Bertha – The Tunnel is Finished, but Her Legacy Continues
September 28, 2017 —
John P. Ahlers - Ahlers & Cressman PLLCThe Tunnel Boring Machine (“TBM”) known as “Bertha,” built by Hitachi Zosen Corp in Osaka, Japan, was the world’s largest TBM at 57.5 ft. in diameter. The TBM was built to drill the Seattle SR 99 Viaduct replacement tunnel. Seattle Tunnel Partners (“STP”) has a contract with the Washington State Department of Transportation (WSDOT) to dig the two-mile tunnel which is now complete.
In December of 2013, tunneling was stopped ostensibly because a 119 ft.-long, eight-inch diameter steel well casing halted the TBM. See 2/15 Blog “Bertha is Stuck and She Remains Mired in Controversy.” Reports are that WSDOT installed the pipe in 2002 to measure groundwater levels and the pipe was allegedly mentioned in the reference material provided to bidders. STP had assumed that the pipe had been removed until the steel casing got stuck in Bertha’s cutting teeth, halting progress. See 1/30/14 Blog “Big Bertha Stuck: Differing Site Condition Principles Revisited.” STP had a design-build contract with WSDOT. The contract contains a Differing Site Conditions (“DSC”) clause pursuant to which if the contractor can prove that the eight-inch pipe was an unforeseen condition (not disclosed in the contract documents), and that the unforeseen condition caused the TBM’s failure, STP is entitled to an equitable adjustment of its contract.
Read the court decisionRead the full story...Reprinted courtesy of
John P. Ahlers, Ahlers & Cressman PLLCMr. Ahlers may be contacted at
jahlers@ac-lawyers.com
Housing Starts in U.S. Surge to Seven-Year High as Weather Warms
May 20, 2015 —
Sho Chandra – BloombergNew residential construction in the U.S. surged in April to the highest level in more than seven years, indicating the industry has moved beyond a weather-related soft patch to regain strength.
Housing starts jumped 20.2 percent to a 1.14 million annualized rate, the most since November 2007, from a 944,000 pace in March, a Commerce Department report showed Tuesday in Washington. The median forecast of 83 economists surveyed by Bloomberg was 1.02 million. More permits, a proxy for future construction, were issued than at any time since June 2008.
An improving labor market and mortgage costs close to multiyear lows are reviving residential construction, a sign that the weakness in early 2015 was probably due to harsh winter weather. Builders including PulteGroup Inc. have said the spring selling season is off to a good start, and sentiment data for May showed developers are optimistic about the next six months.
Read the court decisionRead the full story...Reprinted courtesy of
Shobhana Chandra, Bloomberg
Texas Federal District Court Dismisses COVID-19 Claim
October 25, 2020 —
Tred R. Eyerly - Insurance Law HawaiiJudge Ezra, formerly on the bench in Hawaii, dismissed a COVID-19 claim pursued by a Texas policy holder. Diesel Barbershop, LLC v. State Farm Lloyds, 2020 U.S. Dist. LEXIS 147276 (W.D. Texas Aug. 13, 2020).
Local and state officials in Texas issued shutdown orders in March 2020 due to the spread of the cornavirus. All non-essential businesses, including the insureds' barbershop businesses, were ordered closed from April 2, 2020 until April 30, 2020. The insureds submitted a claim for business interruption and civil authority coverage to their carrier, State Farm. The claim was denied based on the policy's exclusion for loss caused by enforcement of ordinance or law, virus, and consequential losses. For Civil Authority coverage, State Farm contended the policy required that there by physical damage within one mile of the described property and that the damage be the result of a Covered Cause of Loss, which, State Farm asserted, a virus was not.
The insureds sued and State Farm moved to dismiss. The court noted cases in which courts had found physical loss even without tangible destruction to the covered property. Yet, the court found that the line of cases requiring tangible injury to property were more persuasive. Therefore, the court found that the insureds failed to plead a direct physical loss.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Key Amendments to Insurance Claims-Handling Regulations in Puerto Rico
September 23, 2019 —
Andres Avila & Richard W. Brown - SDV InsightsPolicyholders in Puerto Rico should be aware of significant benefits provided by recent amendments to the Insurance Code. New rules establish an expedited method of property insurance dispute resolution, mandatory expedited partial payments in the event of catastrophic events, and protection against bad faith claims handling by insurers.
Appraisal Process with a Puerto Rican Twist
A key amendment is the establishment of an appraisal process, widely used for many years in the United States and now adopted in Puerto Rico. Commercial and personal property insurers in Puerto Rico shall include, in their policies, a clause for an appraisal process according to Article 11.150 of the Insurance Code of Puerto Rico, 26 L.P.R.A. § 101 et seq. (“the Code”).
The appraisal process provides both policyholders and insurers the option to submit insurance claims to an impartial umpire if a dispute arises over the value of covered damages or losses. The umpire and appraisers do not have authority to resolve coverage or legal issues. They can only resolve disputes over the quantum claimed for losses already determined to be covered by the insurer. Id. Each party is required to pay its own appraiser’s fees and split equally the fees of the umpire. Id.
Reprinted courtesy of
Andres Avila, Saxe Doernberger & Vita, P.C. and
Richard W. Brown, Saxe Doernberger & Vita, P.C.
Mr. Avila may be contacted at ara@sdvlaw.com
Mr. Brown may be contacted at rwb@sdvlaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Navigating Abandonment of a Construction Project
March 02, 2020 —
Bremer Whyte Brown & O’MearaNo construction or real estate developments goes completely as planned. Despite the expectation that modifications will likely be necessary to finalize a project, far too many parties suffer losses related to these projects.
In California, abandonment of a project without legal excuse gives rise to a legal claim. An abandonment occurs if there was a material failure to complete any construction project or operation for the price stated in the contract or in any modification of the contact. If abandonment occurs, litigation likely follows.
Disputes most commonly arise when the parties fail to retain a paper trail. Therefore, to limit litigation, document everything. Change orders can offer protection, but they must be in writing. Handshakes or oral promises are not sufficient. Rather, obtain written agreements signed by the contractor, and retain all documentation provided by the contractor, including invoices, receipts, work estimates and change orders.
If the construction project has been abandoned, take photographs and/or videos of the job as it appears. To mitigate damages, preserve any leftover materials that a new contractor may be able to use.
Read the court decisionRead the full story...Reprinted courtesy of
Bremer Whyte Brown & O’Meara
Appeals Court Reverses Summary Judgment over Defective Archway Construction
February 10, 2012 —
CDJ STAFFA judge has ruled that a plaintiff can go forward with her suit that she was injured by a defective archway during a birthday party. A three-judge panel of the California Court of Appeals issued this ruling on January 23, 2012, in the case of Trujillo v. Cosio.
Ms. Trujillo attended a birthday party at the home of Maria Cosio and Joel Verduzco. A piñata was hung between a tree and a brick archway. Ms. Trujillo went to get candy that had fallen from the piñata, during which the archway fell on her hand. Subsequent examination of the archway showed that it had not been “properly anchored to the supporting pillars to protect the arch from falling.”
Ms. Cosio and Mr. Verduzco argued that they could not have been aware of the defective nature of the archway’s construction, as it had been built at the request of the prior property owner. The structure was constructed without building permits. Mark Burns, a civil engineer testifying for the plaintiff, said that “a reasonable property owner would have thoroughly tested the archway to ensure it was capable of withstanding such horizontal forces before allowing children to enter into the area.” Mr. Burns noted that twenty rope pulls would have been sufficient to demonstrate the structure’s instability.
The trial court rejected Mr. Burn’s statements, finding that the respondents did not have any knowledge of the defect and that a visual inspection should have sufficed. The court noted that this a triable issue, whether visual inspection suffices, or whether the property owners should have done as Mr. Burns suggested and yank a rope twenty times. The court noted that “although a jury may ultimately disagree with Burn’s opinion, it was supported by sufficient foundation and was not speculative.”
The opinion was written by Judge Flier, with Judges Rubin and Grimes concurring.
Read the court’s decison…
Read the court decisionRead the full story...Reprinted courtesy of
Prevailing Parties Entitled to Contractual Attorneys’ Fees Under California CCP §1717 Notwithstanding Declaration That Contract is Void Under California Government Code §1090
December 20, 2017 —
Zachary Price & Lawrence ZuckerIn California-American Water Co. v. Marina Coast Water District (Nos. A146166, 146405, filed 12/15/17), the First District Court of Appeal held that a prevailing party was entitled to an award of contractual attorneys’ fees under Code of Civil Procedure §1717 even though the underlying contracts were declared void under Government Code §1090.
Appellant Marina Coast Water District (“Marina”) and Respondent Monterey County Water Resources Agency (“Monterey”), both public water agencies, and Respondent California-American Water Company (“California-American”), a water utility, entered into several contracts to collaborate on a water desalination project. The parties agreed that the prevailing party of any action in any way arising from their agreements would be entitled to an award of attorneys’ fees.
Reprinted courtesy of
Zachary Price, Haight Brown & Bonesteel LLP and
Lawrence Zucker, Haight Brown & Bonesteel LLP
Mr. Price may be contacted at zprice@hbblaw.com
Mr. Zucker may be contacted at lzucker@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Alaska Supreme Court Finds Insurer Owes No Independent Duty to Injured Party
December 14, 2020 —
Tred R. Eyerly - Insurance Law HawaiiAfter the victim incurred injury inflicted by an insured party, the Alaska Supreme Court determined that the insurer owed no duty to the injured party. Martinez v. Government Employees Ins. Co., 2020 Alaska LEXIS 111 (Alaska Sept. 4, 2020).
Joshua Martinez lost control of his truck and crashed into Charles Burnett's cabin. The cabin's heating fuel tank was damaged, and fuel drained onto the property and under the cabin. Burnett further alleged he suffered bodily injuries.
Martinez was insured by GEICO under an auto policy. Two days after the accident, the state Department of Environmental Conservation (DEC) advised GEICO to hire a qualified environmental consultant and crew to clean up the fuel spill. Burnett told GEICO he wanted to do the cleanup himself and offered to do so for $25,000, the approximate amount of the consultant retained by GEICO. DEC did not consider Burnett qualified to handle the cleanup.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com