Project Completion Determines Mechanics Lien Recording Deadline
April 08, 2024 —
William L. Porter - Porter Law GroupThe California mechanics lien is one of the most powerful collection remedies available to contractors, subcontractors and suppliers who are unpaid for work performed and materials supplied in relation to a California private works construction project. The mechanics lien allows the claimant to actually sell the property where the work was carried out in order to obtain payment, entirely of course, against the wishes of the property owner. There are a number of important steps to follow and timelines to be met in order to pursue this remedy.
First, Understand Your Preliminary Notice Deadline
Working within deadlines is absolutely crucial to preserving mechanics lien rights under California law. The deadlines differ, depending on whether you are a “direct” contractor, also known as “original” or “prime” contractor (one who contracts directly with the property owner) or a subcontractor or material supplier. The process begins with the serving of a “preliminary notice” no later than 20 days after the party serving the preliminary notice begins supplying labor or materials to the project. Direct contractors are only required to serve the preliminary notice on the construction lender (Civil Code section 8200-8216), whereas subcontractors and material suppliers must serve not only the construction lender, but also the owner and direct contractor (see Civil Code section 8200(e)).
Read the court decisionRead the full story...Reprinted courtesy of
William L. Porter, Porter Law GroupMr. Porter may be contacted at
bporter@porterlaw.com
The Basics of Subcontractor Defaults – Key Considerations
February 15, 2021 —
Gerard J. Onorata - Peckar & Abramson, P.C.The success of general contractors in completing a construction project is often dependent upon the performance of their subcontractors. General contractors have frequently said exactly this. Traditionally, the key subcontractors on a project are the electrical, plumbing, HVAC and structural steel subs. Due to the fundamental nature of the work performed by these trades, the risk of defaulting and terminating one or more of them is likely to have a substantial impact on the project, more so than with the trade contractors that perform their work after a building is made weather tight (i.e., drywall, tile, painting).
Most general contractors have, over a period of years, established longstanding relationships with certain subcontractors that they have come to depend upon. The risk of having to default and terminate one of these subs is minimal. Nevertheless, there will inevitably arise occasions when even a once reliable subcontractor fails to perform and it becomes necessary to invoke the remedies of default and termination. Areas ripe for controversy with subcontractors that often can lead to default and termination often involve disputes over change orders and the scope of work, the installation of defective work and the back-charges that ensue therefrom, and, to a lesser extent, conflicts that arise from ambiguous plans and specifications and the extra work and delays caused by the discovery of unforeseen site conditions.
Read the court decisionRead the full story...Reprinted courtesy of
Gerard J. Onorata, Peckar & Abramson, P.C.Mr. Onorata may be contacted at
gonorata@pecklaw.com
Is Your Construction Business Feeling the Effects of the Final DBA Rule?
June 04, 2024 —
Nathaniel Peniston - Construction ExecutiveThe Biden administration’s final rule “Updating the Davis-Bacon and Related Acts Regulations” took effect on Oct. 23, 2023. In “the first comprehensive regulatory review in nearly 40 years,” the Department of Labor has returned to the definition of “prevailing wage” it used from 1935 to 1983—before Microsoft released the first Windows operating system.
Construction industry leaders must be aware that this is the most comprehensive review and overhaul of the act in 40 years; with it, the DOL has attempted to modernize its approach to wage creation and fringe benefit allocation. There are more than 50 procedural changes to the act, which means it is very important for contractors to be aware of wage classifications when bidding, performing work on Davis-Bacon Act projects and using applicable fringe dollars for bona fide benefits.
UNDERSTANDING THE CHANGES
Some of the critical adjustments included in the final rule that contractors should be aware of include:
Wage determination changes during a project: Historically, contractors could rely on the wage determinations used to win a project for the life of the project. However, the final rule now requires the contractor to use current wage determinations when a contract is changed or extended. The DOL “proposed this change because—like a new contract—the exercise of an option requires the incorporation of the most current wage determination.”
Reprinted courtesy of
Nathaniel Peniston, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Mr. Peniston may be contacted at
npeniston@fbg.com
Washington Court Denies Subcontractor’s Claim Based on Contractual Change and Notice Provisions
January 29, 2024 —
Wendy Rosenstein - Ahlers Cressman & Sleight PLLCThe recent unpublished case, Cascade Civil Construction, LLC v. Jackson Dean Construction, Inc., et al.,[1] provides a legal justification for contractors to require a directive or change order in advance of performing changed work—thereby preventing the party who requested the changed work from later arguing that notice provisions were not complied with.
In the case, Jackson Dean, the prime contractor, hired Cascade to perform excavation work on a project to build a new Costco Corporate headquarters. Due to the Covid-19 pandemic and other issues, Jackson Dean directed resequencing, which required Cascade to perform excavation concurrent to dewatering. Jackson Dean also required deeper-than-planned excavation under one of the buildings.
Read the court decisionRead the full story...Reprinted courtesy of
Wendy Rosenstein, Ahlers Cressman & Sleight PLLCMs. Rosenstein may be contacted at
wendy.rosenstein@acslawyers.com
The Vallagio HOA Appeals the Decision from the Colorado Court of Appeals
August 04, 2015 —
David M. McLain – Colorado Construction LitigationAs highlighted in our most recent post, the Colorado Court of Appeals’ Vallagio decision upheld a declaration provision that prohibited the amendment of a mandatory arbitration clause without the consent of the developer/declarant. Vallagio at Inverness Residential Condominium Association, Inc. v. Metropolitan Homes, Inc., et al., 2015COA65 (Colo. App. May 7, 2015). This case protects a developer/declarant’s ability to arbitrate construction defect claims with a well-crafted declaration that requires declarant consent in order to amend the mandatory arbitration provisions for construction defect actions.
However, the Vallagio ruling still hangs in the balance while the Colorado Supreme Court considers the condominium association’s petition for certiorari review, filed June 18, 2015. In its petition, the association argues that the declarant consent requirement violates public policy and four separate sections of the Colorado Common Interest Act (“CCIOA”).
For instance, the association argued in the courts below that a declarant consent requirement violates section 217 of CCIOA, which governs unit owners’ voting percentage requirements and provides that declarations may not require more than 67% affirmative vote for amendments. The Court of Appeals rejected this argument, reasoning that other provisions of section 217 contemplate consent requirements by parties other than unit owners, such as first mortgagees.
Read the court decisionRead the full story...Reprinted courtesy of
David M. McLain, Higgins, Hopkins, McLain & Roswell, LLCMr. McLain may be contacted at
mclain@hhmrlaw.com
Pipeline Safety Violations Cause of Explosion that Killed 8
April 02, 2014 —
Beverley BevenFlorez-CDJ STAFFBloomberg Business Week reported that “PG&E Corp. (PCG:US), owner of California’s largest utility, was charged with 12 pipeline safety violations by the U.S. government for a 2010 natural gas explosion that killed eight people and left a crater the size of a house.”
PG&E was charged “with knowingly and willfully violating the Natural Gas Pipeline Safety Act by failing to test and assess unstable pipelines to determine whether they could fail.”
Furthermore, “Federal investigators are studying whether a leaking gas main operated by Consolidated Edison Inc. (ED:US) contributed to an explosion in New York City last month that also claimed eight lives.”
Read the court decisionRead the full story...Reprinted courtesy of
Motion to Strike Insurer's Expert Opinion Granted
August 13, 2019 —
Tred R. Eyerly - Insurance Law HawaiiThe court granted the insured's motion to strike the testimony of the insurer's expert because the opinion lacked sufficient explanation or analysis. Affinity Mut. Ins. v. Thacker Air Conditioning Refrigeration Heating, 2019 U.S. Dist. LEXIS 84713 (N.D. Ind. May 20, 2019).
The insured owned a market that needed renovations. The roof over an addition to the market extended from the wall of the extension to the top of the existing roof. The area between the old and new roofs was filled with blown-in insulation, so that the structural support from the new overbuilt roof was not visible. The weight of the overbuilt roof rested on top of the existing roof at the point where they met. This added additional weight on the trusses supporting the main roof.
In 2014, the market upgraded the building with heating and insulation. Thacker was a subcontractor for work on the hearing system. Six gas furnaces, spaced about 35 feet apart along the length of the building, were placed by Thacker. The total weight of each unit was estimated at 280 pounds.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Fire Tests Inspire More Robust Timber Product Standard
March 22, 2018 —
Nadine M. Post– ENRBased on recent fire test results, mass timber groups have adjusted product certification standards to require the use of cross-laminated timber with structural adhesives tested to demonstrate better fire performance.
Read the court decisionRead the full story...Reprinted courtesy of
Nadine M. Post, Engineering News-RecordMs. Post may be contacted at
postn@enr.com