to pay for labor, materials, and services. By his claim, they owed him $12,838.80.
The trial court split the issues of liability and damages. In the first trial, the court concluded that there was a contact between Alleman and the Richards and that the New Home Warranty Act applied. Mr. Alleman did not appeal this trial.
The second trial was on the issue of damages. Under the New Home Warranty Act, the Richards were found to be entitled to $36,977.11 in damages. In a second judgment, the couple was awarded $18,355.59 in attorney’s fees. Mr. Alleman appealed both judgments.
In his appeal, Alleman contended that the trial court erred in determining that the Home Warranty Act applied. This was, however, not the subject of the trial, having been determined at the earlier trial. Nor did the court accept Alleman’s claim that the Richards failed to comply with the Act. The trial record made clear that the Richards provided Alleman with a list of problems with their home by certified mail.
The court did not establish whether the Richards told Alleman to never return to their home, or if Alleman said he would never return to the home, but one thing was clear: Alleman did not complete the repairs in the list.
A further repair was added after the original list. The Richards claimed that with a loud noise, a large crack appeared in their tile flooring. Mr. Alleman stated that he was not liable for this as he was not given a chance to repair the damage, the Richards hired the flooring subcontractors, and that the trial court rejected the claim that the slab was defective. The appeals court found no problem with the award. Alleman had already “refused to make any of the repairs.”
Finally Alleman made a claim on a retainage held by the Richards. Since Alleman did not bring forth proof at trial, the appeals court upheld the trial courts refusal to award a credit to Alleman.
Read the court’s decision…