Flexible Seattle Off-Ramp Would Retain Shape in Quake
November 23, 2016 —
Tim Newcomb – Engineering News-RecordMoving from the lab to the field, a highway off-ramp bridge under construction in Seattle features memory-retaining metal rods and bendable concrete designed to provide the structure with flexibility sufficient to withstand a major seismic event.
Read the court decisionRead the full story...Reprinted courtesy of
Tim Newcomb, Engineering News-RecordEngineering News-Record may be contacted at
ENR.com@bnpmedia.com
A Court-Side Seat: Flint Failures, Missed Deadlines, Toad Work and a Game of Chicken
October 05, 2020 —
Anthony B. Cavender - Gravel2GavelThe last few weeks have yielded a number of interesting developments in the Federal courts.
FEDERAL COURTS OF APPEAL
In re Flint Water Cases
Several local and State of Michigan officials, including the former governor, requested dismissal from the civil litigation seeking damages for the massive failure of Flint, Michigan’s public drinking water system. On August 5, 2020, the U.S. Court of Appeals for the Sixth Circuit agreed that the plaintiffs, residents of Flint, have successfully pled a case that the conduct of the defendants so “shocked the conscience” that a claim for a violation of their substantive due process rights was appropriately alleged. The defendants, including the former governor, argued that they were entitled to a qualified immunity defense. The court rejected this argument on the basis of the earlier decisions made by the court in this matter. Judge Sutton concurred because he was bound by this precedent, but remarked that the evidence for the governor’s culpability was very thin; he was not intimately connected to the extraordinary error in judgment. The majority was very upset with this concurrence as indicted by their own opinion.
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com
Court Upholds Denial of Collapse Coverage Where Building Still Stands
October 02, 2018 —
Tred R. Eyerly - Insurance Law HawaiiThe Michigan Court of Appeals affirmed the trial court's decision finding the policy's collapse coverage did not apply. Cmty. Garage v. Auto-Owners Ins. Co., 2018 Mich. App. LEXIS 2680 (Mich. Ct. App. June 19, 2018).
The insured operated a truck repair business. In June 2016, the insured's place of business sustained damage due to failure of several trusses providing structural support to the building's roof. The failure was due to latent construction defects leading to an insufficient load bearing capacity. The roof began to sag while one of the walls bulged outward due to the sudden pressure overload. The insured hired a construction firm to install temporary shoring to support the roof and prevent further damage. All of the building's walls remained standing and, although the roof sagged, it also remained intact. However, the building could not be safely occupied until repairs were completed.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Federal District Court Dismisses Property Claim After Insured Allows Loss Location to Be Destroyed Prior to Inspection
September 29, 2021 —
James M. Eastham - Traub LiebermanIn BMJ Partners LLC v. Arch Specialty Insurance Co., No. 20-CV-03870, 2021 WL 3709182 (N.D. Ill. Aug. 20, 2021), the United States District Court for the Northern District of Illinois dismissed, with prejudice, a coverage action filed by an insured based on a failure to comply with a request to inspect the involved property under Rule 34 of the Federal Rules of Civil Procedure. The loss at issue involved a hail-damaged building in Carpentersville, Illinois. During the discovery phase of the litigation, the property insurer served a request to inspect the subject property under FRCP Rule 34. After ignoring numerous requests to schedule the inspection, the insurer filed a motion to dismiss for failure to prosecute or, alternatively, to compel an inspection. After the motion was filed, a status hearing was conducted where the insured’s counsel advised the Court of his intention to file a motion to withdraw from representation of the insured. After the date set to file the motion to withdraw passed without anything being filed, the Court entered an order directing the insured to show cause why the matter should not be dismissed for lack of prosecution.
In response to the order to show cause, the insured advised the Court that instead of responding to the property insurer’s discovery requests, the insured sold the property to a buyer who subsequently tore down the building. In light of what the Court described as the insured’s “flabbergasting admission”, the Court was compelled to grant the motion to dismiss and do so with prejudice. In support of the “extreme sanction” of dismissing the matter with prejudice, the Court first noted that the insured had not come close to justifying a discharge of the pending show-cause order. Rather, the insured’s responsive filing refers to the Court's show cause order only indirectly and does not deny, or offer any justification for, disregarding case-related communications for several months. Even if that were not enough, the Court further held that the insured’s spoliation of evidence likewise provides sufficient basis for dismissal given that Courts have inherent authority to sanction parties for failure to preserve potential evidence. According to the Court, dismissal with prejudice was the only appropriate sanction in light of the insured’s violation of the obligation to preserve the property. Not only did the insured ignore multiple requests from the insurer to inspect, but during the same time frame the insured found time to allow inspections of the building as part of the sale by both the Village of Carpentersville and the property's buyer.
Read the court decisionRead the full story...Reprinted courtesy of
James M. Eastham, Traub LiebermanMr. Eastham may be contacted at
jeastham@tlsslaw.com
Stair Collapse Points to Need for Structural Inspections
November 27, 2013 —
CDJ STAFFThe exterior stairways at the Nutmeg Woods apartments in New London, Connecticut have lead to injuries three times in the last three years, with the most recent failure causing fatal injuries. Despite the annual injuries, the city has not been inspecting the stairways on an annual basis. Calvin Darrow, New London’s fire marshal, told The Day, a New London newspaper, that these inspections are supposed to occur annually, but tend to come about once every five years. Mr. Darrow ascribed the matter to staffing issues.
The stairways have now received a preliminary inspection by a structural engineer, and building and fire officials. Kirk Kripas told the paper that the Building Department was still attempting to determine when the stairs were built.
Read the court decisionRead the full story...Reprinted courtesy of
Homeowner’s Claims Defeated Because “Gravamen” of Complaint was Fraud, not Breach of Contract
September 29, 2021 —
Garret Murai - California Construction Law BlogBe careful what you wish for or, as in the next case, what you plead. In Vera v. REL-BC, LLC, Case Nos. A155807, A156823, and A159141 (June 30, 2021) 1st District Court of Appeal, a the buyer of a remodeled home who asserted breach of contract and fraud claims against a developer discovered that her claims, including her breach of written contract claim, was subject to a shorter 3 year statute of limitations because the “gravamen” of her complaint was fraud.
The REL-BC Case
Homeowner Adriana Vera purchased a remodeled home in Oakland, California from developers REL-BC, LLC and SNL Real Estate Solutions, LLC. The developers had purchased the home in July 2011, remodeled it, and sold it to Vera in November 2011.
As is typical in such transactions, the purchase agreement for the house required that the sellers disclose known material facts and defects affecting the property. In their disclosure, the sellers stated that they were not aware of any significant defects or malfunctions with respect to the property. The disclosure also stated that the sellers were not aware of any water intrusion issues with respect to the property.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
Judgment Proof: Reducing Litigation Exposure with Litigation Risk Insurance
March 04, 2024 —
Latosha M. Ellis & Charlotte Leszinske - Hunton Insurance Recovery BlogIt is not just your imagination: verdicts are getting bigger. So-called “nuclear verdicts” have increased in size and frequency over the past decade, particularly after the COVID-19 pandemic. Litigation risk insurance is a little known, but highly effective, option meant to compliment traditional insurance products and provide additional protection for policyholders nervous about litigation exposure.
Unfortunately, it is difficult to predict the exposure presented by any particular case. Between 2020 and 2022, the median
verdict increased 95%—from $21.5 million to $41.1 million. In
2022, a jury handed down a verdict worth $7.3 billion for injury to a single plaintiff. Even if an injury or loss is minor, juries have shown that they are willing to penalize corporate defendants with punitive damages that significantly exceed the award of compensatory damages. With such uncertainty and millions (if not billions) at stake, companies can reduce risk with litigation risk insurance.
Three key types of litigation risk insurance include: (1) punitive wrap insurance, (2) adverse judgment insurance, and (3) judgment preservation insurance.
Reprinted courtesy of
Latosha M. Ellis, Hunton Andrews Kurth and
Charlotte Leszinske, Hunton Andrews Kurth
Ms. Ellis may be contacted at lellis@HuntonAK.com
Ms. Leszinske may be contacted at cleszinske@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
Colorado’s Federal District Court Finds Carriers Have Joint and Several Defense Duties
October 10, 2013 —
Bret Cogdill — Higgins, Hopkins, McLain & Roswell, LLC.An issue that has plagued builders in Colorado construction defect litigation is the difficulty of getting additional insured carriers to fully participate in the builder’s defense, oftentimes leaving the builder to fund its own defense during the course of the litigation.
Many additional insurers offer a variety of positions regarding why they will not pay for fees and costs during the course of a lawsuit. Some insurers argue that, until after trial, it is impossible to determine its proper share of the defense, and therefore cannot make any payments until the liability is determined as to all of the potentially contributing policies. (This is often referred to as the “defense follows indemnity” approach.) Others may make an opening contribution to defense fees and costs, but fall silent as fees and costs accumulate. In such an event, the builder may be forced to fund all or part of its own defense, while the uncooperative additional insured carrier waits for the end of the lawsuit or is faced with other legal action before it makes other contributions.
Recent orders in two, currently ongoing, U.S. District Court cases provide clarity on the duty to defend in Colorado, holding that multiple insurers’ duty to defend is joint and several. The insured does not have to go without a defense while the various insurers argue amongst themselves as to which insurer pays what share.
Read the court decisionRead the full story...Reprinted courtesy of
Bret CogdillBret Cogdill can be contacted at