Construction Litigation Roundup: “Wrap Music to an Insurer’s Ears?”
February 05, 2024 —
Daniel Lund III - LexologyThe general contractor on a New Orleans condominium construction project obtained a Contractor Controlled Insurance Program/CCIP policy or "Wrap-Up" policy for the job.
An accident occurred on the job when a construction elevator/hoist fell, injuring several workers. The elevator/hoist was provided by a subcontractor, pursuant to a rental agreement and related subcontract with the general contractor. Contained within the subcontract was a provision which states that the general contractor "has arranged for the Project to be insured under a controlled insurance program (the "CCIP" or "WrapUp"),” and that the CCIP shall provide "commercial general liability insurance and excess liability insurance, in connection with the performance of the Work at the Project site."
A third-party administrator for the wrap-up policy had been in communication with the subcontractor prior to the commencement of the work, “specifically advising that insurance coverage was not automatic” and providing the subcontractor with an enrollment form for the CCIP. Ultimately, the subcontractor “declined to comply with the request,” stating that the subcontractor would "not participate in paying any wrap insurance premiums" – because the subcontractor had its own insurance.
Read the court decisionRead the full story...Reprinted courtesy of
Daniel Lund III, PhelpsMr. Lund may be contacted at
daniel.lund@phelps.com
Delaware River Interstate Bridge Shut to Assess Truss Fracture
January 26, 2017 —
Justin Rice - Engineering News-RecordThe Delaware River Bridge, which runs between Pennsylvania and New Jersey, was shut down indefinitely over the Jan. 22-23 weekend, after a large fracture was discovered in the bridge that connects the turnpikes of the two states. The fracture on a steel truss below the bridge deck on the Pennsylvania side was discovered during a routine check as part of a painting operation. Steel plates were installed to temporarily reconnect the fracture and stabilize the 1.5-mile bridge, which is located in Bucks County on I-276 and accommodates 42,000 vehicles a day. As engineers assess how the damage will impact the entire bridge, a sample from the fractured truss was sent to a forensic lab to determine the cause of the crack. A high-definition video survey is being used to monitor the bridge.
Read the court decisionRead the full story...Reprinted courtesy of
Justin Rice, ENRMr. Rice may be contacted at
ricej@enr.com
Scotiabank Is Cautious on Canada Housing as RBC, BMO Seek Action
April 12, 2021 —
Shelly Hagan & Erik Hertzberg - BloombergBank of Nova Scotia, Canada’s third-largest lender, waded into the burgeoning debate over whether Justin Trudeau’s government should take immediate steps to cool the nation’s hot housing market, issuing a report that cautioned against rushing to implement new constraints.
In a report released Sunday, Scotiabank’s chief economist Jean-Francois Perrault said the recent run-up in home prices nationally over the past year was in large part driven by sluggish supply that failed to keep up with higher demand -- a trend that could reverse itself as new sellers enter the market in coming weeks. If the government does decide to take action, it should target housing speculators, he said.
Reprinted courtesy of
Shelly Hagan, Bloomberg and
Erik Hertzberg, Bloomberg Read the court decisionRead the full story...Reprinted courtesy of
Home Sales and Stock Price Up for D. R. Horton
February 04, 2013 —
CDJ STAFFThey call themselves "America's Builder," and in the last three months of 2013, D. R. Horton exceeded the market's predictions of how many of the homes they built would translate into sales. At the end of 2011, they had $27.7 million in earnings. At the end of last year, they saw $66.3 million in earnings. The 2011 earnings work out to 9 cents per share. Analysts were expecting 14 cents per share, but D. R. Horton delivered 20 cents per share.
The stock market responded with a 3.7% increase in the home builder's stock price, upping it by 79 cents to $22.10.
Read the court decisionRead the full story...Reprinted courtesy of
Appraisers’ Failure to Perform Assessment of Property’s Existence or Damage is Reversible Error
July 30, 2015 —
Christopher Kendrick and Valerie A. Moore – Haight Brown & Bonesteel LLPIn Lee v. California Capital Insurance Co. (No. A136280; filed 6/18/15), a California Court of Appeal held that it was error for an appraisal panel to assign loss values to items simply because they were listed in the insured’s scope of loss, and regardless of whether inspection revealed they were undamaged or never existed.
California Capital insured a twelve unit apartment building owned by Ms. Lee in Oakland, California. When a fire damaged one unit, the insurer prepared an estimate of $69,255 and paid an undisputed amount of $46,755, which was the amount of the estimate less depreciation and the deductible.
But Ms. Lee claimed that six of the units had been damaged, and she retained a public adjuster who submitted a claim exceeding $800,000. This included cleaning, asbestos abatement, reconstruction of the affected apartments, and loss of rent. She claimed burn damage to one unit and smoke damage requiring complete replacement of all the interior rooms of five apartments, along with removal of a portion of the stucco exterior and iron balcony railings and repainting of the entire building.
Reprinted courtesy of
Christopher Kendrick, Haight Brown & Bonesteel LLP and
Valerie A. Moore, Haight Brown & Bonesteel LLP
Mr. Kendrick may be contacted at ckendrick@hbblaw.com; Ms. Moore may be contacted at vmoore@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Another Colorado Construction Defect Reform Bill Dies
May 07, 2014 —
Beverley BevenFlorez-CDJ STAFFColorado construction defects reform Senate Bill 220 died when “Senate President Morgan Carroll, D-Aurora, declined to call a second committee to hear” the bill, according to Ed Sealover writing for the Denver Business Journal. Sen. Carroll declared that the “bill backers” did not incorporate any of the “suggestions she or House Speaker Mark Ferrandino had given them.”
“SB 220 would have required condo-unit owners to submit to alternative-dispute resolution such as arbitration or mediation if the unit developer required it,” Sealover reported. “And it would have required that a majority of members of a homeowners association agree to file a lawsuit, a standard significantly larger than the two-person bar that now must be met.”
Bill Cosponsor Sen. Mark Scheffel, R-Castle Rock, “believes litigation reform” will become “an election issue and” that it “has strong momentum heading into the 2015 session.”
Read the court decisionRead the full story...Reprinted courtesy of
Top 10 Take-Aways from the 2024 Fall Forum Meeting in Pittsburgh
December 03, 2024 —
Marissa L. Downs - The Dispute ResolverOver 500 construction law attorneys and consultants convened last week at the confluence of three rivers in what became the first-ever meeting in Pittsburgh, Pennsylvania of the ABA Forum on Construction Law. The Steel City was a fitting backdrop for a meeting focused on issues of design in construction. Thanks to the hard work of many, most notably the newly minted Forum Chair Keith Bergeron and Meeting Coordinators Kendall Woods and Michael Clark, the meeting's attendees brought home new connections and a host of new lessons learned. Read on for my top 10 take-aways from the 2024 Fall Meeting in Pittsburgh and feel free to share yours in the comments below.
10. An architect's standard of care does not require perfection. A common refrain across many of the meeting's plenary sessions was that any design that is produced by human hands will never be perfect. In recognition of our own fallibility, the legal standard to which design professionals will be held to account does not require that their designs be error-free. A design professional must generally exercise the degree of care and skill ordinarily exercised by professionals performing similar services under similar circumstances. Establishing what that means in each locality will vary and will most likely need to be supported by the expert opinion of another practicing design professional.
Read the court decisionRead the full story...Reprinted courtesy of
Marissa L. Downs, Laurie & Brennan, LLPMs. Downs may be contacted at
mdowns@lauriebrennan.com
PATH Station Designed by Architect Known for Beautiful Structures, Defects, and Cost Overruns
October 01, 2013 —
CDJ STAFFThe new PATH station at the World Trade Center site in New York is six years behind schedule and its cost has doubled to $4 billion dollars. But maybe New Yorkers shouldn’t be surprised. The New York Times reports that the Port Authority, which operates the PATH trains between New York and New Jersey, hired Santiago Calatrava, an architect whose work has frequently lead to cost overruns and claims of defects.
The problems in lower Manhattan are not all Mr. Calatrava’s fault. Auditors described the Port Authority as “a challenged and dysfunctional organization.” (A separate report in the New York Times notes that a former PATH executive may have walked away with the rights to the words “World Trade Center” for $10. The company he subsequently founded, The World Trade Center Association, charges millions for the use of the name.)
One problem with Mr. Calatrava’s design for the station is that he insisted that all the mechanical elements of the station be located in other buildings. Further, the Port Authority might want to examine those plans carefully. In the design for a museum in Valencia, Spain, Mr. Calatrava forgot to provide for handicap access or fire escapes. That project, according to the Times tripled in cost as it was built.
Read the court decisionRead the full story...Reprinted courtesy of