Statute of Limitations Upheld in Construction Defect Case
September 30, 2011 —
CDJ STAFFThe Missouri Court of Appeals has ruled in Ball v. Friese Construction Co., finding that Mr. Ball’s claims were barred by the statute of limitations.
Mr. Ball hired Friese Construction Company to build a single-family home. The sale was completed on March 29, 2001. That December, Mr. Ball complained of cracks in the basement floor. SCI Engineering, n engineering firm, hired by Friese, determined that the home’s footing had settled and recommended that Mr. Ball hire a structural engineer to determine if the footings were properly designed and sized. In September 2002, the structural engineer, Strain Engineering, determined that the cracks were due to slab movement, caused in part by water beneath the slab, recommending measures to move water away from the foundation. In 2005, Mr. Ball sent Friese correspondence “detailing issues he was having with the home, including problems with the basement slab, chimney structure, drywall tape, and doors.” All of these were attributed to the foundation problems. In 2006, Friese stated that the slab movement was due to Ball’s failure to maintain the storm water drains.
In 2009, Ball received a report from GeoTest “stating the house was resting on highly plastic clay soils.” He sued Friese in May, 2010. Friese was granted a summary judgment dismissing the suit, as the Missouri has a five-year statute of limitations. Ball appealed on the grounds that the extent of the damage could not be determined until after the third expert report. The appeals court rejected this claim, noting that a reasonable person would have concluded that after the conclusion of SCI and Strain Engineering that “injury and substantial damages may have occurred.”
The court concluded that as there were not “continuing wrongs causing new and distinct damages,” he should have filed his lawsuit after the first two expert reports, not waiting seven years for a third expert to opine.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Contrasting Expert Opinions Result in Denial of Cross Motions for Summary Judgment
February 27, 2023 —
Tred R. Eyerly - Insurance Law HawaiiGiven the opposing experts' contradictory reports, the court denied both the insured and insurer's motions for summary judgment regarding coverage for a pipe leak. Pronti v. Hanover Ins. Co., 2022 U.S. Dist. LEXIS 222306 (W.D. N. Y. Dec. 9, 2022).
The insured had a swimming poll and spa, which functioned using a subsurface plumbing system, covered with concrete decking. A subsurface pipe began to leak, preventing the pool from properly functioning. The insureds gave notice under their homeowners' policy and contended that significant portions of the pool, spa, concrete decking and other landscaping had to be torn out to do repairs. The insurer retained an expert, Sarah G. Byer, a structural engineer, to investigate. The parties agreed that the pipe had a leak, but disputed if the location of the leak was specifically identified.
The parties also disputed the cause of the leak. Byer found that the most likely cause was deterioration incurred over the pipe's lifetime based on the age of the plumbing system and Byer's personal observation of the pipe. Byer further stated that the physical qualities of flexible PVC piping made it susceptible to damage from chlorine and water over time.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Defense Dept. IG: White House Email Stonewall Stalls Border Wall Contract Probe
December 14, 2020 —
Mary B. Powers & Debra K. Rubin - Engineering News-RecordAfter nearly one year of work, the U.S. Defense Dept.’s Inspector General can’t finish a congressionally-ordered probe of a $400-million U.S-Mexico border wall construction award last December to contractor Fisher Sand & Gravel because agency attorneys won't allow release of requested DOD and White House e-mails related to the contract, Acting Inspector General Sean O’Donnell said in a Nov. 30 report to Congress.
Reprinted courtesy of
Mary B. Powers, Engineering News-Record and
Debra K. Rubin, Engineering News-Record
Ms. Rubin may be contacted at rubind@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
More Hensel Phelps Ripples in the Statute of Limitations Pond?
February 03, 2020 —
Christopher G. Hill - Construction Law MusingsAs is always the case when I attend the Virginia State Bar’s annual construction law seminar, I come away from it with a few posts on recent cases and their implications. The first of these is not a construction case, but has implications relating to the state project related statute of limitations and indemnification issues for construction contracts brought out in stark relief in the now infamous Hensel Phelps case.
In Radiance Capital Receivables Fourteen, LLC v. Foster the Court considered a waiver of the statute of limitations found in a loan contract. The operative facts are that the waiver was found in a Continuing Guaranty contract and that the default happened more than 5 years prior to the date that Radiance filed suit to enforce its rights. When the defendants filed a plea in bar stating that the statute of limitations had run and therefore the claim was barred, Radiance of course argued that the defendants had waived their right to bring such a defense. The defendants responded that the waiver was invalid in that it violated the terms of Va. Code 8.01-232 that states among other things:
an unwritten promise not to plead the statute shall be void, and a written promise not to plead such statute shall be valid when (i) it is made to avoid or defer litigation pending settlement of any case, (ii) it is not made contemporaneously with any other contract, and (iii) it is made for an additional term not longer than the applicable limitations period.
The Circuit Court and ultimately the Supreme Court agreed with the defendants. In doing so, the Virginia Supreme Court rejected arguments of estoppel and an argument that a “waiver” is not a “promise not to plead.”
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
President Obama Vetoes Keystone Pipeline Bill
February 26, 2015 —
Angela Greiling Keane - Bloomberg(Bloomberg) -- President Barack Obama issued his third veto Tuesday to reject legislation that would allow construction of the Keystone XL pipeline, escalating a battle over the project with Republicans in Congress.
Notice of the long-expected veto was released without fanfare via a message to the Senate just hours after the bill formally arrived at the White House. The Senate has agreed to hold a vote on overriding the veto no later than March 3.
Obama has repeatedly said a State Department review of the TransCanada Corp. project -- which would carry crude oil produced in Alberta, Canada, south through the U.S. -- should proceed before a decision is made on whether to allow construction of the $8 billion pipeline.
Read the court decisionRead the full story...Reprinted courtesy of
Angela Greiling Keane, Bloomberg
New York Appellate Court Holds Insurer’s Failure to Defend Does Not Constitute a “Reasonable Excuse” Required to Overturn Judgment
January 21, 2019 —
Timothy Carroll & Anthony Miscioscia - White and WilliamsA recent opinion by the New York Supreme Court, Appellate Division (Second Department) highlights the potential risks for an insurer leaving an insured unrepresented while the insurer pursues other parties or insurers who may be primarily responsible for defending the insured. In refusing to overturn a default judgment entered against an insured while its insurer knew that a complaint had been filed but refused to defend, the New York court’s decision raises questions about how claims adjusters are to effectively manage new claims to prevent a default judgment being entered against the insured, while at the same time ensuring that the appropriate party or insurance company handles the insured’s defense.
In Kaung Hea Lee v. 354 Management Inc., 2018 N.Y. App. Div. LEXIS 7749 (N.Y. App. Div. Nov. 14, 2018) (354 Management) the underlying plaintiffs obtained a default judgment against the defendant insured due to its failure to answer the plaintiffs’ complaint. The plaintiffs then moved to determine the extent of damages to which they were entitled by virtue of the default judgment. The defendant opposed that motion, relying on an affidavit from a senior liability claims adjuster employed by the defendant’s insurer. “In the affidavit, the claim adjuster stated that she did not assign an attorney to answer the complaint because the codefendant . . . was contractually obligated to defend and indemnify the defendant [insured], and she had been attempting to have either [the codefendant] or its insurer provide an attorney” for the defendant. However, it was determined that the claims adjuster knew about the plaintiffs’ complaint two weeks after the plaintiffs served it on the defendant and months before the plaintiffs moved for default judgment. Despite this knowledge, the defendant’s insurer did not provide a defense or, apparently, obtain an extension of time to respond to the complaint, which led to the default judgment.
Reprinted courtesy of
Timothy Carroll, White and Williams and
Anthony Miscioscia, White and Williams
Mr. Carroll may be contacted at carrollt@whiteandwilliams.com
Mr. Miscioscia may be contacted at misciosciaa@whiteandwilliams.com
Read the court decisionRead the full story...Reprinted courtesy of
Construction Litigation Roundup: “The Jury Is Still Out”
October 30, 2023 —
Daniel Lund III - Lexology“The Seventh Amendment guarantees the right to a trial by jury for a legal claim in a civil action.” So, isn’t the law, well, the law?
Well, perhaps.
Some axioms to remember in contracting are that parties are typically able to agree in a contract to anything that is lawful, and that all such lawful agreements essentially become the “law” between the parties. It is on these principles that courts issue jurisprudence which becomes binding on future litigants – for example, concerning waiver of any right to trial by jury.
Hence, when a second-tier subcontractor on a federal project sought a jury for a lawsuit it had against a general contractor’s sureties, the sub was successfully rebuffed by the sureties based upon a waiver to trial by jury contained in the relevant subcontract. The court noted various matters to be considered in connection with the generally enforceable jury waiver – including the conspicuousness of the waiver (and, therefore, whether the subcontractor “knowingly” agreed to the waiver), as well as the relative bargaining power of the parties to the agreement (here, the sub was self-proclaimed to be a “leader in the construction contracting field”) – and affirmed the legality of the waiver.
Read the court decisionRead the full story...Reprinted courtesy of
Daniel Lund III, PhelpsMr. Lund may be contacted at
daniel.lund@phelps.com
$24 Million Verdict Against Material Supplier Overturned Where Plaintiff Failed to Prove Supplier’s Negligence or Breach of Contract Caused an SB800 Violation
November 21, 2017 —
Jon A. Turigliatto, Esq. & Chelsea L. Zwart, Esq. – Chapman Glucksman Dean Roeb & Barger BulletinOriginally published by CDJ on March 16, 2017
Acqua Vista Homeowners Assoc. v. MWL Inc. (2017) 2017 WL 371379
COURT OF APPEAL EXTENDS GREYSTONE HOMES, INC. v. MIDTEC, INC., HOLDING THAT CIVIL CODE §936 CREATES A NEGLIGENCE STANDARD FOR CLAIMS AGAINST MATERIAL SUPPLIERS BROUGHT UNDER SB800.
The Fourth District California Court of Appeal recently published its decision Acqua Vista Homeowners Assoc. v. MWI, Inc. (2017) 2017 WL 371379, holding that claims against a material supplier under SB800 (Civil Code §895 and §936) require proof that the SB800 violation was caused by the supplier's negligence or breach of contract.
Civil Code §936 states in relevant part, that it applies "to general contractors, subcontractors, material suppliers, individual product manufacturers, and design professionals to the extent that the general contractors, subcontractors, material suppliers, individual product manufacturers, and design professionals caused, in whole or in part, a violation of a particular standard as the result of a negligent act or omission or a breach of contract .... [T]he negligence standard in this section does not apply to any general contractor, subcontractor, material supplier, individual product manufacturer, or design professional with respect to claims for which strict liability would apply."
Reprinted courtesy of
Jon A. Turigliatto, Esq., Chapman Glucksman Dean Roeb & Barger and
Chelsea L. Zwart, Esq., Chapman Glucksman Dean Roeb & Barger
Mr. Turigliatto may be contacted at jturigliatto@cgdrblaw.com
Ms. Zwart may be contacted at czwart@cgdrblaw.com
Read the court decisionRead the full story...Reprinted courtesy of