Cincinnati Team Secures Summary Judgment for Paving Company in Trip-and-Fall Case
February 05, 2024 —
Lewis BrisboisCincinnati, Ohio (January 25, 2024) - In a recent decision by the Oldham County Circuit Court, Lewis Brisbois Partner Andrew Weber and Associate Jason Paskan obtained summary judgment for a paving company client after successfully arguing that their client did not owe the plaintiff a duty at the time leading up to her trip and fall. Although the court concluded that there was a genuine issue of fact as to whether a parking space wheel stop actually caused her fall, the court noted that whether the wheel stop “constituted an unreasonably dangerous condition necessitating a duty to eliminate them or warn of them is an entirely different matter.” Rebecca Reynolds v. Baptist Healthcare System, Inc., et al., Oldham Circuit Court Case No. 21-CI-00236, *6 (Dec. 21, 2023).
The plaintiff in Reynolds drove to the hospital with her sister-in-law for medical testing. Id. at * 2. While both had been to the hospital before, due to COVID and construction in the emergency department, they had to take a different entrance into the hospital. Id. In the plaintiff’s attempt to navigate the parking lot, she allegedly tripped over a black wheel stop that was covered by a shadow. Id. The plaintiff sued the hospital as the landowner and the paving company working in the hospital’s parking lot, among others, under the theory that the failure to stripe the wheel stop, closing off spaces with the black wheel stops, or posting warnings about the condition of the parking lot would have prevented her fall. Id. at *2-3.
Read the court decisionRead the full story...Reprinted courtesy of
Lewis Brisbois
Pennsylvania Court Finds that Two Possible Causes Can Prove a Product Malfunction Theory of Liability
September 29, 2021 —
Gus Sara - The Subrogation StrategistIn Allstate Ins. Co. v. LG Elecs. USA, Inc., No. 19-3529, 2021 U.S. Dist. LEXIS 127014, the United States District Court for the Eastern District of Pennsylvania considered whether plaintiff’s expert engineer’s opinion that there were two possible causes of a fire—both related to alleged product defects within a refrigerator manufactured by the defendant—was sufficient to support the malfunction theory of products liability. The court found that because both potential causes imposed liability on the product manufacturer and the expert ruled out misuse of the product, as well as all external causes of the fire, it was not necessary for the engineer to identify a specific cause under the malfunction theory. The court also found that the expert’s investigation and opinions met the criteria set forth in Daubert v. Merrell Dow Pharms., Inc., 509 U.S. 579 (1993) and the Federal Rules of Evidence and, thus, were admissible.
LG Electronics arose from a fire at the home of Thomas and Lisa Ellis. The public sector fire investigator identified the area of fire origin as the top of a refrigerator manufactured by LG Electronics USA, Inc. (LG). The Ellises filed a claim with their homeowner’s insurance carrier, Allstate Insurance Company (Insurer). Insurer retained a fire investigator and an electrical engineer to investigate the origin and cause of the fire. The fire investigator agreed with the public sector investigator that the fire originated at the top of the refrigerator. The engineer conducted a forensic inspection of the scene and ruled out all potential external ignition sources. He then examined the internal components of the refrigerator. He found arcing activity on a wire at the front top of the refrigerator. He opined that there were two possible causes of the fire: either the heater circuit insulation failed over time due to mechanical damage, or the heat from the internal light fixture ignited combustible components of the refrigerator. Since the engineer ruled out improper use of the refrigerator, he opined that the damage was caused by a manufacturing defect.
Read the court decisionRead the full story...Reprinted courtesy of
Gus Sara, White and WilliamsMr. Sara may be contacted at
sarag@whiteandwilliams.com
Owner’s Obligation Giving Notice to Cure to Contractor and Analyzing Repair Protocol
November 23, 2016 —
David Adelstein – Florida Construction Legal UpdatesRecently, I read an informative article from another attorney addressing considerations of an owner when it receives a repair protocol in response to a Florida Statutes Chapter 558 notice of defect letter. This is a well-written article and raises two important issues applicable to construction defect disputes: 1) how is an owner supposed to respond to a repair protocol submitted by a contractor in accordance with Florida’s 558 notice of construction defects procedure and 2) irrespective of Florida’s 558 procedure, how is an owner supposed to treat a contractual notice to cure / notice of defect requirement that requires the owner to give the contractor a notice to cure a defect. This article raises such pertinent points that I wanted to address the issues and topics raised in this article.
558 Procedure–Owner’s Receipt of Contractor’s Repair Protocol
When a contractor submits a repair protocol to an owner in response to a notice of construction defects letter per Florida Statutes Chapter 558, the owner should seriously consider that protocol. The owner does this by discussing with counsel and any retained expert. The owner needs to know whether the protocol is a reasonable, cost-effective protocol to repair the asserted defects or, alternatively, whether the protocol is merely a band-aid approach and/or otherwise insufficiently addresses the claimed defects. Every scenario is different.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Katz, Barron, Squitero, Faust, Friedberg, English & Allen, P.A.Mr. Adelstein may be contacted at
dma@katzbarron.com
Relying Upon Improper Exclusion to Deny Coverage Allows Bad Faith Claim to Survive Summary Judgment
December 04, 2018 —
Tred R. Eyerly - Insurance Law HawaiiThe insurer was successful on summary judgment in establishing it correctly denied coverage for collapse, but its motion was denied regarding the insureds' bad faith claim. Jones v. State Farm Fire & Cas. Co., 2018 U.S. Dist. LEXIS 153102 (W.D. Wash. Sept. 7, 2018).
The insureds' retaining wall collapsed. They tendered to State Farm under their homeowners policy. An engineer retained by State Farm determined that the wall buckled due to "excessive lateral earth pressure from retained soils behind the wall." The parties agreed that the soil, saturated by water from frequent rain, grew too heavy for the retaining wall to bear, causing the collapse.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Coverage Doomed for Failing Obtain Insurer's Consent for Settlement
January 22, 2014 —
Tred R. Eyerly – Insurance Law HawaiiThe Fourth Circuit affirmed the district court's determination that there was no duty to indemnify after the insured settled without consent of the insurer. Perini/Tompkins Joint Venture v. ACE American Ins. Co., 2013 U.S. App. LEXIS 24865 (4th Cir. Dec. 16, 2013).
The insured, a joint venture, was hired as manager for the construction of a $900 million hotel and convention center. OCIP and excess policies were obtained through ACE. The project was also insured by a Builders Risk Policy through Factory Mutual Insurance Company.
During construction, a rod eroded, causing the atrium to collapse. Substantial property damage occurred and the completion of the project was delayed for several months.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Scaffolding Purchase Suggests No New Building for Board of Equalization
July 30, 2014 —
Beverley BevenFlorez-CDJ STAFFEmployees at California’s Board of Equalization spoke out against the Brown administration after the state purchased new scaffolding for the defect-riddled building, rather than finding a new facility, reported the Sacramento Bee. The existing scaffolding was leased for $10,000 per month, but the lease expired, prompting the purchase of new scaffolding for about $100,000.
The board’s Chairman Jerome Horton stated “that while the change may make financial sense in the short term, it sends a signal that the Department of General Services intends to keep Equalization’s 2,200 or so employees in the troubled building,” according to the Sacramento Bee.
Building problems include “toxic mold, defective elevators, leaking windows, corroded wastewater pipes, floods, and exterior glass panels that spontaneously break or pop off.” So far, $2.3 million has been paid “in connection with building-related employee injury claims” along with $60 million in repairs. However, an additional $115 million is estimated to completely fix the defects.
Read the court decisionRead the full story...Reprinted courtesy of
Tennessee Looks to Define Improvements to Real Property
January 27, 2020 —
Lian Skaf - The Subrogation StrategistFor subrogation practitioners dealing with an installation-based statute of repose, knowing what is an improvement to real property is the first battle in what can, but does not have to be, a long fight. Like many other states, Tennessee’s statute of repose bars claims based on improvements to real property. Tennessee’s statute of repose runs four years after substantial completion of the improvement. See Tennessee Code Ann. § 28-3-202. In the case of Maddox v. Olshan Found. Repair & Waterproofing Co. of Nashville, L.P., E A, 2019 Tenn.App. LEXIS 464, 2019 WL 4464816, the Court of Appeals of Tennessee examined whether or not the work done by the defendant, Olshan Foundation Repair & Waterproofing Co. of Nashville, L.P., E.A. (Olshan) — which addressed bowing walls, cracks in the foundation and walls and water intrusion — qualified as improvements to real property for the purposes of the statute of repose. The court held that the work by Olshan essentially amounted to repairs, and did not qualify as improvements to real property.
In Maddox, the plaintiff, Rachel Maddox (Maddox), noticed cracking in her home in 2005 and hired Olshan to assess the issue and conduct necessary repairs. Olshan made several recommendations and the parties agreed on Olshan’s proposal for the price of $27,000. From their initial work in 2005 until late 2011, Olshan visited the property several times to address ongoing structural issues with the home. Eventually, eight months after Olshan told Maddox they could not fix the house and failed to return her phone calls, Maddox filed suit, alleging fraud against the company.
After a three-day bench trial, the trial court found in favor of the plaintiff for $187,000, plus $15,0000 in punitive damages. Among other holdings, the court rejected Olshan’s statute of repose defense. Olshan appealed, raising the statute of repose issue again.
Read the court decisionRead the full story...Reprinted courtesy of
Lian Skaf, White and Williams LLPMr. Skaf may be contacted at
skafl@whiteandwilliams.com
Green Buildings Could Lead to Liabilities
March 28, 2012 —
CDJ STAFFAttempts to build “green,” reducing energy costs and increasing the use of sustainable building materials, may lead to more lawsuits, according to a report issued by the British Columbia Construction Association. The report warned those who were going to build green look into the implications. The report looked at the result of green building practices and requirements adopted in the United States.
The report warns that “the use of novel, less harmful building material or new construction techniques may give rise to liability due to: contractor inexperience with installation; lack of long-term evaluation of green materials; lack of understanding of how new building materials may impact existing traditional building systems; or warranties provided unintentionally about the durability or effectiveness of unproven materials or techniques.”
Manley McLachlan, president of the BCAA noted that they are aware of “legal action around the performance of the buildings,” noting that while fast-growing trees help toward LEED certification, their wood is more prone to mold. He also felt that low-VOC paints needed more testing to prove their durability as exterior finishes.
Read the full story…
Read the court decisionRead the full story...Reprinted courtesy of